Text
                    ripple stitch
patterns
exciting patterns to knit and crochet
for afghans, blankets, and throws
JAN EATON


ALTERNATIVE PATTERNS TO USE 22 Beaumont Texture (knit) This delightfully lacy pattern is quick and easy to knit and looks good worked in most weights of yarn. 82 Delicate Lace (crochet) Bands of pretty crochet lace are divided by bands of solidly worked stitches to make a soft fabric with good drape. 100 Fishtail Lace (knit) Many of the classic lace stitches, such as this pretty fishtail pattern, knit into wonderful wraps, whether plain or striped. • 166 Norfolk Shells (crochet) Similar in construction to Delicate Lace (above), this pattern is less lacy and would make a substantial winter wrap. RIPPLE PATTERNS FOR Mohair Wrap Stitch pattern Feather and Fan, page 58 Needles: Pair of size 5 single-pointed needles (4mm) or size needed to achieve gauge. Pattern repeat: Multiple of 14 stitches plus 1. Gauge: 18 sts and 23 rows to 4in (10cm) over pattern after blocking, yarn used double. Size and colors: The wrap in the photograph is worked in a beautiful deep red yarn spun from kid mohair and silk. The yarn is used double throughout. The wrap measures 19in x 64in (48cm x 162cm) after blocking. Yarn requirements: 1374 yds (1260m) of Rowan Kidsilk Haze (or lightweight mohair yarn with 229 yds (210m) per 0.8oz (25g) ball) in 606 Candy Girl. Working the mohair wrap Using two strands of yarn, CO the required number of stitches for 7 pattern repeats. Follow the stitch pattern on page 58, working in two strands of yarn throughout until the yarn is used up, ending with a Row 4. BO. Finishing the mohair wrap Sew in all the ends. Block and allow to dry.
STITCH COLLECTION В! » Blue Lagoon @@ 11 Worked in a selection of cool colors, raised ridges accentuate the softly curving waves made by this stitch pattern. Change the look by working deep bands in the main yarn color with narrow bands of two contrasting yarns. Special abbreviation inc = increase one stitch by lifting horizontal thread between last stitch worked and next stitch and knitting into the back of it. Using yarn A, CO a multiple of 11 sis. ROW 1: (RS) K. ROW 2: KI, PtO lasts!. KI. ROW3: |P2togl twice, line, K1| three times, inc, * [P2tog| four times, line, KI I three times, inc; rep from * to last 4 sts, |P2tog| twice. • о row4: KI. P to last st, Ki. Rep Rows 1-4, changing yarns in the following color sequence and ending with a Row 4: 4 rows in yarn A, 4 rows in yarn B, 4 rows in yarn A. 4 rows in yarn C. Repeat for length required. BO. NOTE: Don't break main yarn at color changes, instead carry the yarn loosely up the side of the work. Using yam A. CO as left. Rep Rows 1—1, changing yams in the following color sequence and ending with a Row 4: 8 rows in yarn A, 1 row In yarn B, 2 rows in yarn C, I row in yarn B, 8 rows in yarn A. Repeat for length required. BO. NOTE: Don't break main yarn at color changes, instead carry the yarn loosely up the side of the work. 16
stitch collection FOUNDATION CHAIN: multiple of 27 chains plus 3, Using yarn A, make the required length of foundation chain. row i: (RS) 1 de into 3rd ch from hook, ch 1, [sk next ch, 1 de into next ch, ch 11 five times, sk next ch, 3 de into next ch, ch 3, 3 de into next ch, ch 1, |sk next ch. 1 de into next ch, ch 1) five times, * sk next ch. dc3tog over next 3 chs, ch 1. |sk next ch, 1 de into next di, ch 11 five times, sk next ch, 3 de into next ch, ch 3, 3 de into next ch, ch 1. |sk next ch. 1 de into next ch. ch 11 five times; rep from * to last 4 chs, [sk next ch, 1 de into next chi twice, turn. row 2: Ch 3. sk first 2 de. |1 de into next de, ch 11 six limes, sk next 2 de, [3 de, ch 3, 3 de) into next ch-3 sp. И1 Scottish Mists This delightfully lacy crochet stitch makes a delicate lightweight fabric that drapes well for shawls and wraps. The chevron pattern looks equally effective worked in just one color or in a stripe pattern. ch 1. sk next 2 de, |1 de into next de. ch 11 five times, * dc3tog over next de, top of next dc3tog and next de, ch 1, |1 de into next de, ch 1] five limes, sk next 2 de, 13 de, ch 3, 3 de) into next ch-3 sp, ch 1. sk next 2 de, |1 de into next de, ch 11 five times; rep from * to Iasi 2 de, 1 de inlo each of last 2 de, turn. El Deep Seas Using yarn A, make the foundation chain and work Row I as left. Rep Row 2, changing yarns in the following color sequence: 8 rows in yam A. I row in yarn В 8 rows in yarn C. Repeal for length required. Fasten off yarn. Rep Row 2. changing yarns in the following color sequence: 3 rows in yarn A, 2 rows in yarn B, 1 row in yarn C, 5 rows in yarn A, 1 row in yarn C, 2 rows in yarn B. Repeat for length required. Fasten off yarn. < O« 17
SI •• El Shaded Chevrons Add regular increases and decreases to a stripe pattern knitted in stockinette stitch and create an attractive chevron pattern. Incorporate a different yarn texture such as mohair or a velvet-finish yam to make softer, less distinct stripes. Special abbreviation inc = increase by knitting into front and back ol next stitch. Using yarn A, CO a multiple of 16 sts plus 2. rowi: (WS) KI, P to last st, KI. ROW2: KI, inc in next st, KS, si I. KI. psso, K2tog, K5, * inc in each of next 2 sts, K5, si 1, KI, psso, K2tog, KS; rep from * to last 2 sts, inc in next si, K1. Rep Rows I and 2, changing yarns in the following color sequence and ending with a Row 2: 8 rows in yarn A, 2 rows in yarn B, 4 rows in yarn C, 2 rows in yarn D, 2 rows in yarn E. 2 rows in yarn A, 2 rows in yam B. Repeat for length required. BO. Ю1 Velvet Chevrons Using yarn A, CO as left. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 8 rows in yarn A, 2 rows in yarn B. 16 rows in yarn A, 2 rows in yarn C, 8 rows in yam A. Repeat for length required. BO. NOTE: At color changes, don't break main yarn, instead carry it loosely up the side of the work. SPECIAL YARN KEY В cream velvet yarn C green velvet yarn 0«« Bfl Mohair Chevrons Using yarn A, CO as above. Rep Rows I and 2. changing yarns in the following color sequence and ending with a Row 2: 4 rows in yarn A, 4 rows in yarn B. SPECIAL YARN KEY В gray mohair yarn Repeat for length required. BO. NOTE: At color changes, don't break yarn, instead carry yarn not in use loosely up side of work.
STITCH COLLECTION Д Soft Wave s Cream, turquoise, and pale green stripes combine to make a pattern of curving, undulating waves. Change the effect by simply altering your yarn colors to pale gray and dark gray. FOUNDATION CHAIN: multiple of 12 chains plus 3. Special abbreviation dc2tog = work 2 double crochet stitches together to decrease I stitch (work 2 incomplete double crochet stitches, keeping last loop of each stitch on the hook. Yarn over hook and draw through all 3 loops on hook). Using yarn A, make the required length of foundation chain. row i: (RS) 1 de into 4th ch from hook, * 1 de into each of next 3 chs, [dc2tog| twice. I de into each of next 3 chs, [2 de into next chi twice; rep from * ending last rep with 2 de into last ch, turn. ROW 2: Ch 3. 1 de into same st. * 1 de into each of next 3 de, [dc2tog| twice, I de into each of next 3 de, 12 de into next del twice; rep from * ending last rep with 2 de into 3rd of beg skipped ch-3, turn. ROW 3: Ch 3, 1 de into same st, * 1 de into each of next 3 de, |dc2tog| twice, 1 de into each of next 3 de, |2 de into next del twice; rep from * ending last rep with 2 de into 3rd of ch-3, turn. Rep Row 3, changing yarns in the following color sequence: 4 rows in yam A, 1 row in yarn B, 2 rows in yarn C, 3 rows in yarn D. 4 rows in yarn E. Repeat for length required. Fasten off yarn. El Monochrome Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yarns in the following color sequence: 1 row in yarn A, 2 rows in yarn B. Repeal for length required. Fasten off yarn. 19
STITCH COLLECTION Bl @@ EQ Fairground Based on a traditional Shetland lace stitch, this stitch pattern contrasts a multicolored yam with a solid colored cotton tape. The variation is worked in bright, zinging colors to make a strongly patterned fabric. Special abbreviation ssk = slip. slip, knit /slip next two stitches one at a time, insert left needle into fronts of slipped Stitches and knit them together). Using yarn A. CO a multiple of 13 sts plus 2. ROW 1: (RS) KI, * ssk, K9, K2tog; rep from * to last st, KI. ROW 2: KI, P to last St, KI. row3: KI, *ssk, K7. K2tog; rep from * to last st, KI. ROW 4: Rep Row 2. ROW 5: К1. * ssk, |YO, K11 five limes, YO, K2tog; rep from * to last st, KI. ROW 6: K. Rep Rws 1 -6. changing yams in the following color sequence and ending with a Row 6: 6 rows in yam A, 6 rows in yarn B. Repeat for length required. BO. NOTES: Slip all stitches knitwise. At color changes, don’t break main yarn, instead carry it loosely up side of work. SPECIAL YARN KEY A multicolor aran yam В paprika cotton tape ©ООО Mil Fiesta : Using yarn A, CO as left. i Rep Rows 1-6, changing yarns in the ; following color sequence and ending : with a Row 6: 2 rows in yarn A. 2 rows in yam В 2 rows in yam A. 2 rows in yam C. 2 rows in yam A. 2 rows in yam C, 2 rows in yam A. 2 rows in yarn D. 2 rows in yarn A. 2 rows in yarn B, 2 rows in yarn A. 2 rows in yarn B. 2 rows in yam A, 2 rows in yarn C, 2 rows in yam A, 2 rows in yarn D, 2 rows in yarn A. 2 rows in yarn D. ; Repeat for length required. : BO. NOTE: At color changes, don’t break yarn, instead carry it loosely up side of work. 20
STITCH COLLECTION КЗ Sahara Strong, hot colors combine with narrow stripes of turquoise and blue to accentuate the deep zigzag pattern of this stitch. The pattern looks equally effective worked in deep bands of contrasting colors. FOUNDATION CHAIN: multiple of 24 chains plus 2. Using yarn A, make the required length of foundation chain. row 1: (RS) 2 sc into 2nd ch from hook, * 1 sc into each of next 11 chs, sk next ch, 1 sc into each of next 11 chs, 3 sc into next ch; rep from * to end, ending last rep with 2 sc into last ch, turn. row 2: Ch 1, 2 sc into first sc, * 1 sc into each of next 11 sc, sk next 2 sc, 1 sc into each of next 11 sc, 3 sc into next sc; rep from * to end, ending last rep with 2 sc into last sc, turn. Rep Row 2, changing yams in the following color sequence: 4 rows in yarn A. 1 row in yarn B. 2 rows in yarn C, 3 rows in yarn D, 4 rows in yarn A. 1 row in yarn В 2 rows in yam E, 3 rows in yarn D. Repeat for length required. Fasten off yarn. KR1 Casbah Using yarn A. make the foundation chain and work Row 1 as left. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 1 row in yarn B, 4 rows in yarn C, I row in yarn B, 4 rows in yarn A. Repeat for length required. Fasten off yarn. © SPECIAL YARN KEY A shlny/malte tape yarn В multicolored aran yarn C paprika cotton tape 21
STITCH COLLECTION EQ Neapolitan Stripes Textured chevrons worked in a gorgeous palette of fuchsia pink and deep amethyst would make a pretty throw for a feminine bedroom. For a softer effect, substitute a range of pastel shades. Using yarn A, CO a multiple of 14 sts plus 3. ROW 1: (RS) K2, * YO, K5, K3log, K5, YO, KI; rep from * to last st, KI. ROW 2: K1, P to last st, K1. ROW 3: K. ROW 4: K. 0*0 Repeat for length required. BO. NOTE: At color changes, don't break main yarn, instead carry it loosely up side of work. EQ Pink Parfait Using yarn A, CO as left. Rep Rows 1-4, changing yarns in the following color sequence and ending with a Row 4: 6 rows in yarn A, 2 rows in yam B. 2 rows in yarn A, 4 rows in yam B. Repeat for length required. BO. NOTE: At color changes, don't break yarn, instead carry yarn not in use loosely up side of work. 22
STITCH COLLECTION 0 CH GOO EQI Pink Ripple Undulating waves of color are created by this simple-to-work combination of single and double crochet stitches. A novelty eyelash yarn adds a new dimension to the pattern; choose one which echoes the main yarn colors. FOUNDATION CHAIN: multiple of 17 chains plus 2. Using yarn A, make the required length of foundation chain. row i: (RS) 2 de into 3rd ch from hook, 2 de into each of next 2 chs, Isk next ch, 1 de into next ch| five times, * sk next ch, 2 de into each of next 6 chs, Isk next ch, 1 de into next ch| five times; rep from * to last 4 chs, sk next ch, 2 de into each of Iasi 3 chs, turn. row 2: Ch 1,1 sc into each de on previous row, 1 sc into 2nd of beg skipped ch-2, turn. row 3: Ch 3 (counts as 1 do, 2 de into each of next 3 sc, |sk next sc, 1 de into next sc| five times, * sk next sc, 2 de into each of next 6 sc, |sk next sc, 1 de into next sc| five times; rep from * to last 4 sc, sk next sc, 2 de into each of last 3 sc, turn. ROW 4: Ch 1, 1 sc into each de on previous row, 1 sc into 3rd of ch-3, Rep Rows 3 and 4. changing yarns in the following color sequence: 3 rows in yarn A, 2 rows in yarn B. 2 rows in yarn C, 2 rows in yarn D, 2 rows in yarn E, 2 rows in yam F. 2 rows in yam G. Repeat for length required. Fasten off yarn. EQ Clove Pinks Using yarn A, make the foundation chain and work Rows I and 2 as left. Rep Rows 3 and 4, changing yarns in the following color sequence: 3 rows in yarn A, 1 row in yam B, 2 rows in yam A, 3 rows in yarn C, 1 row in yam B. 2 rows in yam C. Repeal for length required. Fasten off yarn. © <© SPECIAL YARN KEY C variegated eyelash yarn 23
KEI Springtime A traditional lace stitch can look completely different when worked in stripes or in one solid color. Choose a light and dark tone of the same yarn color and vary the depth of the stripes for added interest. Using yarn A, CO a multiple of 12 sis plus 2. ROW 1: (RS) KI. * K2log, YO, K5, YO, КЗ, si 1, KI. psso; rep from * to last st, KI. ROW 2: and every even row: KI, P to last st, KI. ROW 3: KI, * K2tog, K5, YO, KI. YO, K2, si 1. KI, psso; rep from * to last st, K1. ROW 5: К1, * K2tog, K4, YO. КЗ. YO. KI. si 1, KI. psso; rep from * to last st. KI. ROW 7: KI, * K2log. КЗ, YO. K5. YO, si 1. KI. psso; rep from * to last st, KI. ROW 9: КI. * K’log, K2, YO. KI. YO. K5, si 1. KI. psso; rep from * to last st. KI. ROW it: KI. * K2tog, KI, YO, КЗ, YO. K4, si 1, KI, psso; rep from * Io last si. KI. ROW 12: KI. Pto last st. KI. Rep Rows 1-12, changing yarns in the following color sequence and ending with a Row 12: 4 rows in yam A, 2 rows in yarn B, 6 rows in yarn A, 4 rows in yarn B. 2 rows in yarn A, 6 rows in yam B. Repeat for length required. BO. NOTE: Al color changes, don't break yam, instead carry yarn not in use loosely up side of work. KJ Leafy Panels CO as above. Rep Rows 1-12 for length required, ending with a Row 12. BO. 24
STITCH COLLECTION А В *O FOUNDATION CHAIN: multiple of 11 chains plus 3. Special abbreviation cl = cluster (keeping last loop of each stitch on hook, work 3 de, YO and draw through all 4 loops on hook). Using yarn A, make the required length of foundation chain. row 1: (RS) 1 de into 3rd ch from hook, ch 1, sk next ch, 1 de into next ch, ch 1, sk next ch, 3 de into next ch, ch 3, 3 de into next ch, ch 1, sk next ch, 1 de into next ch, ch 1, * sk next ch, cl over next 3 chs, ch 1, sk next ch, 1 de into next ch, ch 1, sk next ch, 3 de into next ch, ch 3, 3 de into next ch, ch 1, sk next ch, 1 de into next ch, ch 1; rep from * to last 4 chs, [sk next ch, 1 de into next ch| twice, turn. ЕЯ Granny Lace This attractive variation of traditional granny square stitch groups plus sections of lace looks good worked in wide or narrow stripes. Choose a harmonious color scheme or go wild and pick a rainbow of hot, strong colors. row 2: Ch 3, sk first 2 de, |1 de into next de, ch 11 twice, sk next 2 de, |3 de, ch 3, 3 del into next ch-3 sp, ch 1, sk next 2 de, 1 de into next de, ch 1, * cl over next de, top of next cl and next de, ch 1,1 de into next de, ch 1, sk next 2 de, [3 de, ch 3, 3 de) into next ch-3 sp, ch 1, sk next 2 de, 1 de into next de, ch 1; rep from * to last 2 de, 1 de into each of last 2 de, turn. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 1 row in yarn B, 4 rows in yarn C, 1 row in yarn D. Repeat for length required. Fasten off yarn. Isil Greenwood Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C, 1 row in yarn A, 1 row in yarn B, 1 row in yarn C. Repeat for length required. Fasten off yarn. »oo 25
STITCH COLLECTION E3 Beaumont Texture Soft and attractively textured, this stitch pattern shows up well when worked in a solid color. The pattern of slightly curving ridges is accentuated when narrow bands of color are contrasted with deeper bands worked in a pale variegated yam CO a multiple of 10 sts plus 1. ROW 1: (RS) KI, ♦ K2tog. K2, YO. KI. YO, K2, K2tog tbl, KI; rep from * to end. ROWS 2. 4, and 6: KI. P to last St KI. ROW 3: KI. ♦ K2tog, KI. YO, КЗ, YO, KI, К’tog tbl, KI; rep from * to end. ROW 5: KI, * K2tog, YO, K5, YO, K2tog tbl, K1; rep from * to end. ROWS 7 and 9: K1, P to last St KI. ROWS: K. ROW >0: K. Rep Rows 1 -10 for length required, ending with a Row 10. 80. FE1 Sea Spray Using yam A, CO as left. Rep Rows 1 -10, changing yams in the following color sequence and ending with a Row 10: 7 raws in yam A, * 2 rows in yam B. 8 raws in yarn A. 2 rows in yarn C, 8 rows in yam A, 2 rows in yam D. 8 rows in yam A. Repeat from * for length required. BO. ООО 26
STITCH COLLECTION О О с О Е Q ® io«-a FOUNDATION CHAIN: multiple of 10 chains plus 2. Using yarn A, make the required length of foundation chain. row i: (WS) 1 sc into 2nd ch from hook, 1 de into rem ch, turn. ROW 2: Ch 1, sc3tog, * 1 sc into next sc, [ch 1, 1 sc into next sc) four times, sc5tog; rep from * to last 8 sc, 1 sc into next sc, (ch 1, 1 sc into next sc) four times, sc3tog, turn. ROW 3: Ch 1, 1 sc into each sc and ch along row, turn. ЕЯ Arctic Waters Color selection is important when making an afghan. Here, a rather busy ripple pattern appears calm and restful when worked in a selection of attractive blue and turquoise yarns. Rep Rows 2 and 3, changing yarns in the following color sequence: 5 rows in yarn A, * 2 rows in yarn B, 4 rows in yarn C, 2 rows in yarn D, 4 rows in yarn E, 2 rows in yarn F, 4 rows in yarn E, 2 rows in yarn A, 4 rows in yarn C, 2 rows in yarn G, 4 rows in yarn A. Repeat from * for length required. Fasten off yarn. Windermere Using yarn A, make the foundation chain and work Row 1 as left. Rep Rows 2 and 3, changing yarns in the following color sequence: 4 rows in yarn A, * 3 rows in yarn B, 5 rows in yarn A, 7 rows in yarn B, 2 rows in yarn C, 5 rows in yarn A. Repeat from * for length required. Fasten off yam. ООО 27
STITCH COLLECTION Bl ElTwisting Vines g . 4 This pattern has a lot of movement and contrasts sections of solid stitches with lace. The knitted fabric has a soft hand with lots of drape and would make a lovely, small-size, lap afghan. Using yarn A, CO a multiple of 9 sts plus 4. row i and every alt row: (WS) KI, P to last st, KI. ROW2: КЗ, *YO, K2, si 1, KI, psso, K2tog, K2, YO, K1; rep from * to last st. KI. ROW4: K2, *YO, K2, sl 1, KI, psso, K2tog, K2, YO, KI; rep from * to last 2 sts, K2. * 4 rows in yam A, 8 rows in yam B, 4 rows in yarn C, 8 rows in yarn B, * Repeat from * to * once, 4 rows in yarn A. Repeat for length required. BO. Rep Rows 1-4. changing yarns in the following color sequence and ending with a Row 4: GO * Ш Memphis Using yarn A, CO as left. Rep Rows 1-4, changing yarns in the following color sequence and ending with a Row 4: 2 rows in yarn A. 2 rows in yarn B. Repeat for length required. BO. note: At color changes, don't break yam, instead carry yarn not in use loosely up side of work. 28
STITCH COLLECTION ••«> • ЕЗ Golden Glow A wonderfully simple stitch to work, this pattern is perfect for using up all those odd balls of yarn in your stash. FOUNDATION CHAIN: multiple of 25 chains. Using yarn A, make the required length of foundation chain. row t: (RS) 1 de into 4th ch from hook, 1 de into each of next 9 chs, 4= 3 de into next ch, 1 de into each of next 11 chs, sk next 2 chs, 1 de into each of next 11 chs, rep from * to last 12 chs, 3 de into next ch, 1 de into each of next 11 chs, turn. ROW 2: SI st into 2nd de, ch 3 (counts as 1 de), 1 de into each of next 10 de, * 3 de into next de, 1 de into each of next 11 de, sk next 2 de, 1 de into each of next 11 de, rep from * to last 12 sts, 3 de into next de, 1 de into each of next 11 de, turn. Rep Row 2, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B, 2 rows in yam C, 2 rows in yarn D. Repeat for length required. Fasten off yarn. I SPECIAL YARN KEY | В multicolored effects yarn E3 Glitterglam Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn B, 4 rows in yarn C, 2 rows in yarn B. Repeat for length required. Fasten off yarn. © oeo SPECIAL YARN KEY В variegated metallic yarn E3 Big Ripple Using yarn A, make the foundation chain and work Row 1 as above. Rep Row 2, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B. Repeat for length required. Fasten off yarn. 29
STITCH COLLECTION EH Jolly Waves Although closely related to Beaumont Texture (page 26), this stitch has a much smoother surface and a more lacy appearance. Narrow stripes of strong colors look good against a plain background, or work the stitch in deeper six-row stripes 1 Using yam A. CO a multiple of 10 sts plus 1. ROW 1: (RS) KI, ♦ K2tog, K2, YO, KI, YO, K2, K2tog tbl, KI; rep from * to end. ROW 2: and every even row: KI, P to last st, KI. ROW 3: K1. * K2tog, KI, YO, КЗ. YO, KI. K2tog tbl. KI; rep from * ROW 5: KI, * K2tog, YO, K5, YO. K2tog tbl, K1; rep from * to end. ROW 6: KI, P to last st, K1. • " OS Rep Rows 1-6, changing yams in the following color sequence and ending with a Row 6: 12 rows in yarn A, 2 rows in yarn B. 2 rows in yarn C. 2 rows in yarn D. Repeat for length required. BO. NOTE At color changes, don’t break main yarn, instead carry it loosely up side of work. |chl Beaumont Lace Using yarn A, CO as above. Rep Rows 1 -6, changing yarns in the following color sequence and ending with a Row 6: 6 rows in yam A, 6 rows in yam B. 6 rows in yam C. Repeat for length required. BO. 30
STITCH COLLECTION ЕЁ1 Smartie Working into the back loops of single crochet stitches arranged in a chevron pattern produces a strongly ribbed texture. Work this stitch in strongly contrasting colors or choose a more restricted palette. FOUNDATION CHAIN: multiple of 11 chains plus 10. NOTE: After completing Row 1, work into the back loops only of all stitches, except for last stitch of each row. Using yarn A, make the required length of foundation chain. ROW 1: (WS) 1 sc into 2nd ch from hook, 1 sc into each of next 3 chs, * 3 sc into next ch, 1 sc into each of next 4 chs, sk next 2 chs, 1 sc into each of next 4 chs; rep from * to last 5 chs, 3 sc into next ch, 1 sc into each of next 4 chs, turn. ROW 2: Ch 1, sk first sc, * 1 sc into each of next 4 sc, 3 sc into next sc, 1 sc into each of next 4 sc, sk next 2 sc; rep from * to last 10 sc, 1 sc into each of next 4 sc, 3 sc into next sc, 1 sc into each of next 3 sc, sk next sc, 1 sc through both loops of last sc, turn. Rep Row 2, changing yarns in the following color sequence: 8 rows in yarn A, 8 rows in yarn B, 8 rows in yarn C, 8 rows in yarn D. Repeat for length required. Fasten off yarn. 1 • «» ЕД Morning Mist Using yarn A, make the foundation chain and work Row 1 as above. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 1 row in yarn B, 2 rows in yarn C, 4 rows in yarn A, 4 rows in yarn B. 6 rows in yarn A. Repeat for length required. Fasten off yarn. ©•> 31
Ripple patterns for pillow covers Ripple patterns make stylish pillow covers, whether they are worked in knit or crochet. Buy ready-made pillow forms to cover or give your existing ones a new lease of life by making a set of stylish covers in a new color scheme. Choose new yarns to make your covers or mix and match yarns from your stash for a unique result. Knit or crochet? Both techniques work well, although crochet is probably the better technique to use for making home furnishings. A piece of crochet grows fast and produces a denser, more hard-wearing fabric than knitting. Always make a gauge swatch first; this will let you check the hand of the fabric and the effect of your chosen colors as well as helping you make sure that the finished item will be the right size. Choosing the stitch pattern Choose a stitch pattern that is closely worked to minimize stretch and ensure durability in use. Avoid all-over lace stitch patterns or those with lacy areas as these can catch and snag on fingers and jewelry. Suggested stitches are shown on page 33. Combining colors and yarns There are several interesting ways of arranging colors on a pillow cover. The eight colors on the rectangular pillow are arranged in two-row stripes, shading from a creamy, natural white through to dark specked brown. On the square pillow, one color (yarn A) is the most predominant and is used to divide stripes worked in the other two colors. You Could also take a more random approach by using a wider range of colors and working varying depths of stripes. Buy a hard-wearing yarn made from pure wool or Cotton for making your pillow covers.
Pillow Covers Stitch pattern Pink Ripple, page 23 Hook: Size F (4mm) or size needed to achieve gauge. Foundation chain: Multiple of 17 chains plus 2. Gauge: 17 sts and 10 rows to 4in (1 Ocm) over pattern. Yarn requirements: Jamieson's Shetland Double Knitting (or Shetland double knitting weight yarn with 134 yds (122m) per 1'/<oz (50g) ball) in 10 coordinating colors—1 x 1%oz (50g) skein of each color will make a cover to fit a 1З'Лп x 1714in (35cm x 45cm) pillow form and a cover to fit a 12in square (30cm square) pillow form. Working the rectangular pillow cover Yarn colors:! 04 natural white (A), 350 lemon (B). 390 daffodil (С), 478 amber (D), 1200 nutmeg (E), 190 tundra (F), 880 coffee (G), 235 grouse (H). Using yarn A, make the required length of foundation chain to work 4 pattern repeats. Follow the stitch pattern on page 23, changing yarns in the following color sequence: 2 rows of yarn A, 2 rows of yarn B, 2 rows of yarn C, 2 rows of yarn D, 2 rows of yarn E, 2 rows of yarn F, 2 rows of yarn G, 2 rows of yarn H. Repeat sequence until you have made a strip of crochet long enough to fit loosely round the pillow form. Fasten off yarn. Working the square pillow cover Yarn colors: 375 flax (A), 425 mustard (B), 190 tundra (С). Using yarn A, make the required length of foundation chain to work 3 pattern repeats. Follow the stitch pattern on page 23, changing yarns in the following color sequence: 4 rows of yarn A, 4 rows of yarn B, 4 rows of yarn A, 4 rows of yarn C. Repeat sequence until you have made a strip of crochet long enough to fit loosely round the pillow form. Fasten off yam Making up the pillow covers Sew in all the ends. Lightly press each cover on the wrong side and allow to cool. Fold each strip with right sides together so the foundation chain and last row meet at the center. Pin along top and bottom edges, then stitch together using one of the yarn colors. Turn to the right side, insert the pillow form and stitch the foundation chain and last row together. ALTERNATIVE PATTERNS TO USE 5 Shaded Chevrons (knit) A classic stockinette stitch chevron pattern gives lots of scope for choosing interesting and unusual color combinations. 24 Arctic Waters (crochet) This pattern creates a substantial crochet fabric and makes a good choice for making pillow covers. 51 Spanish Steps (crochet) MM Zigzag rows of clusters make a thick. «Ир durable fabric that looks best worked in smooth yarns. 74 Fall Chevrons (knit) Work this easy-to-knit garter stitch pattern in a range Of subtly toning colors or choose from a brighter palette to add impact. 33
STITCH COLLECTION ES ЕЯ Puff Lace 10 ,, Bands of reverse stockinette stitch form attractive swags that stand out from the surface to give a strongly textured appearance. Changing the position of the contrasting bands of color gives a different effect. Using yarn A. CO a multiple of 10 sts plus 1. ROWS I. 3, 5, 7, and 9: (RS) K2tOg. * КЗ. YO, KI. YO. КЗ. si 1. K2tog, psso; rep from * to last 9 sts, КЗ. YO. KI, YO, КЗ, K2tog. ROWS 2, 4, 6. B, and 10: KI, P to last st. KI. ROWS 11 and 13: KI. P to last St, KI. ROW 12: K. ROW 14: K. Rep Rows 1-14, changing yams in the following color sequence and ending with a Row 14: 11 rows in yam A, * 2 rows in yam 8 12 rows in yarn A. 2 rows in yam C, 12 rows in yarn A. Repeat from * for length required. BO. NOTE: At color changes, don't break main yarn, instead carry it loosely up side of work. Bc{sf Coral Fantasy : Using yarn A. CO as left. : Rep Rows 1-14, changing yarns in : the following color sequence and ; ending with a Row 14: 3 rows in yam A. 4 rows in yam В 7 rows in yarn A. : Repeat for length required. ? BO. ; NOTE: At color changes, don't break • main yam, instead carry it loosely up : side of work. 34
STITCH COLLECTION «•о ЕЯ Blossom This easy-to-work crochet stitch looks good worked in narrow bands of strongly contrasting shades of coral and deep burgundy. For a different, more lacy effect, use one color of yarn throughout. FOUNDATION CHAIN: multiple of 7 chains plus 4. Using yarn A, make the required length of foundation chain. row 1: (RS) 1 de into 4th ch from hook, * sk next 2 chs, [3 de, ch 1, 3 dc| into next ch, sk next 2 chs, 2 de into each of next 2 eh; rep from * to end, turn. ROW 2: Ch 3, sk first de, 1 de into next de, * sk next 2 de, 1 de into next de, ch 1, |1 de, ch 1, 1 del into next ch-1 sp, ch 1, 1 de into next de, sk next 2 de, 1 de into each of next 2 de; rep from * to end working last de into 3rd of beg skipped ch-3, turn. ROW 3: Ch 3, sk first de, 1 de into next de, * sk next ch-1 sp, [2 de, ch 3, 2 del into next ch-1 sp, sk next 2 de, 1 de into each of next 2 de; rep from * to end working last de into 3rd of ch-3, turn. row 4: Ch 3, sk first de, 1 de into next de, * [3 de, ch 1, 3 del into next ch-3 sp, sk next 2 de, 1 de into each of next 2 de; rep from * to end working last de into 3rd of ch-3, turn. row 5: Ch 3, sk first de, 1 de into next de, * sk next 2 de, 1 de into next de, ch I, |1 de, ch 1, 1 del into next ch-1 sp, ch 1, I de into next de, sk next 2 de, 1 de into each of next 2 de; rep from * to end working last de into 3rd of ch-3, Rep Rows 3-5, changing yarns in the following color sequence: 1 row in yarn A, 2 rows in yarn B, 1 row in yarn A, 2 rows in yarn C. Repeat for length required. Fasten off yarn. El Speckled Coral Make the foundation chain and work Rows 1 and 2 as left. Rep Rows 3-5 for length required. Fasten off yarn. 35
ЕН Switchback @@ к, + । This stitch produces a strongly patterned fabric with a fairly smooth surface. Accentuate the crisp chevrons by choosing a neutral color palette spiced up with bright turquoise. Omit the bright color for a more restful look. Special abbreviation inc = increase in next stitch. On RS rows, knit into the front and back of the next stitch. On VV5 rows, purl into the front and back of the next stitch. Using yarn A, CO a multiple of 16 sts plus 1. ROW 1: (RS) KI, * inc, K5, si 1 knitwise, K2tog, psso. K5, inc, K1; rep from * to end. ROW 2: PI, * inc, P5, sl 1 purlwise, P2tog, psso, P5, inc, PI; rep from * to end. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 2 rows in yam A. 2 rows in yam В 2 rows in yarn A. 2 rows in yarn C. 2 rows in yarn D. 2 rows in yarn C. Repeat for length required. BO. note-. When possible, don't break yam at color changes, instead carry yarn not in use loosely up the side of the work. O« ESI Gray Skies Using yarn A. CO as left. Rep Rows 1 and 2. changing yarns in the following color sequence and ending with a Row 2: 6 rows in yam A, 2 rows in yam B. Repeat for length required. BO. NOTE: Al color changes, don’t break yarn, instead carry yam not in use loosely up side of work.
STITCH COLLECTION ©ОСО E3 Northern Nostalgia ЕП Granite City Formed from groups of double crochet stitches, this pattern is very easy to work and perfect for a newcomer to crochet. To add interest, incorporate stripes worked in either a two-toned marl yarn or a lovely fluffy mohair yarn. Using yarn A. make the foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C, 2 rows in yarn B. Repeat for length required. Fasten off yarn. © FOUNDATION CHAIN: multiple of 10 chains plus 3. Using yarn A, make the required length of foundation chain. row 1: (RS) 1 de into 4th ch from hook, 1 de into each of next 4 chs, * sk next 2 chs, 1 de into each of next 4 chs, ch 2, 1 de into each of next 4 chs; rep from * to last 6 chs, sk next 2 chs, 1 de into each of next 3 chs, 2 de into last ch, turn. ROW 2: Ch 3, 1 de into first de, 1 de into each of next 3 de, * sk next 2 de, 1dc into each of next 3 de, |1 de, ch 2,1 de] into next ch-2 sp, 1 de into each of next 3 de; rep from * to last 6 de, sk next 2 de, 1 de into each of next 3 de, 2 de into 3rd of beg skipped ch-3, turn. row 3: Ch 3, 1 de into first de, 1 de into each of next 3 de, * sk next 2 de, 1 de into each of next 3 de, [1 de, eh 2, 1 de] into next ch-2 sp, 1 de into each of next 3 de; rep from * to last 6 de, sk next 2 de, 1 de into each of next 3 de, 2 de into 3rd of ch-3, turn. Rep Row 3, changing yarns in the following color sequence: 1 row in yarn A, 1 row in yarn B, 1 row in yarn C, 1 row in yarn D. Repeat for length required. Fasten off yarn. EM Mini Chevrons Using yarn A, make the foundation chain and work Rows 1 and 2 as above. Rep Row 3, changing yarns in the following color sequence: 2 rows in yarn A, 1 row in yarn B. Repeat for length required. Fasten off yarn. 37
ЕЕ1 Baby Chevrons Pretty pastel shades are always popular for making gift afghans to celebrate the arrival of a new baby. This stitch looks equally effective worked in one color or in stripes, perhaps with the addition of a novelty yarn. Using yarn A, CO a multiple of 13 sts plus 1. ROW 1: (RS) * KI, YO, K4, K2tog, si 1, KI, psso, K4, VO; rep from * to last st, KI. row2: KI, P to last st, KI. Rep Rows I and 2, changing yarns in the following color sequence and ending with a Row 2: 8 rows in yarn A, 2 rows in yarn B, 2 rows in yarn A, 8 rows in yam C, 2 rows in yarn B, 2 rows in yarn C, 2 rows in yarn B. 8 rows in yarn C, 2 rows in yarn A, 2 rows in yarn B. 8 rows in yarn A. Repeat for length required. BO. E3 Powder Puff Using yarn A. CO as left. Rep Rows I and 2, changing yarns in the following color sequence and ending with a Row 2: 8 rows in yarn A, 4 rows in yarn B. Repeat for length required. BO. NOTE: At color changes, don't break main yarn, instead carry it loosely up side of work. ЕЭ Baby Blue CO as left. Rep Rows 1 and 2 for length required, ending with a Row 2. BO. NOTE: When possible, don't break the yarn at color changes, instead carry yarn not in use loosely up the side of the work. 38
А В C D FOUNDATION CHAIN: multiple of 14 chains plus 4. Using yam A, make the required length of foundation chain. Row t: (RSI 3 de into 4th ch from hook. ♦ sk next 3 chs. 1 sc into each of next 7 chs, sk next 3 chs. 7 de into next ch; rep from * ending last rep with 4 de into last ch, turn. ROW 2: Ch 1. I sc into first st I sc into each st along row, ending with 1 sc into 3rd of beg skipped ch-3, turn. row 3: Ch 1, 1 sc into each of first 4 sts, sk next 3 sts, 7 de into next st. sk next 3 sts, I sc into each of next 7 sts; rep from ♦ to last 11 sts. sk next 3 sts, 7 de into next st. sk next 3 sts, 1 sc into each of last 4 sis, sk turning ch-1, turn. ЕЗ Grotto Rows of simple crochet shells create a delicate ripple pattern that is enhanced by the careful choice of color. Use this stitch for making a baby afghan, choosing either one color plus white or a section of pastel shades of plain and variegated baby yams. © Ea Pink and White row 4: Ch 1. 1 sc into first st, 1 sc into each st along row. sk turning ch-1, turn. row 5: Ch 3. 3 de into first st. * sk next 3 sts, 1 sc into each of next 7 sts, sk next 3 sts. 7 de into next st; rep from * ending last rep with 4 de into last st, sk turning ch-1, tum. ROW 6: Ch 1, 1 sc into first st, 1 sc into each st along row. ending with 1 sc into 3rd of ch-3, tum. Using yarn A, make the foundation chain and work Rows I and 2 as left. Rep Rows 3-6, changing yarns in the following color sequence: 2 rows in yam A. 4 rows in yam B, 2 rows in yam A. Repeat for length required. Fasten off yam. Rep Rows 3-6. changing yams in the following color sequence: 6 rows in yam A, 2 rows in yam В 6 rows in yam C. 2 rows in yam D. Repeat for length required. Fasten off yarn. 39
STITCH COLLECTION ЕЁ1 Mandarin This pretty stitch uses ridges of texture and lace to form an attractive raised wave pattern. Work it in one color of yarn throughout or choose two contrasting warm colors of smooth wool plus a light color of mohair yarn. Special abbreviation inc = increase by knitting into front and back of next stitch. CO a multiple of 11 sts plus 1. ROW 1: IRS) KI, * K2tog, K2, inc, KI. inc, K2, K2tog tbl; rep from * to end. ROW 2, 4, and 6: К1, P to last St, КI ROWS 3 and 5: Rep Row 1. ROWS 7 and 8: Rep Row 2. ROW 9: K. ROW to: KI. * YO. P2tog; rep from * to last st, Ki. row it: K1, * KI tbl, KI; rep from * to last st, KI. ROWS 12 and 13: Rep Row 2. ROW 14: K1, P to last st, KI. Rep Rows 1-14 for length required, ending with a Row 14. BO. NOTE: When number cast-on is an odd number, omit last K1 on Row 10 and first K1 on Row 11. •®o Fil Marmalade Using yarn A, CO as left. Rep Rows 1 -14, changing yarns in the following color sequence and ending with a Row 14: 6 rows in yarn A, 2 rows in yarn B, 1 row in yarn A, 5 rows in yarn C. Repeat for length required. BO. NOTE: Don't break main yarn at color changes, instead carry the yam loosely up the side of the work. 40
STITCH COLLECTION ©•► Bl Spanish Steps An attractively textured stitch that produces a very thick fabric without much drape, this stitch makes a good choice when making a small item such as a pram or stroller blanket or a pillow cover. FOUNDATION CHAIN: multiple of 8 chains plus 1. Special abbreviations cl = cluster (YO, draw up a loop in chain or stitch indicated, YO, draw up a loop in the same place, YO and draw through all 5 loops on hook), cis = clusters. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 sc into 2nd ch from hook, 1 sc into each of next 3 chs, cl into each of next 4 chs, * 1 sc into each of next 4 chs, cl into each of next 4 chs; rep from * to end, turn. row 2: Ch 1, * 1 sc into each of next 4 cis, cl into each of next 4 sc; rep from * to end, turn. Rep Row 2, changing yarns in the following color sequence: 3 rows in yarn A, 1 row in yarn B, 2 rows in yarn C. Repeat for length required. Fasten off yarn. Alhambra Using yarn A, make the foundation chain and work Rows 1 and 2 as above. Rep Row 2, changing yarns in the following color sequence: 6 rows in yarn A, 2 rows in yarn B, 6 rows in yarn A, 2 rows in yarn C. Repeat for length required. Fasten off yarn. 41
STITCH COLLECTION 1O+ 1 57 Soft Chevrons This beautiful stitch creates a pattern of softly curving ripples that looks good worked in strongly contrasting stripe colors. Equally effective is the introduction of narrow stripes of a soft, velvety tape yarn to contrast with a plain, smooth background. Using yarn A. CO a multiple of 10 sts plus 1. ROW 1: (RS) K2tog, * КЗ, YO, KI, YO, КЗ, si I, K2tog, psso; rep from * to last 9 sts, КЗ, YO, K1, YO, КЗ, K2tog. ROW 2: K1, P to last st. KI. Repeat for length required. BO. NOTE: At color changes, don't break main yarn, instead carry it loosely up side of work. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 10 rows in yarn A. 2 rows in yarn B. SPECIAL YARN KEY В multicolored velvet yarn 58 Imperial Band Using yarn A. CO as left. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 20 rows in yarn A. 2 rows in yarn B, 14 rows in yarn C, 2 rows in yarn B. • Repeal for length required. BO. 44
STITCH COLLECTION IQ ЕЁ1 Lavender Fields This unusual stitch makes a pattern of uneven chevron stripes. Worked in double crochet stitches, it's straightforward to work, but you should count the stitches carefully up and down each side of the peaks and troughs. pn French Lavender Using yarn A, make lhe foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C, 2 rows in yarn B. Repeat for length required. Fasten off yarn. FOUNDATION CHAIN: multiple of 32 chains plus 4. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de into 4th ch from hook, * 1 de into each of next 9 chs, sk next ch, 1 de into each of next 5 chs, 3 sc into next ch, 1 de into each of next 5 chs, sk next ch, I de into each of next 9 chs, 3 de into next ch; rep from * to end, ending last rep with 2 de into last ch, turn. row 2: Ch 3, 1 de into first de, * I de into each of next 9 sc, sk next 2 de, 1 de into each of next 5 de, 3 de into next de, 1 de into each of next 5 de, sk next 2 de, 1 de into each of next 9 de, 3 de into next de; rep from * to end, ending last rep with 2 de into 3rd of beg skipped ch-3, turn. row 3: Ch 3, 1 de into first de, * 1 de into each of next 9 sc, sk next 2 de, 1 de into each of next 5 de, 3 de into next de, 1 de into each of next 5 de, sk next 2 de, 1 de into each of next 9 de. 3 de into next de; rep from * to end, ending last rep with 2 de into 3rd of ch-3, turn. Rep Row 3, changing yarns in the following color sequence: I row in yarn A, 1 row in yam B, 3 rows in yarn C, 1 row in yarn B. Repeat for length required. Fasten off yarn. 45
STITCH COLLECTION 16 «2 Bl Allsorts This classic lace stitch has a strikingly different pattern when worked in bold stripes of mid-gray, dark gray, and pale cream. The stitch also looks good when worked in one solid color of yam. Using yam A. CO a multiple oi 16 sis plus 2. ROW 1: (RS) K. ROW 2: KI, * K4, P8, K4; rep from ♦ to Iasi si. KI. ROW 3: KI. * P3. K2tog, КЗ. YO. КЗ. si 1. KI, psso, P3; rep from ♦ to last si. KI. ROW 4: KI. ♦ КЗ, P4, P into front and back of YO made on previous row, P4, КЗ; rep from * lo last st, KI. ROW S: KI. * P2, K2tog. КЗ. YO. K2, YO, КЗ, si 1, KI, psso. P2: rep from * to last st. KI. row 6: KI. ♦ K2, Pl2. K2; rep from ♦ lo Iasi st. KI. ROW7: KI. ♦ PI. K2iog, КЗ. YO. K4. YO. КЗ, si 1, KI. psso. PI; rep from ♦ to last st, KI. ROW 8: KI. * KI. P14, KI; rep from ♦ lo last st. KI. ROW 9: КI. ♦ K2tog, КЗ, YO. K6. YO. КЗ, si I. KI. psso; rep from ♦ to last st. KI. ROW to: KI. P to last st. KI Rep Rows 1—10, changing yams in the following color sequence and ending with a Row 10: 10 rows in yarn A, 2 rows in yarn B. 6 rows in yarn C, 2 rows in yam B. Repeal for length required. BO. ГЧ1 Silver Lace i CO as left. : Rep Rows 1-10 for length required, \ ending with a Row 10. : BO. 000 46
STITCH COLLECTION El Storm Clouds Inspired by the groups of double crochet stitches that make up a traditional granny square, this stitch has a strongly patterned surface when worked in stripes of graduating color. For a different effect, incorporate two-row stripes of matching eyelash yarn. я © FOUNDATION CHAIN: multiple of 17 chains plus 3. Special abbreviations cl = cluster (keeping last loop of each de on hook, work 3 de into next stitch or space, YO and draw through all 4 loops on hook), cis = clusters. Using yarn A, make lhe required length of foundation chain. ROW 1: (RS) 1 sc into 2nd ch from hook, 1 sc into each ch, turn. ROW 2: Ch 3, sk first 3 sc, |3 de into next sc, sk next 2 sc] twice, [3 de, ch 3, 3 dc| into next sc, * sk next 2 sc, 3 de into next sc, sk next 2 sc, cl into next sc, sk next 4 sc, cl into next sc, |sk next 2 sc, 3 de into next sc] once, sk next 2 sc, |3 de, ch 3, 3 del into next sc; rep from * to last 8 sc, sk next 2 sc, |3 de into next sc, sk next 2 sc| twice, 1 de into last sc, turn. row 3: Ch 3, sk sp between turning ch and next 3-dc group, 3 de into each of next 3 sps, 13 de, ch 3, 3 del into next ch-3 sp, * 3 de into next sp, cl into next sp, sk sp between els, cl into next sp, 3 de into next sp, |3 de, ch 3, 3 dc| into next ch-3 sp; rep from * to last 3 sps, 3 de into each of next 2 sps, 1 de into sp between last 3-dc group and turning ch, turn. Rep Row 3, changing yarns in lhe following color sequence: 2 rows in yarn A, 2 rows in yam B, 2 rows in yarn C. Repeat for length required. Fasten off yam. LU Softly Gray Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn B. Repeat for length required. Fasten off yarn. SPECIAL YARN KEY В two-tone eyelash yarn
STITCH COLLECTION 1O + 1 65 Sandstone Softly textured swags of raised stitches decorate this pretty ripple pattern. The stitch looks good worked in one yarn throughout or striped in a selection of warm, earthy yam colors. CO a multiple of 10 sis plus 1. ROW 1: (RS) K2tog, * КЗ, YO, KI, YO, КЗ, si I, K2log, psso; rep from * to last 9 sts, КЗ, YO, KI, YO, КЗ, K2tog. ROW 2: KI, P to last St, KI. ROWS 3-10: Rep Rows 1 and 2 four times more. ROWS 11 and 12: KI, P to last St, KI. ROW 13: K. ROW 14: K. Rep Rows 1-14 for length required, ending with a Row 14. BO. 66 Festoons Using yarn A, CO as left. Rep Rows 1-14, changing yarns in the following color sequence and ending with a Row 14: 4 rows in yarn A. 4 rows in yarn B. Repeat for length required. BO. NOTE: At color changes, don’t break yarn, instead carry yarn not in use loosely up side of work. 4Я
STITCH COLLECTION Hl Chocolate Delight This very simple chevron pattern worked in single crochet stitches has three very different effects when the stripes are varied from very narrow to very deep. Choose from a selection of natural colors ranging from cream and rust to cocoa brown. Isfsj Subtle Ripples Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2. changing yarns in the following color sequence: 6 rows in yarn A, * 1 row in yarn В 7 rows in yarn A. Repeal from * for length required. Fasten off yarn. В © FOUNDATION CHAIN: multiple of 16 chains plus 2. Using yarn A, make the required length of foundation chain. ROW i: (RS) 2 sc into 2nd ch from hook, * 1 sc into each of next 7 chs, sk next ch, 1 sc into each of next 7 chs, 3 sc into next ch; rep from * to end, ending last rep with 2 sc into last ch, turn. ROW 2: Ch 1, 2 sc into first sc, * 1 sc into each of next 7 sc, sk next 2 sc, 1 sc into each of next 7 sc, 3 sc into next sc; rep from * to end, ending fast rep with 2 sc into last sc, turn. Rep Row 2, changing yarns in lhe following color sequence: 4 rows in yarn A, 2 rows in yarn B, 2 rows in yam C. Repeat for length required. Fasten off yarn. ЕЯ Navajo Using yarn A, make the foundation chain and work Row 1 as above. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn B, 8 rows in yarn C, 2 rows in yam B, 4 rows in yarn A. Repeat for length required. Fasten off yarn. 49

Ripple patterns for scarves Ripple stitch patterns make fantastic scarves. You can work stitches across the width of a scarf in the same way as the Mohair Wrap on pages 68-69 or be more adventurous and work the pattern in long stripes running along a scarf from end to end. This creates a scarf with two long wavy edges, and there's no need to darn in the yarn ends as they are cleverly incorporated into the fringe at each end. Raid your stash and mix and match thin, thick, textured, and novelty yarns to make this wonderful zigzag scarf. Knit or crochet? Crochet is probably the better technique to use when making an end-to-end scarf as there is no limit to the number of repeats you can work. To knit this type of scarf, you'll need to work back and forth on a long circular needle as single-point needles will be too short to accommodate the large number of stitches required. Choosing the stitch pattern You can use many of the stitch patterns in the book to make an end-to-end scarf, although it’s best to choose one with a fairly small repeat as this will create neatly waving edges. Suggested stitches are shown on page 51. Combining colors and yarns Choose yams from the same color palette or mix and match colors randomly. Almost any weight of yam is suitable for making this type of scarf, and it's the perfect way of using up lots of odds and ends of yarns from your slash. Use fine yarns, working with two, three, or more strands together to give the right thickness, or combine a fine, textured yarn with a smooth one from the same color palette to make your own individual yarn.
Zigzag Scarf Stitch pattern Provence, page 119 Hook: Size I (6mm) or size needed to achieve a suitable fabric. Foundation chain: Multiple of 11 chains plus 2. Gauge: Variable, depending on lhe yams selected, but try to make a fairly soft fabric with good drape so the scarf will sit nicely round your neck. Size and colors: The scarf in the photograph was worked in a selection of yarns based around a color palette of mauve, purple and blue. The scarf measures 8'Zin x 71 in (22cm x 180cm) including fringes. Yarn requirements: Selection of different yarns including double knitting weight (used double), Aran weight, mohair, tape, effect, eyelash, and textured yarns. Combine lhe finer yarns to make a thicker weight that matches that of two strands of double knitting yarn. You'll need about 20 yds (18.3m) of each strand of yarn to work one row of pattern, including ends for fringing. Working the zigzag scarf Make the required length of foundation chain to work 20 pattern repeats. RIPPLE PATTERNS FOR SCARVES Follow lhe stitch pattern on page 119, working each row in a different yarn, leaving yarn ends of at least 8in (20cm) at each end of the row. Continue until the scarf is the desired width. Finishing the zigzag scarf Lightly press the scarf on lhe wrong side. Group the yarn ends into bundles and tie an overhand knot at the lop of each bundle to form a fringe. Using yarns from your stash The scarf was worked from stash yarns, mixing different weights and textures of yarn. Thick yarns were used in single strands; medium- weight yams were used in double strands and several fine ones were combined to make up a similar weight. Try to change yarn colors and textures every row to make a really unusual fabric and don't forget to leave yarn ends of at least 8in (20cm) long al each end of the rows. 21 Greenwood (crochet) SBBg Quick and easy to crochet, work this pattern in lightweight yarns to make a soft scarf with good drape. 63 Storm Clouds (crochet) к Worked in a selection of pure wool S yarns, use this pattern to crochet a ~ substantial scarf to wear in winter. 87 Granada (knit) ww» This pattern would look equally effective worked in vertical or '*'•*** horizontal stripes using toning or contrasting yarns. 109 Bird of Paradise (knit) Choose a smooth yarn lor your background color and work the stripes in a variety of textured eyelash, novelty, and mohair yarns.
STITCH COLLECTION 11 70 Lavender Lace Producing a soft fabric with plenty of drape, this pretty stitch features bands of openwork lace that contrast well against solid areas of knitting. Choose soft, restful colors to enhance the stitch pattern. Special abbreviation ssk = slip, slip, knit (slip next two stitches one at a time, insert left needle into fronts of slipped stitches and knit them together). Using yarn A. CO a multiple of I I sts. ROW i: (RS) * Ssk, КЗ tbl, YO, KI, YO, КЗ tbl, K2tog; rep from * to end. ROWS 2, 4, 6, and 8: KI, P to last St, KI. ROW 3: * Ssk, K2 tbl, YO, KI, YO, ssk, YO, K2 tbl, K2tog; rep from * to end. ROW 5: * Ssk, KI tbl, YO, KI, |YO, ssk| twice, YO, KI tbl, K2tog; rep from * to end. row 7: * Ssk, YO, KI, |YO, ssk] three times, YO, K2tog; rep from ❖ to end. ROW 9: * KI, PI, K7, PI, KI; rep from * to end. ROW io. * PI, KI, P7, KI, PI; rep from * Io end. Rep Rows 1-10, changing yarns in the following color sequence and ending with a Row 10: 4 rows in yarn A, 2 rows in yarn B. 4 rows in yarn A. 4 rows in yarn C, 2 rows in yarn D, 4 rows in yarn C. Repeat for length required. BO. NOTES: Slip all stitches knilwise. When possible, don't break yarn at color changes, instead carry yarn not in use loosely up side of work. O> Dusky Stripes Using yarn A, CO as left. Rep Rows 1-10, changing yarns in the following color sequence and ending with a Row 10: 8 rows in yarn A, 2 rows in yarn B. Repeat for length required. BO. NOTE: Al color changes, don't break main yarn, instead carry it loosely up side of work. 52
STITCH COLLECTION E£1 Scandinavian Stripes Easy to work and delightfully lacy when worked in one color, the appearance of this crochet stitch can be easily changed by incorporating stripes of mauves and pale turquoise worked in varying depths. ©• " foundation chain: multiple of 20 chains plus 4. Special abbreviations cl = cluster (keeping last loop of each de on hook, work I de into next de, sk next st, I de into next de, YO and draw through all 3 loops on hook), dec = decrease (keeping last loop of each de on hook, work 1 de into next ch, sk next 3 chs, / de into next ch, YO and draw through all 3 loops on hook). Using yarn A, make the required length of foundation chain. row 1: (WS) 1 de into 6th ch from hook, [ch 1, sk next ch 1 de into next ch] three times, ch 1, sk next ch, |1 de, ch 3, 1 del into next ch, * [ch 1, sk next ch 1 de into next ch] three times, ch 1, sk next ch, dec, [ch 1, sk next ch 1 de into next ch] three times, ch 1, sk next ch, [1 de, ch 3, 1 de] into next ch; rep from * to last 10 chs, [ch 1, sk next ch 1 de into next ch] five times, turn. row 2: Ch 3, sk next ch-1 sp, 1 de into next de, [1 de into next ch-1 sp and into next de] four times, ]2 de, ch 3, 2 de] into next ch-3 sp, [1 de into next de and into next ch-1 sp] three times, cl, ]1 de into next ch-1 sp and into next de] three times, [2 de, ch 3, 2 de] into next ch-3 sp, [1 de into next de and into next ch-1 sp] three times; rep from * to last 2 de, 1 de into next de, into next ch-1 sp and into last de, 1 de into 4th of beg skipped ch-5, turn. ROW 3: Ch 3, sk first 2 de, 1 de into next de, ch 1, [sk next de, 1 de into next de, ch 1 ] four times, [1 de, ch 3, 1 de] into next ch-3 sp, * ch 1, sk next de, |1 de into next de, ch 1, sk next de] three times, cl, ch 1, sk next de, [1 de into next de, ch 1, sk next de] three times, [1 de, ch 3, 1 de] into next ch-3 sp; rep from * to last 11 de, [ch 1, sk next de, 1 de into next de] five times, sk last de, 1 de into 3rd of ch-3, turn. row 4: Ch 3, sk first 2 de and next ch-1 sp, 1 de into next de, [1 de into next ch-1 sp and into next de] four times, [2 de, ch 3, 2 de] into next ch-3 sp, [1 de into next de and into next ch-1 sp] three times, cl, [1 de into next ch-1 sp and into next de] three times, [2 de, ch 3, 2 de] into next ch-3 sp; rep from * to last 6 de, [1 de into next ch-1 sp and into next de] four times, 1 de into next de, sk next ch-1 sp and last de, 1 de into 3rd of ch-3, turn. В © Rep Rows 3 and 4, changing yarns in the following color sequence: 3 rows in yarn A, 1 row in yarn B, 3 rows in yarn С, 1 row in yarn D, 3 rows in yarn C, 1 row in yarn B. Repeat for length required. Fasten off yarn. Oslo Dusk Make the foundation chain and work Rows 1 and 2 as left. Rep Rows 3 and 4 for length required. Fasten off yam. 53
о О E3 Cornrows Bl Fall Chevrons This is a simple-to-work garter stitch ripple pattern that produces a thick, warm fabric. Add interest by adding narrow stripes worked in a novelty yarn or stripe it in close tones of the same color. Using yarn A. CO as left. Rep Rows 1 and 2. changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn В 4 rows in yarn A, 2 rows in yarn C, 4 rows in yarn A, 2 rows in yarn В 4 rows in yarn A, 2 rows in yarn D. Repeat for length required. BO. NOTE Don't break main yam at color changes, instead carry the yarn loosely up the side of the work. Using yam A, CO a multiple of 14 sts plus 3. Row i: (RS) K1, sl 1, KI, psso, * K5, YO, K1, YO, K5, sl 2, KI. p2sso; rep from * to last 14 sts, K5, YO. KI. YO. K5, K2tog, KI. ROW2: K7, *K1 tbl, KI. KI tbl, KI 1; rep from * to last 10 sts, KI tbl, KI. KI tbl, K7. Rep Rows 1 and 2, changing yarns in lhe following color sequence and ending with a Row 2: 4 rows in yam A, 4 rows in yarn B, 8 rows in yarn C. 4 rows in yarn B. Repeat for length required. BO. NOTE: Where possible, don't break yarn at color changes, instead carry yam not in use loosely up the side of lhe work. E3 Novelty Chevrons Using yarn A. CO as above. Rep Rows 1 and 2. ending with a Row 2 and changing yarns in the following color sequence: 14 rows in yarn A, 2 rows in yam B, 2 rows in yam C, 2 rows in yarn B. Repeat for length required. SPECIAL YARN KEY A honey aran yam В caramel aran yarn
STITCH COLLECTION БЗ Fall Hedgerows Quick to work in half double crochet stitches, this pretty waved pattern looks good worked in warm, earthy colors. Add a subtle hint of glamour by incorporating a metallic yarn of the same weight as the main yarn. FOUNDATION CHAIN: multiple of 14 chains. Using yarn A, make the required length of foundation chain. row 1: (RS) 1 hdc into 3rd ch from hook, 1 hdc into each of next 4 chs, * 3 hdc into next ch, 1 hdc into each of next 5 chs, sk next ch, 1 hdc into next ch, sk next ch, 1 hdc into each of next 5 chs; rep from * to last 7 chs, 3 hdc into next ch, 1 hdc into each of last 6 chs, turn. row 2: Ch 2, sk 1st hdc, 1 hdc into each of next 5 hdc, ❖ 3 hdc into next hdc, 1 hdc into each of next 5 hdc, sk next hdc, 1 hdc into next hdc, sk next hdc, 1 hdc into each of next 5 hdc; rep from * to last 7 hdc, 3 hdc into next hdc, 1 hdc into each of next 5 hdc, sk next hdc, 1 hdc into 2nd of beg skipped ch-2, turn. ROW 3: Ch 2, sk first 2 hdc, 1 hdc into each of next 5 hdc, * 3 hdc into next hdc, 1 hdc into each of next 5 hdc, sk next hdc, 1 hdc into next hdc, sk next hdc, 1 hdc into each of next 5 hdc; rep from * to last 7 hdc, 3 hdc into next hdc, 1 hdc into each of next 5 hdc, sk next hdc, 1 hdc into 2nd of ch-2, turn. Rep Row 3, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C, 6 rows in yarn D. Repeat for length required. Fasten off yarn. E3 Mink Sparkle Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yarns in the following color sequence: 8 rows in yarn A, 2 rows in yarn B, 2 rows in yarn A, 2 rows in yarn B. Repeat for length required. Fasten off yarn. SPECIAL YARN KEY В variegated metallic yarn oo 55
STITCH COLLECTION ia+1 Bl Crest of the Wave A lace stitch traditionally used on the lovely lightweight shawls knitted in the Shetland Isles, this pattern looks equally good worked in one color of yarn or in narrow light and dark toned stripes. CO a multiple of 12 sts plus I. ROWS 1, 2, 3, and 4: (RS) K. ROW5: KI, * |K2tog| twice, |YO, K1| three times, YO, [si 1, K1, pssol twice, KI: rep from * to end. ROW 6: K1, Pto last st, KI. ROWS 7,9, and 11: Rep ROW 5. ROWS 8 and 10: Rep Row 6. ROW 12: K1. P Ю last St, K1. Rep Rows I-12 for length required, ending with a Row 12. BO. ED Oxbridge Stripes i Using yarn A, CO as left. • Rep Rows 1-12, changing yarns in i the following color sequence and : ending with a Row 12: i 4 rows in yarn A, 2 rows in yarn B, 2 rows in yam A, 2 rows in yarn B, ; 2 rows in yarn A. 4 rows in yarn B, : 2 rows in yarn A, ; 2 rows in yarn B. ; 2 rows in yarn A, ; 2 rows in yarn B. : Repeat for length required. i во. ; NOTE: At color changes, don't break ; yarn, instead carry yarn not in use : loosely up side of work.
STITCH COLLECTION ЕЛ Ocean Spray This light, lacy stitch is based on a simple crochet shell stitch. It looks attractive worked in one or more yarn colors and is perfect for making shawls, scarves, and wraps. © FOUNDATION CHAIN: multiple of 12 chains plus 3. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de inlo 4th ch from hook, I de into each rem ch to end, turn. ROW 2: Ch 3, 2 de into first de, ch 2, sk next 3 de, 1 sc into next de, ch 5, sk next 3 de, 1 sc into next de, ch 2, sk next 3 de, * 5 de into next de, ch 2, sk next 3 de, 1 sc into next de, ch 5, sk next 3 de, 1 sc into next de, ch 2, sk next 3 de; rep from * ending with 3 de into 3rd of beg skipped ch-3, turn. ROW 3: Ch 4, sk first de, 1 de into next de, ch 1, 1 de into next de, ch 2, sk next ch-2 sp, 1 sc into next ch-5 sp, ch 2, * |1 de Into next de, ch 11 four times, 1 de into next de, ch 2, sk next ch-2 sp, 1 sc into next ch-5 sp. ch 2; rep from * to last 2 de, |1 de into next de, ch 11 twice, I de into 3rd of ch-3, turn. ROW 4: Ch 5, sk first de, 1 de into next de, ch 2, 1 de into next de, * sk next sc, |1 de into next de, ch 2| four times, 1 de into next de; rep from * to last sc, sk last sc, |1 de into next de, ch 21 twice, 1 de into 3rd of ch-4, turn. ROW S: Ch 3, 2 de into next ch-2 sp, 1 de into next de, 2 de into next ch-2 sp, sk next de, 1 de into next de, * |2 de into next ch-2 sp, 1 de into next de) three limes, 2 de into next ch-2 sp, sk next de, 1 de into next de; rep from * to last ch-2 sp, 2 de into last ch-2 sp, 1 de into next de. 2 de into sp formed by ch-5, sk first 2 chs of ch-5, 1 de into 3rd of ch-5, turn. ROW 6: Ch 3, 2 de into first de, ch 2, sk next 3 de, 1 sc into next de, ch 5, sk next 3 de, 1 sc into next de, ch 2, sk next 3 de, * 5 de into next de, ch 2, sk next 3 de, 1 sc into next de, ch 5, sk next 3 de, 1 sc into next de, ch 2, sk next 3 de; rep from * ending with 3 de into 3rd of ch-3, turn. Rep Rows 3-6, changing yarns in the following color sequence: 1 row in yarn A, 3 rows in yarn B. Repeat for length required. Fasten off yarn. ЕЭ Delicate Lace Make the foundation chain and work Rows 1 and 2 as left. Rep Rows 3-6 for length required. Fasten off yarn. 57
STITCH COLLECTION SI EH1 Feather and Fan Probably the best-known of the classic Shetland shawl lace patterns, this stitch also lends itself well to being knitted in heavier yarns using a strong color palette. The intricate pattern also looks effective worked in one yarn color. 14 + 1 Special abbreviation si 2 = slip next two stitches one at a time. Using yarn A, CO a multiple of 14 sts plus 1. ROW 1: (RS) * KI, K4log, |YO, KI I five times, YO, si 2, K2tog, p2sso; rep from * to last st, KI. ROW 2: * K4, P7, КЗ; rep from * to last st, KI. ROW 3: K. ROW 4: K1, P to last st, K1. Rep Rows 1-4, changing yarns in the following color sequence: 4 rows in yarn A, 4 rows in yarn B, 4 rows in yarn C, 4 rows in yarn D, 4 rows in yarn E. Repeat for length required. BO. NOTE: Slip all stitches knitwise. EU Adagio CO as left. Rep Rows 1—4 for length required, ending with a Row 4. BO.
STITCH COLLECTION • 0 © E3 Pink Velvet ЕЕ1 Lacy Bands This pretty lacy crochet stitch would make a lovely shawl for a new baby worked in shades of soft baby yarn. For a different effect, choose a strong background color and contrast it with narrow stripes of variegated velvety tape yarn. FOUNDATION CHAIN: multiple of 9 chains plus 8. from * to Iasi 2 sc, sk next sc, 1 sc into last sc, turn. Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Row 3. changing yams in the following color sequence: 3 rows in yam A, 1 row in yarn B, 2 rows in yarn A. Repeat for length required. Fasten off yarn. SPECIAL YARN KEY В variegated velvet yam Using yarn A, make the required length of foundation chain. row i: (RS) 1 sc into 2nd ch from hook, 1 sc into each ch to end, turn. ROW 2: Ch 1, I sc into first sc, sk next 2 sc. |1 sc, ch 3, 3 del into next sc, * |sk next 2 sc. I sc into next sc, ch 3| twice, sk next 2 sc, |1 sc, ch 3, 3 dc| into next sc; rep from * to last 3 sc, sk next 2 sc, 1 sc into last sc, turn. ROW 3: Ch 1, 1 sc into first sc, 11 sc, ch 3, 3 dc| into next ch-3 sp, * |1 sc into next ch-3 sp, ch 3| twice, |1 sc, ch 3, 3 dc| into next ch-3 sp; rep Rep Row 3, changing yarns in the following color sequence: 5 rows in yarn A, * 2 rows in yarn В 2 rows in yarn C, 4 rows in yarn A, 4 rows in yarn D, 2 rows in yarn A, 2 rows in yarn B, 4 rows in yarn D, 4 rows in yarn A. Repeat from * for length required. Fasten off yarn. 59
STITCH COLLECTION E3 Granada © Lace and ridges make up this small-scale stitch and produce a pattern of gently curving ripples. Choose a light background color and darker stripes, or mix three neutral colors with stripes in a darker novelty yam. Using yarn A, CO a multiple of 7 sts plus 4. ROW I: K. ROW 2: KI, P to last SI, KI. ROW 3: КЗ, * YO, Pl, P3tog, Pl, YO, K2; rep from * to last st, KI. ROW 4: KI, P to last st. KI. Rep Rows 1—1, changing yarns in the following color sequence and ending with a Row 4: 8 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C. Repeat for length required. BO. NOTE At color changes, don't break main yam. instead carry it loosely up side of work. • o»« SPECIAL YARN KEY О novelty effects yam Morocco Using yarn A. CO as left. Rep Rows 1-4, changing yarns in the following color sequence and ending with a Row 4: 4 rows in yam A, 4 rows in yarn B. 4 rows in yam A, 4 rows in yarn C. 4 rows in yarn D, 4 rows in yam C, 4 rows in yarn D 4 rows in yam C. Repeat for length required. BO. NOTE: Where possible, don't break yarn at color changes, instead carry the yarn not in use loosely up the side of the work. 60
STITCH COLLECTION # О О 89 Terrazzo Openwork and solid bands make up this attractive ripple pattern. Work deep and narrow stripes or change the depth of the stripes to give a completely new look; choosing one color for the openwork bands to contrast with dark and light solid stripes. FOUNDATION CHAIN: multiple of 1 4 chains plus 2. Special abbreviations bps = beginning puff stitch (draw loop on hook up IYO, draw up loop in same stitchl twice, YO, draw through 4 loops on hook YO and draw through remaining 2 loops on hook). ps = puff stitch (YO, draw up loop in stitch indicated, YO, draw up loop in same stitc h, YO, draw through 4 loops on hook, YO and draw through remaining 2 loops on hook). cl = single crochet cluster (draw up loop in next sc, sk next de itog, draw up loop in next sc, YO and draw through all 3 loops on hook). Using yarn A, make lhe required length of foundation chain. ROW I: (RS) 1 sc into 2nd ch from hook, 1 sc into each of next 6 chs, 3 sc into next ch, * I sc into each of next I 3 chs, 5 sc into next ch; rep from ❖ to last 7 chs, I sc into each of next 7 chs, turn. ROW 2: Ch 3, sk first 2 sc, I de into each of next 6 sc, 3 de into next sc, ❖ 1 de into eac h of next 6 sc, dc3tog, I de into each of next 6 sc, 3 de into next sc; rep from to last 8 sc, 1 de into each of next 6 sc, sk next sc, 1 de into last sc, turn. ROW 3; Ch 1, I sc into first de, I sc into each of next 6 de, ❖ 3 sc into next de, 1 sc into each of next 6 de, cl, I sc into each of next 6 de; rep from ❖ to last 9 sts, 3 sc into next de, I sc into each of next 6 de, sk next de, I sc into 3rd of ch-3, turn. ROW4: Ch-1, bps into first sc, |ch I, sk next 2 sc, ps into next sc I twice, * ch I, sk next sc, Ips, ch 11 twice into next sc, sk next sc. Ips into next sc, ch 1, sk next 2 sc| four times, ps into next sc; rep from * to last 10 sc, ch I, sk next sc, |ps, ch 11 twice into next sc, sk next sc, Ips into next sc, ch 1, sk next 2 sc| twice, ps into last sc, turn. ROW 5: I sc into first ps, 11 sc into next ch-1 sp and into next ps| three limes, * 3 sc into next ch-1 sp, |l sc into next ps and into next ch-1 spl six times, 1 sc into next ps; rep from ❖ to last 4 ch-1 sps, 3 sc into next ch-1 sp, [1 sc into next ps and into next ch-1 sp| three times, 1 sc into last ps, turn. Rep Rows 2-5, changing yarns in the following color sequence: I row in yarn A, * 1 row in yarn B. 3 rows in yarn A. 1 row in yarn C, 3 rows in yarn B. Repeat from ❖ for length required. Fasten off yarn. »♦•••••••••••••••••••••••♦••♦♦ • • • • • • Patience 90 14 + 2 : Using yarn A. make lhe foundation : chain and work Row 1 as left. : Rep Rows 2-5, changing yarns in lhe following color sequence: 7 rows in yarn A. 1 row in yarn B. 7 rows in yarn С. I row in yarn B. : Repeat for length required. : Fasten off yarn. 61
13 + г ЕЛ Crisp Zigzags This smooth-surfaced ripple pattern looks very different when the colors and depths of stripes are varied. Three variations are shown here, but you could easily make up your own color scheme. с ЕЗ Christabel E : Using yarn A, CO as left. ; Rep Rows 1 and 2, changing yarns in I the following color sequence anti ; ending with a Row 2: 6 rows in yarn A, 6 rows in yarn B. Repeat lor length required. BO. Special abbreviation inc = increase one stitch by lifting horizontal thread between last stitch worked and next stitch and knitting into the back of it. Using yarn A, CO a multiple of 13 sis plus 2. ROW 1: (RS) * K2, inc, K4, si 1, K2tog, psso, K4, inc; rep from * Io end. ROW 2: KI, Pto last st, KI. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 4 rows in yarn A, 2 rows in yam B, 2 rows in yarn A. 2 rows in yam B. 6 rows in yarn A, 2 rows in yarn C, 4 rows in yarn A, 4 rows in yarn D, 4 rows in yarn A, 2 rows in yam E, 2 rows in yam A, 2 rows in yam E. Repeat for length required. BO. NOTE: Where possible, don't break yarn at color changes, instead carry yarn not in use loosely up the side of the work. note: Don't break yam at color changes, instead carry yam not in use loosely up side of work. • о Bals^ Cool Turquoise Using yam A, CO as above. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 10 rows in yarn A, 2 rows in yarn B. Repeat for length required. BO. note: Al color changes, don't break main yarn, instead carry it loosely up side of work.
STITCH COLLECTION * o«»o FOUNDATION CHAIN: multiple of 7 chains plus 1. Using yarn A, make the required length of foundation chain. row 1: (RS) 1 de into 4th ch from hook, 2 de into next ch. * sk next 3 chs, ch 3, I de into each of next 3 chs; rep from * to last 4 chs, sk next 3 chs, 1 sc into last ch, turn. ROW 2: Ch 3, 2 de into first sc, * sk next 3 de, 1 sc into first of 3 chs, eh 3, 1 de into each of next 2 chs, 1 de into next sc; rep from * ending last rep with sk next 2 de, 1 sc into 3rd of beg skipped ch-3, turn. El Regatta Unlike most other ripple stitch patterns, this one is not made by working increases and decreases. Instead, blocks of double crochet stitches are arranged al a different angle on alternate rows to create an unusual ripple effect. ROW 3: Ch 3, 2 de into first sc, * sk next 3 de, I sc into first of 3 chs, ch 3, I de into each of next 2 chs, I de into next sc; rep from * ending last rep with sk next 2 de. I sc into 3rd of ch-3, turn. Boston Blue Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yams in the following color sequence: 2 rows in yam A, 2 rows in yam B, 2 rows in yarn A. Repeat for length required. Fasten off yarn. Rep Row 3, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B. 2 rows in yarn C, 2 rows in yarn D, 2 rows in yarn E. Repeat for length required. Fasten off yarn. »0
STITCH COLLECTION EEl Mardi Gras 15 + 4 Sweeping bands of color arch upward to make a fun ripple pattern. Hot, strong colors look good with this type of pattern as they accentuate the movement of the colored stripes. Special abbreviation ssk = slip, slip, knit (slip next two stitches one at a lime, insert left needle into fronts of slipped stitches and knit them together). Using yarn A. CO a multiple of 15 sts plus 4. row i: (WS) KI, P3, * K11, P4; rep from * lo last 15 sts, K11, P3, K1. ROW 2: K4, * Pl 1, K4; rep from * to end. ROW 3: KI, PI, * P2tog, P11, P2log tbl; rep from * lo last 2 sts, PI, KI. row 4: K2, * ssk, K9, K2tog; rep from * to last 2 sts, K2. ООО ROW5: KI, PI, * P2tog, P7, P2tog tbl; rep from * to last 2 sts, Pl, K1. row 6: K4, * |YO, KI | five times, YO, K4; rep from * to end. Rep Rows 1-6 for length required, changing yarns in the following color sequence and ending with a Row 2: 2 rows in yarn A. * 2 rows in yarn B. 10 rows in yarn A, 2 rows in yarn C, 10 rows in yarn A. * Repeat from * to * for length required. BO. GO > ЕЭ Hio Using yarn A, CO as left. Rep Rows 1-6 for length required, changing yarns in the following color sequence and ending with a Row 6: 6 rows in yarn A, 6 rows in yarn B, 6 rows in yarn C. Repeat for length required. BO.
STITCH COLLECTION A OO Sunset Glow Rich, glowing colors are used to crochet this gently rippling pattern, but a different color palette of jewel-toned bright pastel shades or cool blues and greens would look equally effective. 99 Rich Reds 12+ 11 FOUNDATION CHAIN: multiple of 12 chains plus 1 I. Using yarn A, make the required length of foundation chain. ROW 1: (RS) I de into 3rd ch from hook, 1 de into each of next 3 chs; ❖ ch 2, 1 de into each of next 5 chs, sk next 2 chs, I de into each of next 5 chs; rep from * to last 5 chs, ch 2, I de into each of last 5 chs, turn. ROW 2: Ch 3, sk first 3 de, 1 de into next de, ch 1, sk next de, * 11 de, ch 1, dc4tog, ch 1, 1 del into next ch-2 sp, |ch 1, sk next de, I de into next de) twice, sk next 2 de, |1 de into next de, ch I, sk next del twice; rep from ♦ to last ch-2 sp, |1 de, ch 1, dc4tog, ch I, 1 del into last ch-2 sp, ch 1, sk next de, 1 de into next de, ch I, sk next 2 de, I de into 2nd of beg skipped ch-2, turn. ROW' 3: Ch 3, sk first ch-1 sp, |1 de into next de and into next ch-1 sp| twice, ch 2, 11 de into next ch-1 sp and into next del twice, * I de into next ch-1 sp, sk next 2 de, 1 de into next ch-1 sp, |1 de into next de and into next ch-1 sp] twice, ch 2, |l de into next ch-1 sp and into next dc| twice; rep from * to end, I de into 3rd of ch-3, turn. ROW' 4: Ch 3, sk first 3 de, 1 de into next de, ch I, sk next de, * II de, ch 1, dc4log, ch 1, I del into next ch-2 sp, |ch 1, sk next de, I de into next del twice, sk next 2 de, Il de into next de, ch 1, sk next dc| twice; rep from ♦ to last ch-2 sp, |1 de, ch I, dc4log, ch I, I dc| into last ch-2 sp, ch 1, sk next de, I de into next de, ch 1, sk next 2 de, I de into 3rd of ch-3, turn. Rep Rows 3 and 4, changing yarns in the following color sequence: 3 rows in yarn A, 3 rows in yarn B. 3 row's in yarn C. Repeat for length required. Fasten off yarn. Using yarn A, make the foundation chain and work Rows I and 2 as above. Rep Rows 3 and 4. changing yarns in the follow ing color sequence: 2 row's in yarn A, I row in yarn B. 3 rows in yarn A. 2 rows in varn B, < ’ 1 row in yarn A. 3 rows in yarn B. Repeat for length required. Fasten off varn. i * I t 00 65
STITCH COLLECTION 10 + 1 ЕБЗ Fishtail Lace A traditional and well-loved pattern of lace fishtail shapes makes a softly undulating ripple pattern when worked in stripes of harmonious colors. Choose subtle, cool colors like these or go for a range of hot colors to make a bold impression. Using yarn A, CO a multiple of 10 sts plus 1. ROW 1: (RS) KI, *YO, КЗ, sl 1, K2tog, psso, КЗ, YO, K1; rep from * to end. ROW 2 and every alt row: K1, P to last Sl, K1. ROW3: KI, * KI, YO, K2. sl 1, K2log, psso, K2, YO, K2; rep from * to end. ROWS: KI, * K2, YO, KI, sl 1, K2tog, psso, K1, YO, КЗ; rep from * to end. ROW 7: КI, * КЗ, YO, sl I, K2tog, psso, YO, K4; rep from * Io end. ROW8: K1, P to last sl, KI. Rep Rows 1-8, changing yarns in the following color sequence and ending with a Row 8: 16 rows in yarn A, 8 rows in yarn B. Repeat for length required. BO. NOTE: Don't break main yarn at color changes, instead carry it loosely up side of work. 00 ПП1 Wisteria Using yarn A, CO as left. Rep Rows 1-8. changing yarns in the following color sequence and ending with a Row 8: 8 rows in yarn A, 2 rows in yarn B. 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn A, 8 rows in yarn B. 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn A, 2 rows in yarn B. Repeat for length required. BO. NOTE: Don’t break yarn at color changes, instead carry yarn not in use loosely up side of work.
О® с FOUNDATION CHAIN: multiple of 1 6 chains plus 2. Special abbreviation mb = make bobble (keeping last loop of each de on the hook, work 5 de into same stitch, YO and draw through all 6 loops on hook). Using yarn A, make the required length of foundation chain. row i: (WS) 2 sc into 2nd ch from hook, * 1 sc into each of next 7 chs, sk next ch, 1 sc into each of next 7 chs, 3 sc into next ch; rep from $ to end, ending last rep with 2 sc into last ch, turn. ROWS 2 and 4: Ch 1, 2 sc into first sc, $ 1 sc into each of next 7 sc, sk next 2 sc, 1 sc into each of next 7 sc, 3 sc into next sc; rep from * to end,
STITCH COLLECTION ПгЗ Bobble Zigzags Chunky little bobbles add texture to a simple chevron pattern worked in single crochet stitches. The bobbles are worked on wrong side rows, then popped through to the right side as each one is completed. ending last rep with 2 sc into last sc, turn. ROW 3: Ch 1, 2 sc into first sc, * 1 sc into each of next 3 sc, mb, 1 sc into each of next 3 sc, sk next 2 sc, 1 sc into each of next 3 sc, mb, 1 sc into each of next 3 sc, 3 sc into next sc; rep from * to end, ending last rep with 2 sc into last sc, turn. ROW 5: Ch 1,2 sc into first sc, * 1 sc into each of next 7 sc, sk next 2 sc, 1 sc into each of next 7 sc, 3 sc into next sc; rep from * to end, ending last rep with 2 sc into last sc, turn. Rep Rows 2-5, changing yarns in the following color sequence: 3 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C. Repeat for length required. Fasten off yarn. Cool Bobbles Using yarn A, make the foundation chain and work Row 1 as left Rep Rows 2-5, changing yarns in the following color sequence: 5 rows in yarn A, * 2 rows in yarn B, 6 rows in yarn A. Repeat from * for length required. Fasten off yarn.
ЕЕЗ Undulating Stripes A straightforward lace and chevron ripple stitch is given a different twist by varying the number of stitches between increases and decreases, resulting in a beautifully undulating striped pattern. Using yarn A. CO a multiple of 20 sts plus 1. ROW 1: (RS) * KI, YO, K5, K2tog, P5, sl 1, K1, psso, K5, YO; rep from * to last st, KI. ROW 2: Kt, P7, * K5, PI5; rep from * to last 13 sts, K5, P7, K1. Rep Rows 1 and 2, changing yarns in lhe following color sequence and ending with a Row 2: 4 rows in yarn A. 4 rows in yarn B, о с 4 rows in yarn C, 2 rows in yarn D, 4 rows in yarn C. Repeat for length required. BO. NOTE: Where possible, don't break yarn at color changes, instead carry yarn not in use loosely up the side of the work. Sea Drift Using yarn A, CO as left. Rep Rows 1 and 2, changing yams in the following color sequence and ending with a Row 2: 10 rows in yarn A, 10 rows in yarn B. Repeat for length required. BO.
ООО ° « О о е « FOUNDATION CHAIN: multiple of 1 6 chains plus 2. Using yarn A, make the required length of foundation chain. row i: (RS) 2 sc into 2nd ch from hook, * 1 sc into each of next 7 chs, sk next ch, 1 sc into each of next 7 chs, 3 sc into next ch; rep from * to end, ending last rep with 2 sc into last ch, turn. ROW 2: Ch 1, 2 sc into first sc, * 1 sc into each of next 7 sc, sk next 2 sc, 1 sc into each of next 7 sc, 3 sc into next sc; rep from * to end, ending last rep with 2 sc into last sc, turn.
STITCH COLLECTION EES Ribby This interesting texture is created by working into the back loops of single crochet stitches. Use a cool color palette as shown, or work in a more random way and use up any oddments from your yarn stash. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn B, 4 rows in yarn A, 2 rows in yarn C, 2 rows in yarn D, 2 rows in yarn C, 4 rows in yarn A 2 rows in yarn E. Repeat for length required. Fasten off yarn. NOTE: After completing Row 1, work into the back loops only of all stitches. идя Ensemble Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2, changing yarns in the following color sequence: 5 rows in yarn A, 5 rows in yarn B, 5 rows in yarn C, 5 rows in yarn D. Repeat for length required. Fasten off yarn. 71
STITCH COLLECTION 108 11 Welting Fantastic Deep bands of reverse stockinette stitch form raised wavy ridges across (he surface of this stitch. Knit it all in one color or use a brightly multicolored novelty eyelash yarn to work stripes across the ridge rows. Special abbreviation ssk = increase by knitting into front and back of next stitch. CO a multiple of I I sts. ROW 1: (RS) ❖ K2tog, K2, inc, KI, inc, K2, K2tog tbl; rep from * to end. ROWS 2, 4, and 6: КI, P to last St, K1. ROWS 3 and 5: Rep Row 1. ROWS 7, 9, and 11: K I, P to last St, KI. ROWS « and 10: К. ROW 12: K. Rep Rows I-12 for length required, ending with a Row 6. BO. 109 Bird of Paradise Using yarn A. CO as left. Rep Rows I-12, changing yarns in the following color sequence and ending with a Row 12: 6 rows in yarn A, 2 rows in yarn B. 4 rows in yarn A. Repeat for length required. BO. NOTE: Don't break main yarn at color changes, instead carry the yarn loosely up the side of the work. SPECIAL YARN KEY В multicolored eyelash yarn
STITCH COLLECTION • Q с < 17 ♦ 3 FOUNDATION CHAIN: multiple of 17 chains plus 3. Using yarn A, make lhe required length of foundation chain. ROW l: (RS) I sc into 2nd ch from hook, I sc into each ch to end, turn. ROW 2: Ch 3, Ch 3, sk first 3 sc, |3 de in next sc, sk next 2 sc| twice, |3 de ch 3, 3 del into next sc, * sk next 2 sc, 3 de into next sc, sk next 2 sc, de3tog, sk next 4 sc, de3log, sk next 2 sc, 3 de into next sc, sk next 2 sc, |3 de, ch 3, J del into next sc; rep from * to last 9 sc, sk next 2 sc, |3 de into next sc, sk next 2 sc | twice, I de into last sc, turn. ROW 3: Sk sp between turning ch and next 3-dc group, 3 de into each of next 2 sps, 13 de, ch 5, 3 de] into next ch-3 sp, ♦ J de into next sp, dc3tog into next sp, sk next sp, dc3tog into next sp, 3 de into next sp, |3 de, ch 3, 3 del into next ch-3 sp; rep from * lo Vivid Chevrons Strong colors work well on this hold crochet pattern that features openwork and solidly worked bands. Narrow stripes of strong colors also show up well against a variegated background. last 3 sps, 3 de into each of next 2 sps, 1 de into sp between last 3-dc group and turning ch, turn. ROW 4: 1 sc into first de, sk next de, 1 sc into each of next 8 de, * 3 de into next ch-3 sp, I sc into each of next 14 sts; rep from 4г lo last ch-3 sp, 3 sc into last ch-3 sp, I sc into each of next 8 de, sk next de, I sc into 3rd of ch-3, turn. ROW 5: Ch 3, sk first 2 sc, 1 de into each of next 8 sc, * I de into next sc, I de into each of next 7 sc, sk next 2 sc, 1 de into each of next 7 de; rep from ♦ to last 1 I sc, 3 de into next sc, I de into each of next 8 sc, sk next sc, I de into last sc, turn. ROW 6: Ch 3, sk first 2 sc, I de into each of next 8 de, * 3 de into next de, 1 de into each of next 7 de, sk next 2 de, I de into each of next 7 de; rep from ❖ to last 10 de, 3 de into next de, 1 de into each of next 8 de, sk last de, I de into 3rd of ch-3, turn. ROW 7: Ch 1, 1 sc into first de, 1 sc into each de along row lo last de, sk last de, I sc into 3rd of ch-3, turn. Rep Rows 2-7, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn В 4 rows in yarn A. 2 rows in yarn C. 4 rows in yarn A, 2 rows in yarn D. Repeat for length required. Fasten off yarn. NOTE: When asked (O work in sps, work in spaces between 3-dc groups or dc3tog groups. 111 Chinese Turquoise Using yarn A, make the foundation chain and work Row I as left. Rep Rows 2-7, changing yarns in lhe following color sequence: I row in yarn A, 2 rows in yarn B, I row in yarn C, 2 rows in yarn B. Repeat for length required. Fasten off yarn. 73
STITCH COLLECTION 8 + 4 112 Truffle A favorite lace stitch is given a new look when worked in hold stripes of neutral colors. Choose to work wide stripes or incorporate narrow stripes as well for added interest. Using yarn A. CO a multiple of 8 sis plus 4. ROW 1: (RS) K2, *YO, KI tbl. YO, K2tog tbl, K5; rep from ❖ lo Iasi 2 sts, K2. ROW 2: KI, PI, ❖ P4, P2log tbl, P3; rep from ❖ to last 2 sts, P1, KI. ROW 3: K2, * YO, КI tbl, YO, K2, K2log tbl, КЗ; rep from ❖ lo Iasi 2 sts, K2. ROW 4: KI, PI, ❖ P2, P2tog tbl, PS; rep from ❖ to last 2 sis, PI, KI. ROW 5: K2. ♦ KI tbl, YO, K4, K2log tbl, KI, YO; rep from 4* lo last 2 sis, K2. ROW 6: KI, P1,*P1, P2tog tbl, P6; rep from ❖ to last 2 sis, PI, KI. ROW 7: K2, * K5, K2tog, YO. KI tbl, YO; rep from * lo last 2 sts, K2. row»: KI, PI, ♦ P3, P2tog, P4; rep from ❖ lo last 2 sts, PI, K1. «0 ROW 9: K2, * КЗ, K2tog, K2, YO. KI tbl, YO; rep from * to last 2 sis, K2. ROW io: KI, Pl, * PS, P2log. P2; rep from ❖ lo last 2 sis, PI, KI. ROW 11: K2. * YO. KI, K2tog, K4, YO. KI tbl; rep from * lo Iasi 2 sts, K2. ROW 12: KI. PI, * P6, P2tog, Pl; rep from ❖ lo last 2 sts, Pl, KI. Rep Rows 1-12, changing yarns in the following color sequence and ending with a Row 12: 12 rows in yarn A, 12 rows in yarn B. 12 row's in yarn C. Repeal for length required. BO. NOTE: The number of stitches varies between odd and even rows. 113 Fudge Using yarn A, CO as left. Rep Row's 1-12, changing yarns in the following color sequence and : ending with a Row' 12: 8 rows in yarn A, 2 row's in yarn B, 2 rows in yarn A, 8 rows in yarn B. 2 rows in yarn C, 2 rows in yarn B. 8 rows in yarn C 2 row's in yarn A, 2 rows in yarn C. : Repeal for length required. • BO. I NOTE: Where possible, don't break t yarn al color changes, instead carry : yarn not in use loosely up the side of the work. 74
STITCH COLLECTION ЛВ Strata A gently undulating ripple pattern worked in double crochet stitches is given three distinct looks here. Wide stripes are contrasted with narrow ones, even-sized stripes are worked in two close colors, and mohair yarn is used to add texture. FOUNDATION CHAIN: multiple of 10 chains plus 3. Special abbreviation de3 tog = work 3 double crochet stitches together to decrease 2 stitches (work 3 incomplete double crochet stitches, keeping last loop of each stitch on the hook. Yarn over hook and draw through all 4 loops on hook). Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de into 4th ch from hook, 1 de into each of next 3 chs, * dc3tog, 1 de into each of next 3 chs, 3 de into next ch, 1 de into each of next 3 chs; rep from * to last ch, 2 de into last ch, turn. ROW 2: Ch 3, 1 de into same st, 1 de into each of next 3 de, * dc3tog, 1 de into each of next 3 de, 3 de into next de, 1 de into each of next 3 de; rep from * to last st, 2 de into 3rd of beg skipped ch-3, turn. ROW 3: Ch 3, 1 de into same st, 1 de into each of next 3 de. * dc3tog, 1dc into each of next 3 de, 3 de into next de, 1 de into each of next 3 de; rep from * to last st, 2 de into 3rd of ch- 3, turn. Rep Row 3, changing yarns in the following color sequence: 4 rows in yarn A, I row in yarn B, 4 rows in yarn С, 1 row in yarn B. Repeat for length required. Fasten off yarn. Triple Ripple Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yams in the following color sequence: 3 rows in yarn A, 3 rows in yarn B, 1 row in yarn A, 1 row in yarn C, 1 row in yam A, 3 rows in yarn B. Repeat for length required. Fasten off yarn. В © Oft « SPECIAL YARN KEY В cream mohair yarn Hid Red Fox Using yarn A, make the foundation chain and work Rows 1 and 2 as above. Rep Row 3, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B. Repeat for length required. Fasten off yarn.
STITCH COLLECTION @@ 17» a EKB Dimple Shale This stitch is a variation of Old Shale, page 110, a classic Shetland lace pattern, and it creates a softly waving pattern. Enhance this effect by choosing a pastel color palette or be bold and contrast dark stripes against a plain background. Using yarn A, CO a multiple of 17 sts plus 2. ROW 1: (RSl ♦ K2, P2, K2tog tbl, |K1, YOI six times, KI, K2tog, P2; rep from * to last 2 sts, K2. ROW 2: KI, PI. * K2, PI 5, K2, P2; rep from * to last 21 sts, K2. PI 5, K2, Pl, KI. ROW 3: * K2. P2. K3tog tbl, K9, K3tog, P2; rep from * to last 2 sts, K2. ROW4: KI, P1,*K2, P11.K2, P2; rep from * to last 17 sts, K2, Pl 1, K2, PI, K1. Rep Rows 1-4, changing yarns in the following color sequence and ending with a Row 4: 4 rows in yarn A, 4 rows in yarn B, 4 rows in yarn C. 4 rows in yam A. 4 rows in yarn B, 4 rows in yarn D Repeat for length required. BO. SPECIAL YARN KEY C metallic novelty yarn ilE] Russian Dance Using yam A. CO as left. Rep Rows 1 -4. changing yams in lhe following color sequence and ending with a Row 4: 16 rows in yarn A, 4 rows in yam В 4 rows in yam C, 4 rows in yarn B, 16 rows in yam A. Repeat for length required. BO.
STITCH COLLECTION Grisaille Rows of interlocking crochet shells create a pretty ripple pattern with lots of surface texture. Change the arrangement of stripes and colors to vary the pattern or work the stitch in pastel shades to make a lovely baby blanket. 10*2 A < Q D 120 Soft Shells FOUNDATION CHAIN: multiple of IO chains plus 2. Special abbreviations f - tan (work 13 de, ch 1, 3 del into next chain or space). v= v stitch (work It hdc, ch 1, I hdcl into next space). Using yarn A, make the required length of foundation chain. ROW 1: (RS) I sc into 2nd ch from hook, I sc into next ch, * sk J chs, I into next ch, sk next J chs, 1 sc into next ch, ** ch I, sk next ch, 1 sc into next ch; rep from * ending last rep at I sc into last ch, turn. ROW 2: Ch 2, I hdc into first st. * ch 3, I sc into ch-1 sp at center of next fan, ch 3, ❖❖ v into next sp; rep from ❖ ending last rep at 2 hdc into last sc, turn. row 3: Ch 3, 3 de into first st, ❖ 1 sc into next ch-3 sp, 1 ch, 1 sc into next ch-3 sp, ** i into center of next v stitch; rep from * ending last rep at 4 de into 2nd of ch-2, turn. ROW 4: Ch I, I sc into first st, * ch 3, v into next sp, ch J, I SC into sp at center of next fan; rep from * ending with I sc into 3rd of ch-3. ROW 5: Ch I, I sc into first st, ❖ I sc into next ch-3 sp, I into center of next v stitch, I sc into next ch-3 sp, ch I; rep from * ending last rep at I sc into last sc, turn. Rep Rows 2-5, changing yarns in the following color sequence: 7 rows in yarn A, ❖ 8 rows in yarn B, 2 rows in yarn C, 8 rows in yarn D, 8 rows in yarn A. Repeat from ❖ for length required. Fasten off yarn. Using yarn A, make the foundation chain and work Row I as left. Rep Rows 2-5, changing yarns in the following color sequence: 3 rows in yarn A. 3 rows in yarn B, 3 rows in yarn C. Repeat for length required. Fasten off yarn.
STITCH COLLECTION ESI Mango 12 + 5 Smooth and textured chevrons combine to make this attractive pattern. Work in two-row contrasting stripes of smooth yarn or add rows of a fluffy mohair yarn in a bright color for a different effect. Special abbreviation ssk = slip, slip, knit (slip next two stitches one al a time, insert left needle into fronts of slipped stitches and knit them together). sl 2 = slip next two stitches one at a time. Using yarn A, CO a multiple of 12 sis plus 5. Knit 1 row. ROWS 1, 3, and 5: (RS) P1, KI, ssk, * K9, sl 2, KI, p2sso; rep from *, ending last rep K9, K2tog, KI, sl 1. ROW 2, 4, and 6: PI, KI, * PI, K4, |K I. YO, KI | in next st, K4; rep from * to last 3 sts, P1, K1,sl 1. ROWS 7, 9, and 11: Rep Row I. ROWS 8 and 10: P7, * |P1, YO, P11 in next st. P9, rep from * to last 7 sts, P6, K1. ROW 12: P7, * |P1, YO, PI | in next st, P9, rep from * to last 7 sts, P6. KI. Rep Rows 1-12, changing yarns in the following color sequence and ending with a Row 12. 2 rows in yarn B, 2 rows in yarn A. Repeat for length required. BO. NOTES: Slip all stitches knitwise. At color changes, don't break yarn, instead carry yarn not in use loosely up side of work. • o ЕРЯ Citrus Crush Using yarn A, CO as left and knit I row. Rep Rows 1-12, changing yarns in lhe following color sequence and ending with a Row 12: 2 rows in yarn B, 2 rows in yarn A, 2 rows in yarn B, 6 rows in yarn A. Repeat for length required. BO. NOTES: Al color changes, don't break main yarn, instead carry it loosely up side of work.
STITCH COLLECTION О О «! Q 0 124 Ruby Sparkle 9 + 3 A stitch pattern ol rippling waves would make a great throw for a den or study. Choose warm shades of yellow, orange, and red and add a multicolored metallic yarn for a dash of glitz. Using yarn A, make lhe foundation chain and work Rows I and 2 as left. Rep Row 3, changing yarns in the following color sequence: 2 rows in yarn A. I row in yarn B. 2 rows in yarn C. Л ~ * I row in yarn В. 2 rows in yarn A. Repeat for length required. Fasten off yarn. FOUNDATION CHAIN: multiple of 9 chains plus 3. Using yarn A. make lhe required length of foundation chain. ROW I: (RS) Dc2tog over 3rd and 4th chs from hook, de2log over next 2 chs, ❖ 5 de into next ch, |dc2log over next 2 chs) four times; rep from ❖ to last 6 chs, 5 de: into next ch, |dc:2log over next 2 chs| twice, I de: into last ch, turn. ROW 2: Ch 3, dc2tog twice, ❖ 5 de into next de, dc2log 4 times; rep from * lo last 6 sts, 5 de into next de, dc2tog twice; I de into 2nd of beg skipped ch-2, turn. ROW 3: Ch 3, dc2log twice, * 5 de into next de, dc2tog 4 limes; rep from * to last 6 sts, 5 de into next de, dc2log twice; I de into 3rd of ch-3, turn. Rep Row changing yarns in the following color sequence: 2 rows in yarn A, r 2 rows in yarn B. 2 rows in yarn C, 2 rows in yarn D. 2 rows in yarn E. Repeat for length required. Fasten off yarn. SPECIAL YARN KEY C multicolored metallic yarn • 00 79
STITCH COLLECTION 10 + 1 EES Falling Leaves This pretty pattern of interlocking leaf shapes has many variations in traditional lace knitting, but it also works well here knitted in a thick yarn without losing the delicacy of the stitch. Use one color throughout or work in two-row stripes. CO a multiple of 10 sis plus 1. ROW 1: (RS) KI, * YO, КЗ, sl 1, K2tog, psso, КЗ, YO, KI; rep from * to end. ROW 2 and every alt row: K1, P to last St, KI. ROW3: KI, * K1, YO, K2, sl I, K2tog, psso, K2, YO, K2; rep from * to end. ROW 5: KI, * K2, YO, K1, sl 1, K2log, psso, KI, YO, КЗ; rep from * to end. ROW 7: KI, * КЗ, YO, sl 1, K2tog, psso, YO, K4; rep from * to end. ROW 9: K2tog, * КЗ, YO, KI, YO, КЗ, sl 1, K2tog, psso; rep from * to last 9 sts, КЗ, YO, K1,YO, КЗ, sl 1, KI, ROW 11: K2tog, * K2, YO, КЗ, YO. K2, sl 1, K2tog, psso; rep from * to last 9 sts, K2, YO, КЗ, YO, K2, sl 1, K1, psso. ROW 13: K2tog, * K1, YO, K5, YO, КI, sl 1, K2tog. psso; rep from * to last 9 sts, KI.YO, K5, YO, K1, sl 1, K1, psso. ROW 15: K2tog, * YO, K7, YO, sl 1, K2tog, psso; rep from * to last 9 sts, YO, K7, YO, sl 1, KI, psso. row 16: KI, P to last st, K1. Rep Rows 1-16 for length required, ending with a Row 16. BO. tREI Sunlit Leaves Using yam A, CO as left. Rep Rows 1-16, changing yarns in lhe following color sequence and ending with a Row 16: 2 rows in yarn A. 2 rows in yarn B. Repeat for length required. BO. NOTE: At color changes, don't break yam, instead carry yarn not in use loosely up side of work.
EES Waterbeach A lovely crochet stitch that makes a thick, textured fabric with a gently undulating ripple pattern. Use a color palette of soft shades of green as here, or be bold and work with a selection of strong, bright colors. © FOUNDATION CHAIN: multiple of 1 7 chains plus 2. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de into 4th ch from hook, [dc2tog over next 2 chs] twice, * Ich 1, hdc3tog into next ch] five times, 1 ch, ** |dc2tog over next 2 chs] six times; rep from * ending last rep at ** when 6 chs rem, [dc2tog over next 2 chs] three times, turn. ROW 2: Ch 1, 1 sc into first st and into each st and ch-1 sp to end of row excluding beg skipped ch-3, turn. ROW 3: Ch 3, sk first st, 1 de into next st, [dc2tog over next 2 sts] twice, * [ch 1, hdc3tog into next st] five times, 1 ch, ** |dc2tog over next 2 sts] six times; rep from * ending last rep al ** when 6 sts rem, |dc2tog over next 2 sts] three times, sk ch-3, turn. Rep Rows 2 and 3, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C. Repeat for length required. Fasten off yarn. ИЯЯ Avalon Using yarn A, make the foundation chain and work Row 1 as left. Rep Rows 2 and 3, changing yarns in the following color sequence: 3 rows in yarn A, 1 row in yarn B, 3 rows in yarn C, 1 row in yarn B. Repeat for length required. Fasten off yarn.
EES Uneven Chevrons A crisp ripple pattern combining lace and chevrons is worked in three ways. Wide stripes contrast with narrow ones in plain and eyelash yarns, evenly sized stripes are worked in variegated yarns, and single- row stripes add interest to a pale background. Пёр] Sorbet Using yam A, CO as left. Rep Rows 1 and 2, changing yams in the following color sequence and ending with a Row 2: 8 rows in yam A. 1 row in yam B. 1 row in yam C. Repeat for length required. BO. NOTE: At color changes, don't break main yarn, instead carry it loosely up side of work. Using yarn A, CO a multiple of 34 sts plus I. ROW 1: (RS) * KI, YO, K8, K2tog, si 1, KI. psso. K4, YO, KI, YO, K4. K’tog, si 1. KI, psso. K8, YO; rep from * to last st, KI. ROW2: KI, P to last st, KI. Rep Rows 1 and 2, changing yams in the following color sequence and ending with a Row 2: 10 rows in yam A, 2 rows in yam B. 2 rows in yarn A. 2 rows in yarn В 10 rows in yam A, 2 rows in yarn C. 2 rows in yam A. 2 rows in yarn C. Repeat for length required. BO. NOTE: At color changes, don't break main yarn, instead carry it loosely up side of work. I SPECIAL YARN KEY C variegated eyelash yam ЕЕП Pink Perfection Using yam A, CO as above. Rep Rows 1 and 2, changing yams in the following color sequence and ending with a Row 2: 6 rows in yarn A. A rows in varn В Repeat for length required. BO. NOTE: At color changes, don't break yam, instead carry yarn not in use loosely up side of work.
я © EES Brighton Rock White stripes contrast well against pink and mauve yarns, or use a dark contrast color for a different effect. Closely worked in single crochet stitches, the fabric has very little drape and makes a good, durable choice for covering all sizes of pillow. FOUNDATION CHAIN: multiple of 24 chains plus 2. Using yam A, make the required length of foundation chain. row 1; (RS) 2 sc into 2nd ch from hook, * 1 sc into each of next 11 chs, sk next ch, 1 sc into each of next 11 chs, 3 sc into next ch; rep from * to end, ending last rep with 2 sc into last ch, turn. ROW 2: Ch 1, 2 sc into first sc, * 1 sc into each of next 11 sc, sk next 2 sc, 1 sc into each of next 11 sc, 3 sc into next sc; rep from * to end, ending last rep with 2 sc into last sc, turn. ROWS 3 and 4: ch 1, 2 SC into first SC, * working in back loops only, 1 sc into each of next 11 sc, sk next 2 sc, 1 sc into each of next 11 sc, 3 sc into next sc; rep from * to end, ending last rep with 2 sc into both loops of last sc, (urn. ROW 5: Ch 1, 2 sc into first sc, * 1 sc into each of next 11 sc, sk next 2 sc, 1 sc into each of next 11 sc, 3 sc into next sc; rep from * to end, ending last rep with 2 sc into last sc, turn. Rep Rows 2-5, changing yams in the following color sequence: 2 rows in yarn A, 2 rows in yarn B, 2 rows in yam C, 2 rows in yarn B, 2 rows in yarn D, 2 rows in yarn B. Repeat for length required. Fasten off yarn. NOTE: When working Rows 3 and 4, work into back loops of all stitches except for first and last stitches of row. ifcfcj Pink Marble Using yarn A, make the foundation chain and work Row 1 as left. Rep Rows 2-5, changing yarns in the following color sequence: 3 rows in yarn A, 1 row in yarn B, 3 rows in yarn C, 1 row in yarn A, 3 rows in yarn B, 1 row in yarn C Repeat for length required. Fasten off yarn. 00" 83
STITCH COLLECTION 10 + 3 EEQ Guppy Tails This traditional lace stitch looks good worked in a narrow cotton tape yarn on big needles. When worked in a classic smooth wool yam, you can enhance the wave pattern with bands of contrasting color. CO a multiple of 10 sts plus 3. ROW 1: Kt, * KI, YO, КЗ, sl 1, K2tog, psso, КЗ, YO; rep from * to last 2 sts, ROWS 2 and 4: KI, P Ю last St, KI. ROW 3: K1, * K2, YO, K2, sl 1, K2tog, psso, K2, YO, K1; rep from * to last 2 sts, K2. ROW 5: K1, K2tog, * YO, K1, YO, KI, sl 1. K2tog, psso, KI, YO, KI, YO, sl I, K2tog, psso; rep from * to last 5 sts, KI, YO, KI.YO, K2tog, K1. row 6: K1, P to last st, K1. Rep Rows 1-6 for length required, ending with a Row 6. BO. SPECIAL YARN KEY turquoise cotton tape о • • Tetra Using yarn A, CO as left. Rep Rows 1 -6, changing yarns in the following color sequence and ending with a Row 6: 6 rows in yam A, 2 rows in yarn B. 4 rows in yarn A, 4 rows in yarn C, 2 rows in yarn A. Repeat for length required. BO. NOTE: Al color changes, don't break main yarn, instead carry it loosely up side of work.
STITCH COLLECTION 136 Bloomsbury Deep bands of openwork combine with bands of solid crochet to create this attractive stitch. Work the pattern in one strong color or choose a palette of light yet bright colors to reflect your own decorative scheme. Special abbreviations cl = cluster (keeping last loop of each de on hook, work 1 de into next de, sk next st, I de into next de, YO and draw through all 3 loops on hook), dec = decrease (keeping last loop of each de on hook, work I de into next de, sk next 3 chs, I de into next de, YO and draw through all 3 loops on hook). Make the required length of foundation chain. ROW 1: (WS) I de into 3rd ch from hook, * |ch 1, sk next ch, 1 de into next chi three times, ch I, sk next ch, [1 de, ch 3, I de] into next ch, [ch 1, sk next ch, I de into next ch| three times, ch 1, sk next ch, dec; rep from * to last 16 chs, [ch 1, sk next ch, I de into next ch] three times, ch I, sk next ch, [ I de, ch 3, 1 dc| into next ch, [ch I, sk next ch, I de into next ch] three times, ch 1, sk next ch, I de into last ch, turn. ROW 2: Ch 3, 11 de into next ch-1 sp and into next de] four limes, ❖ |2 de, ch 3, 2 de) into next ch-3 sp, |1 de into next de and into next ch-1 spl three limes, cl, |1 de into next ch-1 sp and into next del three limes; rep from * to last ch-3 sp, |2 de, ch 3, 2 del into last ch-3 sp, |1 de into next de and into next ch-1 sp) four limes. sk next de, 1 de into 3rd of beg skipped ch-2, turn. ROW 3: Ch 4, sk first 3 de, |1 de into next de, ch 1, sk next del four limes, * |1 de, ch 3, 1 dc| into next ch-3 sp, [ch 1, sk next de, I de into next del three times, ch 1, sk next de, cl, [ch 1, sk next de, I de into next de] three limes, ch 1, sk next de; rep from * to last ch-3 sp, [1 de, ch 3, I de] into last ch-3 sp, [ch 1, sk next de, 1 de into next dc| four limes, ch 1, sk next 2 de, 1 de into 3rd of ch-3, turn. ROW 4: Ch 3, sk next ch-1 sp and next de, |1 de into next ch-1 sp and into next dc| four limes, * [2 de, ch 3, 2 dc| into next ch-3 sp, [1 de into next de and into next ch-1 sp| three limes, cl, [1 de into next ch-1 sp and into next del three limes; rep from * to last ch-3 sp, [2 de, ch 3, 2 del into last ch-3 sp, [I de into next de and into next ch-1 spl four times, sk next de, 1 de into 3rd of ch-4, turn. ROWS 5-8: Ch 3, sk first 2 de, 1 de into each of next 9 de, * 1 de into next ch, ch 3, sk next ch, 1 de into next ch, I de into each of next 7 de, cl, 1 de into each of next 7 de; rep from * to last ch-3 sp, 1 de into next ch, ch 3, sk next ch, 1 de into each of next 9 de, sk next de, I de into 3rd of ch-3, turn. ROW 9: Rep Row 3. ROW 10: Ch 3, sk next ch-1 sp and next de, |1 de into next ch-1 sp and into next dc| 4 times, * [2 de, ch 3, 2 del into next ch-3 sp, |1 de into next de and into next ch-1 spl three times, cl, [1 de into next ch-1 sp and into next del three limes; rep from * to last ch-3 sp, [2 de, ch 3, 2 del into last ch-3 sp, [1 de into next de and into next ch-1 spl four limes, sk next de, I de into 3rd of ch-4, turn. 20* 19 Rep Rows 3-10 for length required. Fasten off yarn. 137 Arabesque Using yarn A, make the foundation chain and work Rows I and 2 as left. Rep Rows 3-10, changing yarns in the following color sequence: 4 rows in yarn A, *2 rows in yarn В. 1 row in yarn C, 5 rows in yarn A. Repeal from ❖ for length required. Fasten off yarn.
22*1 ffw © ЕЕЁ1 Coral Lace The large-scale lace pattern looks wonderful worked in a dark coral yam highlighted with narrow stripes of a pale color. To get a different effect, work four-row stripes ofcorals and blues in light and dark tones. Rep Rows 1-16. changing yams in the following color sequence and ending with a Row 16: 16 rows in yam A. * 2 rows in yarn B. 14 rows in yarn A. * Repeat from * to * for length required. BO. NOTE When working a yarn over between a knit stitch and a purl stitch, carry the yarn over, under, and back to the front of the work. Using yarn A, CO a multiple of 22 sts plus 1. ROW 1: (RS) KI. * PI, KI; rep from * to end. ROW 2: PI, ♦ KI, PI; rep from * to end. ROW 3: KI, * PI. K1, P2tog. |P1, KI| 3 times, YO, KI, YO. [KI. P1| 3 times, P2tog, KI, PI, KI; rep from * to end. ROW 4: PI. * KI, PI, K2, (PI. KI J twice, P5, (KI, PI| twice, K2. PI, KI, PI; rep from * lo end. ROWS: KI, * PI, KI. P2log, KI, (PI. KI J twice, YO, KI. YO, si 1, KI, psso, YO. KI, |P1, KI I twice, P2tog, KI. PI, K1; rep from * to end. ROW 6: PI. * [KI, PI | three times. KI, P7, [KI, PI| four times; rep from * to end. ROW 7: KI, * PI, KI, P2tog, |P1, KI | twice. YO. K2tog, YO. KI, YO. si 1. KI, psso, YO, |K1, PI| twice, P2tog, K1, PI, K1; rep from * to end. ROW8: PI. ♦ KI, PI, K2. PI, KI, P9. K1.P1.K2, PI, KI, PI; rep from* to end. ROW 9: KI. ♦ PI. KI. P2tOg, KI. PI. K1.YO, K2tog,YO, K1.YO. (si 1. KI, psso. YO| twice, KI, PI. KI. P2tog, KI, PI, KI; rep from * to end. ROW to: PI. ♦ KI, (PI, KI| twice, P11, (KT. PI| three times; rep from * to end. ROW 11: KI, * PI. KI. P2tog, PI. KI, |YO, K2tog| twice, YO, KI. YO. [si 1. KI, psso, YO| twice, KI, PI, P2tog, KI. PI, KI; rep from * to end. ROW 12: PI. * KI, PI, K2. P13, K2. PI, KI, PI; rep from ♦ lo end. ROW 13: KI.* PI, K1,P2tog,K1. [YO, K2tog| twice. YO, КЗ, YO. |sl 1. K1, psso, YO| twice, KI, P2tog, KI, PI, KI; rep from * to end. ROW 14: PI, * KI. PI, KI, PI5, (KI. PI | twice; rep from * to end. ROW IS: KI. * PI. KI, P2tog, |YO, K2tog| twice, YO, K5,YO, [si 1, KI, psso.YOI twice, P2tog, KI. PI, KI; rep from * to end. ROW 16: PI.* KI, PI, KI, PIS, |K1, PI | twice; rep from * to end. ПЩ] Artemis Using yarn A. CO as left. Rep Rows 1-16, changing yarns in the following color sequence and ending with a Row 16: 4 rows in yarn A, 4 rows in yarn B. 4 rows in yam C, 4 rows in yarn D. Repeat for length required. BO. •o« ►
RIPPLE PATTERNS FOR BABIES 1 Blue Lagoon (knit) Choose several shades of the same yam color to work this softly textured pattern that drapes well. 15 Pink Parfait (knit) Crisp zigzag stripes are enhanced by vertical rows of eyelets in this Stockinette and garter stitch pattern. 48 Pink and While (crochet) Worked in two colors of baby yarn, this pattern would make a beautifully soft, yet substantial baby blanket. 94 Regatta (crochet) This attractive arrangement of double crochet blocks looks equally attractive worked in one color or in stripes. ALTERNATIVE PATTERNS TO USE Snuggle Blanket Stitch pattern Puff Lace, page 34 Needles: Pair of size 5 single-pointed needles (4mm) or size needed to achieve gauge. Pattern repeat: Multiple of 10 stitches plus 1. Gauge: 22 sis and 28 rows lo 4in (10cm) over pattern. Size and colors: The small blanket in lhe photograph is worked on two colors, pale green and cream. The blanket measures 19in x 27in (48cm x 69cm) after blocking. Yarn requirements: 520 yds (475m) of Jaeger Extra Fine Merino DK (or double knitting weight yarn with 137 yds (125m) per I 7«oz (50g) ball) in 990 balm (A), 92 yds (84m) of King Cole Anti-Tickle Merino Blend DK (or double knitting weight yarn with 123 yds d 12m) per 1 ‘Дог (50g) ball) in 46 cream (B). Working the snuggle blanket Using yarn A, CO the required number of stitches for 10 pattern repeats. Follow the stitch pattern on page 34. changing yarns in lhe following color sequence: I I rows of yarn A, • 2 rows of yarn B, 12 rows of yarn A. Repeal from * until you have worked 12 pattern repeats in total. Repeat Rows 1-10 once more, ending with a Row 10. BO. Finishing the snuggle blanket Sew in all lhe ends. Block and allow to dry. 87
Ripple patterns for babies The most popular crafted gift for a new baby is a knitted or crocheted afghan, often one made in pastel colors. Ripple stitch patterns work well on a small scale to make pram and col covers, snuggle blankets, and lacy shawls. Knit or crochet? Both techniques work well, although knitting is probably the better technique of the two to use since knitted fabric has a better drape than one worked in crochet. Always make a gauge swatch first; this will let you check the drape of the fabric and the effect of your chosen colors as well as helping you make sure that the finished item will be the right size. Choosing the stitch pattern Choose a stitch pattern that is fairly closely worked to make pram and cot covers and small blankets for baby to snuggle into. Lighter, lacy patterns are good for making shawls, but avoid those with large holes as these can catch and snag on tiny fingers. Suggested stitches are shown on page 87. Yarns for babies Many yams are marketed as suitable for making baby items. They may be spun from pure wool, acrylic, cotton, or a blend of two or more of these fibers. Pure wool baby yarns are specially treated to be soft, non-scratchy, and machine-washable, but many crafters prefer lo make baby items from acrylic because it is inexpensive and easy to care for. Cotton yarns are a good choice for babies living in warm climates as they are cooler in use than both wool and acrylic yarns. Combining colors and yarns Traditional pastel colors are a good, although rather safe choice for making baby items. As well as the usual pink and blue shades plus white and cream, you can choose from pastel greens, turquoises, mauves, and yellows. Many ranges of baby yarns include stronger colors such as purple and orange as well as pretty variegated yarns. The snuggle blanket in the photograph is made from pure wool yarn in a lovely soft green shade contrasted with pale cream, but it would look equally attractive worked in hot, strong colors such as bright pink and
STITCH COLLECTION FOUNDATION CHAIN: multiple of 17 chains plus 2. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de into 4th ch from hook, |dc2tog over next 2 chs] twice, ch 1, [1 de into next ch, ch 1] five times, * [dc2tog over next 2 chs] six times, ch 1, (1 de into next ch, ch 1] five times; rep from * to last 6 chs, |dc2tog over next 2 chs] three times, turn. ROW 2: Ch 3, sk first st, 1 de into next St, [dc2tog over next st and next ch-1 sp] twice, ch 1, 1 de into next de, ch 1, |1 de into next ch-1 sp, ch 1, 1 de into next de, ch 11 twice, * ]dc2tog over next ch-1 sp and next st] twice, [dc2tog over next 2 sts] twice, [dc2tog over next st and next ch-1 sp] twice, ch 1, 1 de into next de, ch 1, [1 de into next ch-1 sp, ch 1, 1 de into next de, ch 1 ] twice; rep from $ to last 2 ch-1 sps, ]dc2tog over next ch-1 sp and next st] twice, dc2tog ЕЕЗ Shades of Coral Soft crochet waves look fabulous worked in stripes of three graduating colors. Alternatively, work narrow bands of different shades of coral and blue yarns to contrast with a plain background. over next 2 sts, turn, leaving beg skipped ch-3 unworked. row 3: Ch 3, sk first st, 1 de into next st, ]dc2tog over next ch-1 sp and next st] twice, ch 1, 1 de into next de, ch 1, [1 de into next ch-1 sp, ch 1, 1 de into next de, ch 11 twice, * ]dc2tog over next ch-1 sp and next st] twice, |dc2tog over next 2 sts] twice, (dc2tog over next st and next ch-1 sp] twice, ch 1, 1 de into next de, ch 1, |1 de into next ch-1 sp, ch 1, 1 de into next de, ch 1] twice; rep from * to last 2 ch-1 sps, |dc2tog over next ch-1 sp and next st] twice, dc2tog over next 2 sts, turn, leaving turning ch-3 unworked. Rep Row 3, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C. Repeat for length required. Fasten off yarn. 1И1 Coral Seas Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yarns in the following color sequence: 4 rows in yarn A, 1 row in yarn B, 1 row in yarn C, 2 rows in yarn A, 1 row in yarn D, 1 row in yarn E. Repeat for length required. Fasten off yarn. *••00
STITCH COLLECTION 18»1 EES Happy Holidays Work this stitch in dark red and green yams emphasized with white, or add holiday sparkle to a dark-colored yarn with metallic yarns. Many metal lies are fine in weight so use two or more strands to match up with the weight of your main yarn. Using yam A, CO a multiple of 18 sts plus 1. ROW 1: (RS) KI. * |K2tog| three times, |YO, KI | five times, YO, |K2tog| three times, KI; rep from * to end. ROWS 2 and 3: K. ROW 4: KI, P to last St, KI. 12 rows in yam A. 12 rows in yam B. 4 rows in yarn A, 12 rows in yam C, 12 rows in yarn A. Repeat for length required. BO. Rep Rows 1-4, changing yarns in the following color sequence and ending with a Row 4: « о© Holiday Garlands Using yam A. CO as left and work Rows 1-4. Rep Rows 1-4 for length required, changing yams in the following color sequence and ending with a Row 4: 10 rows in yam A. 2 rows in yarn В 10 rows in yarn A, 2 rows in yam C. Repeat for length required. BO. NOTES: Yarns В and C are used double throughout. Don't break main yam at color changes, instead carry it loosely up the side of the work.
STITCH COLLECTION EEQ Santa’s Stripes The wave pattern of this stitch is highlighted with single rows of fun fur yarn to make a great holiday afghan. You can also work the stitch in a more traditional way using red, white, and two shades of green yarn. Я © FOUNDATION CHAIN: multiple of 16 chains plus 3. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de into 4th ch from hook, * 1 de into each of next 5 chs, |dc2tog| twice, I de into each of next 5 chs, |2 de into next ch| twice; rep from * ending last rep with 2 de into last ch, turn. row 2: Ch 3, 1 de into same st, * 1 de into each of next 5 de, |dc2log| twice, 1 de into each of next 5 de, |2 de into next st| twice; rep from ’1= ending last rep with 2 de into 3rd of beg skipped ch-3, turn. ROW 3: Ch 3, 1 de into same st, * 1 de into each of next 5 de, |dc2tog| twice, 1 de into each of next 5 de, |2 de into next stl twice; rep from * ending last rep with 2 de into 3rd of ch-3, turn. Rep Row 3, changing yarns in the following color sequence: 5 rows in yarn A. 1 row in yarn B, 5 rows in yarn C, I row in yam B. 4 rows in yarn A. Repeat for length required. Fasten off yarn. NOTE: After completing Row I, work into only the back loops of all stitches. SPECIAL YARN KEY В fun fur yam O0OO EES Holiday Waves Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Row 3, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn В 2 rows in yarn C, 2 rows in yarn D, 2 rows in yarn C, 2 rows in yarn B. Repeat for length required. Fasten off yarn. 91
18*1 ООО КЕШ Speedway Bands of rib contrast against areas of stockinette stitch to make this stylish chevron pattern. Narrow stripes of deep mauve and black currant show up well against a blue background, or use space-dyed ribbon yarn as your contrast. Special abbreviation inc = increase one stitch by lifting horizontal thread between last stitch worked and next stitch and knitting into the back of it. Using yarn A, CO a multiple of 18 sts plus 1. ROW 1: (RS) ♦ KI, inc. K5, K2tog, Pl, KI tbl, PI, sl 1, KI, psso, K5, inc; rep from * lo last st, KI. ROW 2: KI, P7, KI. PI tbl, * KI, P15, KI, Pl tbl; rep from * to last 9 sts, KI, P7, KI. 10 rows in yarn A. 2 rows in yam B, 2 rows in yam A, 2 rows in yam C, 10 rows in yarn A, 2 rows in yam C, 2 rows in yam A, 2 rows in yam B. Repeat for length required. BO. NOTE.- Al color changes, don't break main yam, instead carry it loosely up side of work. EEQ Wood Pigeon : Using yam A, CO as left. i Rep Rows 1 and 2. changing yams in • the following color sequence and : ending with a Row 2: 8 rows in yarn A, 6 rows in yam В 4 rows in yam A. 6 rows in yam В ; Repeat for length required. i во. SPECIAL YARN KEY A mauve aran yarn Rep Rows 1 and 2, changing yams in the following color sequence and ending with a Row 2: В variegated ribbon
STITCH COLLECTION Waterfal 24 >5 a О c|QO Cool, evenly toned colors work well for this crochet pattern that features bands of openwork and solid crochet. Narrow stripes of strong, cool-toned colors also show up well against a plain pale Rep Rows 4-6. changing yarns in the following color sequence: I row in yarn A, * 1 row in yarn B. 2 rows in yarn A. 1 row in yarn C, 2 rows in yarn A. 1 row in yarn D 2 rows in yarn A, 1 row in yarn E. 2 rows in yarn A. Repeal from * tor length required. Fasten off yarn. blue background. 149 Twilight FOUNDATION CHAIN: multiple of 24 chains plus 5. Using yarn A, make (he required length of foundation chain. ROW 1: (RS) Dc3tog over 4th, 5th and 6th chs from hook, 1 de into each of next 9 chs, 5 de into next ch, 1 de into each of next 9 chs, * de5log over next 5 chs, 1 de into each of next 9 chs, 5 de into next ch, 1 de into each of next 9 chs; rep from * to last 4 chs, dc3tog over next 3 chs, I de into last ch, turn. ROW 2: Ch 3, sk first st, dc.3tog, I de into each of next 9 de, 5 de into next de, 1 de into each of next 9 de, ❖ dc5log, I de into each of next 9 de, 5 de into next de, I de into each of next 9dc; rep from * to last 4 sis, dc3tog, I de into 3rd of beg skipped ch-3, turn. ROW 3: Ch 3, sk first st, dc3log, ch 1, |sk next st, 1 de into next st, ch 1] four limes, sk next st, 5 de into next st, ch I, Isk next st, 1 de into next st. ch 1 ] four limes, * sk next st, dc5tog, ch I, [sk next st, 1 de into next st, ch 11 four times, sk next st, 5 de into next st, ch 1, Isk next st, 1 de into next st, ch 11 four times; rep from ❖ lo last 5 sts, sk next st, dc3tog, 1 de into 3rd of ch-3, turn. ROW' 4: Ch 3, sk first st, working into each st and into each ch, de 3log, I de into each of next 9 sis, 5 de into * dc5tog, 1 de into each of next 9 de. 5 de into next st, I de into each of next 9 de; rep from * to last 4 sts, dc3tog, 1 de into 3rd of ch-3, turn. ROW 5: Rep Row 2. ROW 6: Ch 3, sk first st, dc3tog, ch 1, Isk next st, 1 de into next st, ch 11 four times, sk next st, 5 de into next st, ch 1, [sk next st, 1 de into next st, ch I) four times, ❖ sk next st, dc5log, ch I. |sk next st, 1 de into next st, ch 11 four times, sk next st. 5 de into next st, ch 1, [sk next st, 1 de into next st, ch 11 four times; rep from * lo last 5 sts, sk next st, dc3tog, 1 de into 3rd of ch-3, turn. 4 Using yarn A. make lhe foundation chain and work Rows 1-3 as left. Rep Rows 4-6. changing yarns in the following color sequence: 3 rows in yarn A. 3 rows in yarn B. 3 rows in yarn C, 3 rows in yarn B. 3 rows in yarn A. Repeat from * for length required. Fasten off yarn. 93
STITCH COLLECTION 9 + 3 150 Gentle Waves This stitch produces a soft, small-scale wave pattern that looks attractive worked in deep bands of strongly contrasting yarns divided by narrow white stripes. Alternatively, combine a plain and multicolored yarn. Using yarn A, CO a multiple of 9 sts plus 3. ROW 1: (RS) K2, * YO, sl 1, K1, psso, K4, K2tog, YO, K1; rep from * to last st, KI. row 2: K1, P2, * Кб, P3; rep from * to last 9 sts, K6, P2, K1. ROW 3: КЗ, * YO, sl 1, KI, psso, K2, K2log, YO, КЗ; rep from ♦ lo encl. ROW 4: KI, P3, * K4, P5; rep from ❖ to last 8 sts, K4, P3, KI. ROW 5: K4, * YO. sl I, КI, psso, K2log, YO, K5: rep from * to last 8 sis, YO, sl 1, KI, psso, K2tog, YO, K4. ROW 6: KI, P4, * K2, P7; rep from * to last 7 sts, K2, P3, KI. Rep Rows 1-6, changing yarns in lhe following color sequence and ending with a Row 6: 12 rows in yarn A, 2 rows in yarn B, 8 rows in yarn C, 2 rows in yarn B. Repeat for length required. BO. NOTE: Al color changes, don't break main yarn, instead carry it loosely up side of work. SPECIAL YARN KEY В multicolored velvet tape 151 Orlando Using yarn A, CO as left. Rep Rows I-6, changing yarns in the following color sequence and ending with a Row 6: 6 rows in varn A. 6 rows in yarn B. Repeat for length required. BO. note-. Al color changes, don’t break yarn, instead carry yarn not in use loosely up side of work.
STITCH COLLECTIOI' 19 + 3 EES Piazza Worked in fuchsia pink, white, and a multicolored yarn, this stitch creates a bright, lively fabric. For a subtler, more stylish look, choose a warm palette of rich, warm amber and yellow ocher yarn. FOUNDATION CHAIN: multiple of 19 chains plus 3. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de into 3rd ch from hook, ch 1, [sk next ch, 1 de into next ch, ch 11 three times, sk next ch, 3 de into next ch, ch 3, 3 de into next ch, ch 1, [sk next ch, 1 de into next ch, ch 11 three times, * sk next ch, dc3tog over next 3 chs, ch 1, |sk next ch, 1 de into next ch, ch 11 three times, sk next ch, 3 de into next ch, ch 3, 3 de into next ch, ch 1, [sk next ch, 1 de into next ch, ch 11 three times; rep from * to last 4 chs, |sk next ch, 1 de into next ch] twice, turn. ROW 2: Ch 3, sk first 2 de, |1 de into next de, ch 11 four times, sk next 2 de, 13 de, ch 3, 3 de] into next ch-3 sp, ch 1, sk next 2 de, [1 de into next de, ch 11 three times, ❖ dc3tog over next de, top of next dc3tog and next de, ch 1, |1 de into next de, ch 11 three times, sk next 2 de, |3 de, ch 3, 3 del into next ch-3 sp, ch 1, sk next 2 de, |1 de into next de, ch 11 three times; rep from * to last 2 de, 1 de into each of last 2 de, turn. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 1 row in yarn В 1 row in yarn C, 1 row in yarn В Repeat for length required. Fasten off yarn. SPECIAL YARN KEY C multicolored DK yarn UsiEl Russian Amber Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn B. Repeat for length required. Fasten off yarn.
STITCH COLLECTION 34 + 1 ВЕЗ Rainforest This delightful traditional stitch with good drape is challenging to knit, hut the end result is well worth the effort, whether worked in colorful stripes or using the same yarn throughout. Special abbreviation inc = increase one stitch by lifting horizontal thread between last stitch worked and next stitch and knitting into the back of it. Using yam A, CO a multiple of 34 sts plus 1. ROW 1 and every alt row: (WS) KI, P to last st, K1. row 2: KI, * inc, sl 1. K1, psso, K4, K2tog, КЗ, inc. K2, inc, КЗ, sl I, K1, psso, K4, K2tog, inc, K2; rep from *, ending last rep with K1 instead of K2. ROW 4: K1, * inc, KI, sl 1, K1, psso, K2, K2tog, K4, inc, K2, inc, K4, sl 1, K1, psso, K2, K2tog, K1, inc, K2; rep from *, ending last rep with KI instead of K2. ROW 6: K1, * inc, K2, sl 1, K1, psso, K2tog, K5, inc, K2, inc, K5, sl 1, Kt, psso, K2tog, K2, inc, K2; rep from *, ending last rep with K1 instead of K2. ROW 8: KI, * inc, КЗ. sl 1, K1, psso, K4, K2tog, inc, K2, inc, sl 1, KI, psso, K4, K2tog, КЗ, inc, K2; rep from *, ending last rep with K1 instead of K2. row 10: KI. * inc, K4, sl 1, K1, psso, K2, K2tog, KI, inc, K2, inc, K1, sl 1, KI, psso, K2, K2log, K4, inc, K2; rep from *, ending last rep with K1 instead of K2. ROW 12: K1, * inc, K5. sl 1, KI, psso, K2tog, |K2, inc] twice, K2, sl 1, KI, psso, K2tog, K5, inc, K2; rep from *, ending last rep with KI instead of K2. Rep Rows 1-12, changing yarns in the following color sequence and ending with a Row 12: 6 rows in yarn A, 4 rows in yarn B. 2 rows in yarn C, 6 rows in yarn A, 4 rows in yarn B, 2 rows in yarn D, Repeat for length required. BO. tklsi Butterfly Wings CO as left. Rep Rows 1-12 for length required, ending with a Row 12. BO. e в G D
STITCH COLLECTION FOUNDATION CHAIN: multiple of 12 chains plus 11. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de into 3rd ch from hook, 1 de into each of next 3 chs; * ch 2, 1 de into each of next 5 chs, sk next 2 chs, 1 de into each of next 5 chs; rep from * to last 5 chs, ch 2, 1 de into each of last 5 chs, turn. ROW 2: Ch 3, sk first 2 de, 1 de into each of next 3 de, * [1 de, ch 1, dcStog, ch 1, 1 dc| into next ch-2 sp, 1 de into each of next 4 de, sk next 2 de, 1 de into each of next 4 de; rep from * to last ch-2 sp, |1 de, ch 1, dc5tog, ch 1, 1 del into last ch-2 sp, 1 de into each of next 3 de, sk next de, 1 de into 2nd of beg skipped ch-2, turn. ROW 3: Ch 3, sk first 2 de, 1 de into each of next 3 de, 1 de into next ch-1 sp, * ch 2, 1 de into next ch-1 sp, 1 de into each of next 4 de, sk next 2 [S3 Cluster Ripple Bold stripes of double crochet stitches and clusters lend themselves to different color combinations. Choose a variegated two-tone yarn, then choose the remaining colors to match the two tones. For a simpler, more restful look, use a cool palette of blue and green. de, 1 de into each of next 4 de, 1 de into next ch-1 sp; rep from * to last ch-1 sp, ch 2, 1 de into last ch-1 sp, 1 de into each of next 3 de, sk next de, 1 de into 3rd of ch-3, turn. ROW 4: Ch 3, sk first 2 de, 1 de into each of next 3 de, * 11 de, ch 1, dcStog, ch 1, I dc| into next ch-2 sp, 1 de into each of next 4 de, sk next 2 de, 1 de into each of next 4 de; rep from * to last ch-2 sp, |1 de, eh 1, dcStog, ch 1, 1 dc| into last ch-2 sp, 1 de into each of next 3 de, sk next de, 1 de into 3rd of ch-3, turn. Rep Rows 3 and 4, changing yarns in the following color sequence: 3 rows in yarn A, 1 row in yarn B, 1 row in yarn C, 3 rows in yarn D, 1 row in yarn C, 1 row in yarn B, 3 rows in yarn A, 1 row in yarn C, 1 row in yarn D, 3 rows in yarn B, 1 row in yarn D, 1 row in yarn C. Repeat for length required. Fasten off yarn. © 8ЕЯ Scarborough Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Rows 3 and 4, changing yarns in the following color sequence: 6 rows in yarn A, 4 rows in yarn B. Repeal for length required. Fasten off yarn. 97
STITCH COLLECTION 14*3 EE3 Souvenir This pattern has lots of texture created by bands of reverse stockinette stitch and garter stitch. It looks good worked in two contrasting colors or in a softer palette of mauve and pale turquoise. Using yarn A, CO a multiple of 14 sts plus 3. ROW 1: (RS) K2, ♦ YO. K5, K3tog, K5. YO, KI; rep from ♦ to last st. KI. ROW2: KI, Pto last st, KI. ROWS 3 and 4: K. ROWS 5 and 9: Rep Row 1. ROWS b and 10: Rep Row 2. ROWS 7, 8, 11 and 14: K. ROWS 12, 13 and 15: KI, P to last Sl, KI. ROW tfc K. Rep Rows 1-16, changing yams in the following color sequence and ending with a Row 16: 11 rows in yam A, 5 rows in yarn B, 11 rows in yarn A, 5 rows in yarn C. Repeat for length required. BO. Anemone Using yam A, CO as left. Rep Rows 1 -16. changing yams in the following color sequence and ending with a Row 16: 11 rows in yarn A. 5 rows in yarn B. Repeat for length required. BO.
STITCH COLLECTION 13 ШЗ Gary’s Ripple This very easy stitch pattern is great for a beginner to crochet. It's also good for creating lots of different effects by simply varying the width of the stripes and changing yarn colors and textures. n=n Plain Jane FOUNDATION CHAIN: multiple of 13 chains. Using yam A, make the required length of foundation chain. ROW i: (RS) 1 de into 4th ch from hook, 1 de into each of next 3 chs, * 3 de into next ch, 1 de into each of next 5 chs, sk next 2 chs, 1 de into each of next 5 chs, rep from * to last 6 chs, 3 de into next ch, 1 de into each of next 5 chs, turn. ROW 2: SI st into 2nd de, ch 3, 1 de into each of next 4 de, * 3 de into next de, 1 de into each of next 5 de, sk next 2 de, 1 de into each of next 5 de, rep from * to last 6 sts, 3dc into next de, 1 de into each of next 5 de, turn. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C. Repeal for length required. Fasten off yarn. • I SPECIAL YARN KEY turquoise cotton tape Make the foundation chain and work Row I as left. Rep Row 2 for length required. Fasten off yam. Pretty in Pink Using yarn A, make the foundation chain and work Row 1 as above. Rep Row 2, changing yarns in the following color sequence: 2 rows in yarn A. 2 rows in yarn B, 2 rows in yarn C, 2 rows in yarn A. 2 rows in yarn D, 2 rows in yarn C. Repeal for length required. Fasten off yam. ф| SPECIAL YARN KEY pale pink velvet yarn 99
* ееоо ЕЕЁ] Madeira Sunset The traditional lace pattern from Madeira looks gorgeous worked in stripes of five graduating colors. Begin with the lightest shade from your palette and end with the darkest. For a simpler result, choose white and a neutral shade and work in deep stripes. ПЯ?! Cascade Using yarn A, CO a multiple of 20 sts plus 5. ROWS 1, 4, 6, 8,10, 12, 14, 16, and 18: (RS) K2, P to last 2 sts, K2. ROW 2: K. ROW 3: K2, ♦ KI, YO, K8, P3tog, K8, YO; rep from ♦ to last 3 sts, КЗ. ROW 5: K2, * K2, YO, K7, P3tog, K7, YO, KI; rep from * to last 3 sts, КЗ. ROW 7: K2, K2 tog, * YO, KI, YO, K6, P3tog, K6, YO, KI, YO, sl 1, K2tog, psso; rep from * to last 21 sts, YO, KI, YO, K6, P3tog, K6, YO, KI, YO, K2tog tbl, K2. ROW 9: K2, * K4, YO, K5, P3tog, K5, YO, КЗ; rep from * to last 3 sts, КЗ. ROW 11: K2, * K1, YO, sl 1, K2tog, psso, YO, K1, YO. K4, P3tog, K4, YO, K1, YO, sl 1, K2tog, psso, YO; rep from * to last 3 sts, КЗ. ROW 13: K2, * K6, YO, КЗ, P3tog, КЗ, YO, K5; rep from * to last 3 sts, КЗ. —* УГ) KI YO. sl 1, K2tog, psso, YO, KI, YO, K2, P3tog, K2, YO, K1, YO, sl 1, K2tog, psso, YO, K1, YO, sl 1, K2log, psso; rep from * to last 21 sts, YO, K1, YO, sl 1, K2tog, psso, YO, KI, YO, K2, P3tog, K2. YO, KI. YO, sl 1, K2tog, psso. YO, K1, YO, K2tog tbl, K2. ROW 17: K2. ♦ K8, YO, KI, P3tog, KI, YO, K7; rep from * to last 3 sts, КЗ. ROW 19: K2, * K1, |YO, sl 1, K2tog, psso. YO. KI | twice, YO, P3tog, YO, [KI, YO, sl 1, K2tog, psso, YO] twice; rep from * to last 3 sts, КЗ. ROW 20: K. Rep Rows 1-20, changing yams in the following color sequence and ending with a Row 20: 4 rows in yam A, 4 rows in yarn B, 4 rows in yarn C, 4 rows in yam D 4 rows in yam E. Repeat for length required. BO. Using yarn A, CO as left. Rep Rows 1-20, changing yams in the following color sequence and ending with a Row 20: 20 rows in yam A, 20 rows in yarn В Repeat for length required. BO.
STITCH COLLECTIOI' A Q0 D 13 + 4 EES Bright Shells An intricate crochet shell pattern looks effective worked in stripes of four colors shading from dark to light. The same pattern looks just as attractive when worked in a single yarn color. FOUNDATION CHAIN: multiple of 13 chains plus 4. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 1 de into 4th ch from hook, 1 de into each of next 3 chs, [dc2tog over next 2 chs] three times, 1 de into each of next 3 chs, * 3 de into next ch, 1 de into each of next 3 chs, [dc2tog over next 2 chs] three times, 1 de into each of next 3 chs; rep from * to last ch, 2 de into last ch, turn. ROW 2: Ch 3, 2 de into first de, ch 2, sk next 3 de, 1 sc into next de, ch 4, sk next 3 de, 1 sc into next de, ch 2, * sk next 3 de, 5 de into next de, ch 2, sk next 3 de, 1 sc into next de, ch 4, sk next 3 de, 1 sc into next de, ch 2; rep from * to last 3 de, sk last 3 de, 3 de into beg skipped ch-3, turn. row 3: Ch 3, 1 de into first de, 2 de into next de, 1 de into next de, ch 2, sk next ch-2 sp, 1 sc into next ch-4 sp, ch 2, sk next sc, 1 de into next de, 2 de into next de, * 3 de into next de, 2 de into next de, 1 de into next de, ch 2, sk next ch-2 sp, 1 sc into next ch-4 sp, ch 2, sk next sc, 1 de into next de, 2 de into next de; rep from * to turning ch, 2 de into 3rd of ch-3, turn. ROW 4: Ch 3, |2 de into next de, 1 de into next de] twice, sk next sc, 1 de into next de, * |2 de into next de, 1 de into next del four times, sk next sc, 1 de into next de; rep from 4= to last 3 de, 2 de into next de, 1 de into next de, 2 de into last de, 1 de into 3rd of ch-3, turn. row 5: Ch 3, 1 de into each of first 4 de, [dc2tog over next 2 de] three times, 1 de into each of next 3 de, * 3 de into next de, 1 de into each of next 3 de, (dc2tog over next 2 de] three times, 1 de into each of next 3 de; rep from * to turning ch, 2 de into 3rd of ch-3, turn. ROW 6: Ch 3, 2 de into first de, ch 2, sk next 3 de, 1 sc into next de, ch 4, sk next 3 de, 1 sc into next de, ch 2, * sk next 3 de, 5 de into next de, ch 2, sk next 3 de, 1 sc into next de, ch 4, sk next 3 de, 1 sc into next de, ch 2; rep from * to last 3 de, sk last 3 de, 3 de into 3rd of ch-3, turn. Rep Rows 3-6, changing yarns in the following color sequence: 1 row in yarn A, 1 row in yarn B, 1 row in yarn C, 1 row in yarn D. Repeat for length required. Fasten off yarn. EE3 Norfolk Shells Make the foundation chain and work Rows 1 and 2 as left. Rep Rows 3-6 for length required. Fasten off yarn.
STITCH COLLECTION 14.2 EES Bright Ridges Worked in bright colors, narrow garter stitch ridges are thrown into strong relief against a plain dark background. This stitch also looks good when the stripe depths are changed, then the ridged stripes appear to sink into the paler background. Special abbreviation inc = increase by knitting into front and back of next stitch. Using yam A, CO a multiple of 14 sts plus 2. row i: (WS) KI, Pio Iasi st, KI. ROW 2: KI, inc in next si, K4, si 1. KI, psso, K2log, K4. * inc in each of next 2 sts, K4, si 1, KI, psso, K2tog, K4; rep from * to last 2 sts, inc in next st, KI. ROW 3: Rep Row 1. ROW 4: Rep Row 2. ROWS 5 and 6: K. ROW 7: Rep Row 1. row 8: KI, inc in next st. K4. si 1. KJ, psso, K2tog, K4. * inc in each of next 2 sts, K4, si 1. KI, psso, K2tog, K4; rep from * to last 2 sts, inc in о«о ° о next st, KI. Rep Rows 1-8, changing yarns in the following color sequence and ending with a Row 8: 3 rows in yam A, * 2 rows in yarn В 6 rows in yarn A, 2 rows in yarn C, 6 rows in yam A. 2 rows in yam D 6 rows in yarn A. 2 rows in yam E, 6 rows in yam A. Repeat from * for length required. BO. NOTE: At color changes, don't break main yam. instead carry it loosely up side of work. ET=T=I Nocturne Using yarn A, CO as left. Rep Rows 1-8, changing yarns in the following color sequence and ending with a Row 8: 2 rows in yam A. 4 rows in yam B. 2 rows in yarn A. Repeat for length required. BO. NOTE: Don't break yam at color changes, instead carry lhe yam not in use loosely up the side of the work.
STITCH COLLECTION О В© о FOUNDATION CHAIN: multiple of 14 chains plus 3. Using yarn A, make the required length of foundation chain. row i: (RS) 2 de into 4th ch from hook, 1 de into each of next 3 chs, |dc3tog over nexl 3 chs| twice, 1 de into each of next 3 chs, * 3 de into each of next 2 chs, 1 de into each of next 3 chs, |dc3tog over next 3 chs| twice, 1 de into each of next 3 chs; rep from * to last ch, 3 de into last ch, turn. ROW 2: Ch 3, 2 de into first de, I de into each of next 3 de, dc3tog twice, I de into each of next 3 de, * 3 de into each of nexl 2 de, 1 de into each of next 3 de, dc3log twice. 1 de into each of next 3 de; rep from * to beg skipped chs, 3 de into 3rd of beg skipped ch-3, turn. EES Malibu A gently undulating ripple pattern lends itself well to different color treatments. In the first, three contrasting colors are arranged to make a band across a plain deep blue background: in the second, two toning shades of yarn are used to blend into each other. © ROW J: Ch 3, 2 de into first de. I de into each of next 3 de, dc3log twice, 1 de into each of next 3 de. * 3 de into each of next 2 de. 1 de into each of next 3 de, dc3tog twice. 1 de into each of next 3 de; rep from * to turning ch. 3 de into 3rd of ch-3, turn. ПЛ Big V\^ves i Using yarn A, make the foundation • chain and work Rows 1 and 2 as left. ; Rep Row 3. changing yams in lhe : following color sequence: 3 rows in yam A. 3 rows in yam B. : Repeat for length required. • Fasten off yam. Rep Row 3. changing yams in the following color sequence: 6 rows in yam A, 2 rows in yarn B, I row in yarn C, 1 row in yarn D. Repeat for length required. Fasten off yarn. 103
STITCH COLLECTION © 17 EES Forest Ripples This unusual ripple pattern combines bands of reverse stockinette stitch with bands of elongated stitches with a lacy appearance. Choose strongly contrasting colors or add a two-tone eyelash yarn for texture. Using yarn A, CO a multiple of 17 sts. ROW 1: (RS) KI, P to last sl, KI. ROW 2: K. row 3: Rep Row 1. ROW 4: * P2tog, Pl3, P2tog; rep from * to end. ROWS: ♦ SI 1. KI, psso. KI 1. K2tog; rep from * to end. ROW 6: K. row 7: * КЗ, |YO twice, KI ] seven times, YO twice, КЗ; rep from * to end. row 8: * КЗ. |K first YO. drop next YO, KI | seven times, К first YO, drop next YO, КЗ; rep from * to end. ROW 9:* SI 1. KI, psso, K17. K2tog; ref) from * to end. ROW to: * P2tog, Pl 5, P2tog; rep from * to end. Rep Rows 1-10, changing yarns in the following color sequence and ending with a Row 10: 2 rows in yarn B. 8 rows in yarn A. Repeal for length required. BO. NOTE: At color changes, don't break main yam, instead carry it loosely up side of work. ф SPECIAL YARN KEY В two-tone eyelash yarn □live Grove Using yarn A, CO as left. Rep Rows 1-10, changing yarns in the following color sequence and ending with a Row 10: 4 rows in yam A, * 4 rows in yam B. 6 rows in yam A, 4 rows in yam C. 6 rows in yarn A. Repeat from * for length required. BO.
Stash Afghan Stitch pattern: Gary's Ripple, page 99 Hook: Size F (4mm) or size needed to achieve gauge. Foundation chain: Multiple of 13 chains. Gauge: 20 sts and 8 rows lo 4in (10cm) over pattern after blocking. Size and colors: The afghan in the photograph was worked in a selection of yarns based around a color palette of blue and green. Gray and purple yarns were also incorporated to contrast with the main colors. The afghan measures 50in x 53in (127cm x 135cm) and is finished off with several rows of single crochet edging. Yarn requirements: Double knitting weight wool or wool/acrylic mix yarn and a similar quantity of mohair or brushed yarns in the same weight. One pattern row requires approximately 25 yds (22.9m) of yarn. Working the stash afghan Make lhe required length of foundation chain to work 19 pattern repeats. Follow the stitch pattern on page 99, beginning with 3 rows in a smooth yarn. Alternate single rows of textured and smooth yarns until you have worked lhe desired length and end with 3 rows worked in a smooth yarn ALTERNATIVE DESIGNS TO USE Using yarns from your stash The afghan in the photograph was worked from stash yarns in alternate rows of smooth wool contrasted with fluffy mohair and brushed yarns. All 8 Soft Waves (crochet) МММЬ ^riPes undulating waves make an attractive alternative to the more usual zigzag afghan patterns. lhe yarns are of a similar weight and the yarn colors and textures change on every row. When using up short lengths of yarn, you may need to work one or more rows using two, three, or more colors. In this case, • 33 Smartie (crochet) Add surface texture lo your afghan by using this pretty, easy-to-work ridged pattern. knot the yarn ends together as you work, then undo the knots and darn in the ends securely when finishing the afghan. • 50 Marmalade (knit) Ridges of textured and lace stitches make up this attractive pattern, which looks good worked in more than one type of yarn. Finishing the stash afghan Sew in all lhe ends. Work several rows of single crochet edging round the afghan using a different color of smooth yarn to work each row. Finish off with a row of crab stitch edging. 117 Dimple Shale (knit) This softly waving pattern will add a delicate, lacy touch to your afghan and it looks best worked in smooth yarns. 1DR
Ripple patterns for afghans Ripple stitch patterns are perennial favorites for making afghans as they are fun to knit or crochet and grow quickly in most weights of yarn. Make afghans in different sizes for different uses; make a small afghan for throwing over the back of a chair, a medium-sized one to snuggle into while reading or watching television, and a large one to cover a bed. Knit or crochet? Crochet is the most popular technique to use when making an afghan since there is no limit to the size you can make when working it all in one piece. When knitting an afghan you'll need to work back and forth on a long circular needle instead of using a pair of single- point needles, which will be too short to accommodate the large number of stitches required. You can, if you prefer, knit an afghan in several narrow strips and sew them together. Choosing the stitch pattern You can use most of the stitch patterns in the book when creating an afghan, although some of the lighter, lacy patterns such as Guppy Tails on page 84 will look best worked in fine yarns. Suggested stitches are shown on page 105. Combining colors and yarns Almost any weight of yarn is suitable for making an afghan, although thicker yarns will work up more quickly than fine ones and will give a much more substantial result. Pure wool is a popular and warm choice but many crafters prefer to use an acrylic or wool/acrylic mix yarn on the grounds of price and washability. Choose new yarns for your afghan or mix and match all the odd balls in your yarn stash for a truly personal result. You can select yarns using a color scheme of two or more contrasting or coordinating colors, or simply work with random colors, placing them at will.
STITCH COLLECTION "ОО ESI Green Gables Sharply pointed, crisp chevrons worked in single crochet make this uneven chevron pattern. Simple to work, take care to make the correct number of stitches between the peaks and troughs. FOUNDATION CHAIN: multiple Of 36 chains plus 2. Using yarn A, make the required length of foundation chain. ROW i: (RS) 2 sc into 2nd ch from hook. * I sc into each of next 11 chs. sk next ch, 1 sc into each of next 5 chs, 3 sc into next ch, 1 sc into each of next 5 chs, sk next ch. 1 sc into each of next 11 chs, 3 sc into next ch.- rep from * to end. ending last rep with 2 sc into last ch, turn. row 2: Ch 1,2 sc into first sc. ♦ I sc into each of next 11 sc, sk next 2 sc, 1 sc into each of next 5 sc. 3 sc into next sc, 1 sc into each of next 5 sc, sk next 2 sc, 1 sc into each of next 11 sc, 3 sc into next sc; rep from * to end. ending last rep with 2 sc into last sc, turn. Rep Row 2, changing yarns in the following color sequence: 4 rows in yarn A, 2 rows in yam B. 4 rows in yarn A. 2 rows in yarn C. Repeat for length required. Fasten off yam. WEI Up and Down Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2, changing yams in the following color sequence: 6 rows in yam A, 2 rows in yarn B. 4 rows in yarn C, 2 rows in yarn В Repeat for length required. Fasten off yam. • О»
STITCH COLLECTION 175 Celtic Waves 16 + 3 A delightfully subtle lace pattern when worked in softly shaded stripes from a cool palette of mauve, blue, and turquoise, this stitch also looks good worked in a single color of yarn. Special abbreviation sl 2 = slip next two stitches as if you were going lo work K2tog. Using yarn A, CO a multiple of 16 sts plus 3. ROW 1 and every alt row: (WS) KI, P to last sl, KI. ROW 2: K. ROW 4: KI, |K1, YO1 three times, [sl 1, K1, pssol twice, sl 2, KI, p2sso, [K2tog| twice. * YO, |K1, YO| five times, [sl 1, KI, psso] twice, sl 2, K1, p2sso, [K2log| twice; rep from * to last 4 sis, [YO, KI I three limes, KI. Rep Rows 1-4, changing yarns in the following color sequence and ending with a Row 4: 6 rows in yarn A, ❖ 4 rows in yarn B, 4 rows in yarn C. 4 rows in yarn D, 8 rows in yarn A. 4 rows in yarn D, 4 rows in yarn E, 4 rows in yarn B. 8 rows in yarn A. Repeat from * for length required. BO. CO as left. Rep Rows 1-4 for length required, ending with a Row 4. BO. 108
STITCH COLLECTION !Ш Distant Skies Openwork bands contrast with solid stripes in this attractive crochet chevron pattern. Work in evenly-sized bands of color or pick out the lace rows in a contrasting color for a different effect. © FOUNDATION CHAIN: multiple of 23 chains plus 22. Special abbreviations v = v-stitch (work 11 de. ch I. t del into indicated stitch). cl = cluster (keeping last loop of each de on hook, work I de into next sc, sk next 2 sc, I de into next sc, YO and draw through all J loops on hook). Using yarn A, make the required length of foundation chain. row i: (RS) 1 sc into 2nd ch from hook, 1 sc into each of next 9 chs, 3 sc into next ch, 1 sc into each of next 10 chs, ’k sk next 2 chs, I sc Into each of next 10 chs, 3 sc into next ch, I sc into each of next 10 chs; rep from * to end, turn. ROW 2: Ch I, sk first sc, I sc into each of next TO sc, 3 sc into next sc, * 1 sc into each of next 10 sc. sk next 2 sc, I sc into each of next 10 sc, 3 sc into next sc; rep from * to last 11 sc, 1 sc into each of next 9 sc, sk next sc, 1 sc into last sc, turn. ROW 3: Ch 3, sk first sc, 1 de into next sc, sk next 2 sc, (v into next sc, sk next 2 sc| twice, 1 de into next sc. ch 1. v into next sc, ch 1, I de into next sc, sk next 2 sc, |v into next sc, sk next 2 sc| twice, * cl, sk next 2 sc, |v into next sc, sk next 2 sc] twice, 1 de into next sc, v into next sc, ch 1. 1 de into next sc, |sk next 2 sc, v into next sc | twice; rep from * lo last 4 sc, sk next 2 sc, dc2tog, turn. ROW 4: Working in each st and each ch, sk first st. 1 sc into each of next 9 sts, 3 sc into next sl, * 1 sc into each of next 9 sis, sk next sl, I sc into each of next 9 sts, 3 sc into next st; rep from sk to last 1 () sts, I sc into each of next 8 sis, sk next st, 1 sc into last st, turn, leaving ch-3 unworked, turn. ROW 5: Ch I, sk first sc, 1 sc into each of next 8 sc, 2 sc into next sc, 3 sc into next sc, 2 sc into next sc, * 1 sc into each of next 8 sc, sk next 2 sc, 1 sc into each of next 8 sc, 2 sc into next sc, 3 sc into next sc. 2 sc into next sc; rep from sk to last 9 sc, 1 sc into each of next 7 sc, sk next sc. 1 sc into last sc. turn. ROW 6: Ch 1, sk first sc, 1 sc into each of next 10 sc, 3 sc into next sc, * 1 sc into each of next 10 sc, sk next 2 sc, 1 sc into each of next 10 sc, 3 sc into next sc; rep from sk to last 11 sc. 1 sc into each of next 9 sc, sk next sc, 1 sc into last sc, turn. Rep Rows 3-6, changing yarns in the following color sequence: 4 rows in yarn A, 4 rows in yam В 4 rows in yarn C, 4 rows in yarn D. Repeat for length required. Fasten off yarn. iH=l Horizon Using yarn A, make the foundation chain and work Rows 1 and 2 as left. Rep Rows 3-6. changing yarns in the following color sequence: 2 rows in yarn A, * 1 row in yarn B. 3 rows in yarn С, I row in yarn B, 3 rows in yarn A. Repeal from * for length required. Fasten off yarn. 109
STITCH COLLECTION <g>@ 1B ЕБИ Old Shale This classic Shetland lace pattern, related to Dimple Shale tpage 76), looks less traditional when worked in narrow, zinging stripes of bright colors. To get another look, use a Using yam A, CO a multiple of 18 sts. ROW 1: (RSI K. ROW 2: KI. Pto last st. KI. ROW 3: * |K2tog| three limes, |YO, KI | six times, |K2tog| three limes: rep from * to end. ROW 4: K. Rep Rows 1-4, changing yarns in the following color sequence and ending with a Row 4: vo-tone ribbon yarn throughout. 4 rows in yam A. 4 rows in yarn В 4 rows in yam C, 4 rows in yam В Repeal sequence for length required. BO. «I SPECIAL YARN KEY В multicolored DK yarn tnsi Two-tone «I SPECIAL YARN KEY two-tone ribbon CO as left. Rep Rows I -4 for length required, ending with a Row 4. BO.
BED Tutti Frutti Co wild with your color choices when working this plain chevron pattern. Contrast a bright multicolored yarn with hot fuchsia pink or combine wide stripes of novelty yarn with stripes of a plain background color. Gypsy Rondo Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2, changing yarns in the following color sequence: 3 rows in yarn A, 3 rows in yarn В 3 rows in yam C, 3 rows in yarn В Repeat for length required. Fasten off yarn. FOUNDATION CHAIN: multiple of 25 chains. Using yam A. make the required length of foundation chain. ROW 1: (RS) 1 de into 4th ch from hook, 1 de into each of next 9 chs, * 3 de into next ch, 1 de into each of next 11 chs, sk next 2 chs, I de into each of next 11 chs; rep from * to last 12 chs, 3 de into next ch, 1 de into each of next 11 chs, turn. ROW 2: SI st into 2nd de, ch 3, 1 de into each of next 10 de, * 3 de into next de, 1 de into each of next 11 de, sk next 2 de, 1 de into each of next 11 de; rep from * to last 12 sts, 3 de into next de, 1 de into each of next 11 de, turn. Rep Row 2, changing yarns in the following color sequence: 2 rows in yam A, * 1 row in yarn В 3 rows in yarn A. Repeat from * for length required. Fasten off yarn. SPECIAL YARN KEY В novelty yarn NOTE: After completing Row 1. work only into the back loops of all stitches. SPECIAL YARN KEY В multicolored yarn О ••
EES Sweet Violets This pattern contrasts sections of solid stitches with lace and makes a knitted fabric with good drape. It would make a lovely small-size lap afghan and you can add lo the soft appearance by incorporating a textured yarn. Using yarn A. CO a multiple of 7 sts plus 2. ROW 1: (RS) KI, * K2, si 1, K2tog, psso, K2, YO; rep from * to last st, KI. ROW 2: KI, * P6, YO; rep from * to last st, K1. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 4 rows in yarn A, 4 rows in yarn B, 4 rows in yarn A, 4 rows in yarn B, 4 rows in yarn A, 4 rows in yarn B. 4 rows in yarn C, 4 rows in yarn B. 4 rows in yarn C, 4 rows in yarn B. Repeat for length required. BO. NOTE: Where possible, don't break yarn at color changes, instead carry colors not in use loosely up the side of the work. Snuggle Using yarn A, CO as left. Rep Rows 1 and 2, changing yarns in lhe following color sequence and ending with a Row 2: 4 rows in yam A, 2 rows in yarn В 4 rows in yarn A. Repeat for length required. BO. NOTE: At color changes, don't break main yarn, instead carry it loosely up side of work. SPECIAL YARN KEY В lilac eyelash yarn Edwardian Waves Using yarn A, CO as above. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 7 rows in varn A. 2 rows in varn В Repeat for length required. BO. NOTE: At color changes, don’t break yarn, instead carry yarn not in use loosely up side of work.
STITCH COLLECTION О = 0 я EES Amethyst Lace Gloriously feminine, this delicate lace stitch produces a soft fabric with good drape and it would be perfect to make a shawl or evening wrap. Choose soft or strongly contrasting shades of purple and mauve, depending on your preference. FOUNDATION CHAIN: multiple of 16 chains plus 4. Using yarn A. make the required length of foundation chain. ROW 1: (RS) 1 de into 5th ch from hook, |ch I, sk next ch, 1 de into next ch| twice, ch 1. sk next ch, * |1 de, ch 11 four limes into next ch, sk next ch, 11 de into next ch, ch 1, sk nexl ch] twice, I de into next ch, sk next 3 chs, [1 de into next ch, ch 1, sk next ch] three times; rep from * to last 10 chs, 11 de, ch 11 four times into next ch, sk next ch, |1 de into next ch, ch 1, sk next ch| twice, 1 de into nexl ch, sk nexl 2 chs, 1 de into last ch, turn. row 2: Ch 3, sk first 2 de and next ch-1 sp, |1 de into next ch-1 sp, ch 1| three times, |1 de, ch 1) four times into next ch-1 sp, |1 de into next ch-1 sp, ch 11 twice, 1 de into next ch-1 sp, * sk next ch-1 sp, nexl 2 de and nexl ch-1 sp, |1 de into nexl ch-1 sp, ch 1] three limes, |1 de, ch-11 four times into next ch-1 sp, |1 de into next ch-1 sp, ch 11 twice, 1 de into next ch-1 sp; rep from * to last 2 de, sk last 2 de. 1 de into 4th of beg skipped ch-4, turn. ROW 3: Ch 3, sk first 2 de and next ch-1 sp, |1 de into next ch-1 sp, ch 1| three limes, |1 de, ch 1| four times into next ch-1 sp, |1 de into next ch-1 sp, ch 11 twice, 1 de into next ch-1 sp, : * sk next ch-1 sp, nexl 2 de and next ch-1 sp, |1 de into next ch-1 sp. ch II i three times, Ц de, ch-1| four times into next ch-1 sp, |1 de into next ch-1 sp, ch 11 twice, 1 de into next ch-1 sp; rep from * to last 2 de, sk last 2 de, 1 de into 3rd of ch-3, turn. Rep Row 3, changing yarns in the following color sequence: 1 row in yarn A, 2 rows in yarn B. 3 rows in yarn C. Repeat for length required. Fasten off yarn. SfzH Violet and Pearl Using yarn A. make the foundation chain and work Rows I and 2 as left. Rep Row 3, changing yams in the following color sequence: 4 rows in yarn A, 2 rows in yarn B. Repeat for length required. Fasten off yarn.
@@ 29 + 2 ЕЕЗ Forest Fern A traditional large-scale lace pattern is brought up to date with two boldly contrasting color schemes. Wide stripes of mid- and dark green create a strong design statement; for a softer look, choose four or more shades and vary the width of the stripes. Using yarn A, CO a multiple of 29 sts plus 2. ROW 1: (RS) KI, * KI, sl 1, K2tog, psso, K9, YO, K1, YO, P2, YO, K1, YO, K9, sl 1, K2tog, psso; rep from * to last st, K1. ROW2: KI, * P13, K2, P13; rep from * to last st, K1. ROW3: KI, * KI, Sl 1, K2tOg, pSSO, K8, [YO, K11 twice, P2, [KI, YO| twice, K8, sl 1, K2tog, psso; rep from * to last st, K1. ROWS 4, 6, and 8: Rep Row 2. ROW 5: K1, * K1, sl 1, K2log, psso, K7, YO, K1, YO, K2, P2, K2, YO, K1, YO, K7, sl 1, K2tog, psso; rep from * to last st, K1. ROW 7: K1, * KI, sl 1, K2tog, psso, K6, YO, K1, YO, КЗ, P2, КЗ, YO, K1, YO, K6, sl 1, K2tog, psso; rep from * to last st, K1. ROW9: KI, * KI, sl 1, K2tog, psso, K5, YO, K1, YO, K4, P2, K4, YO, K1, YO, K5, sl 1, K2tog, psso; rep from * to last st, KI. ROW 10: K1, * P13, K2, P13; rep from * to last st, KI. Rep Rows 1-10, changing yarns in the following color sequence and ending with a Row 10: 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn A, 2 rows in yarn C, 6 rows in yarn D, 2 rows in yarn C. Repeat for length required. BO. NOTE: When working a yarn over between a knit stitch and a purl stitch, carry the yarn over, under, and back to the front of the work. П=Е1 Traveler Using yarn A, CO as left. Rep Rows 1-10, changing yarns in the following color sequence and ending with a Row 10: 10 rows in yarn A, 10 rows in yarn B. Repeat for length required. BO. oo
*ое FOUNDATION CHAIN: multiple of 23 chains plus 2. Special abbreviations cl = cluster (keeping last loop of each stitch on the hook, work 3 de into next stitch or space, YO and draw through all 4 loops on hook), cis = clusters. Using yam A. make the required length of foundation chain. Row 1: (RS) I sc into 2nd ch from hook, 1 sc into each ch, turn. ROW 2: Ch 3, sk first 3 sc, |3 de into next sc, sk next 2 sc| three times, |3 de, ch 3, 3 dc| into next sc, * [sk next 2 sc, 3 de into next sc| twice, sk next 2 sc, cl into next sc, sk next 4 sc, cl into next sc, [sk next 2 sc, 3 de into next sc| twice, sk next 2 sc, |3 de, ch 3, 3 dc| into next sc; rep from * to last 12 sc, sk next 2 sc, 13 de into next sc, sk next 2 sc| three times, 1 de into last sc, turn.
STITCH COLLECTION [£3 Granny Chevrons Bands of granny square stitch groups make up this striking chevron pattern and you can add bands of mohair yarn for extra texture. This stitch is perfect for using up colorful oddments of yarn from your stash. © гз-г ЕЕЯ Glade Using yam A, make the foundation chain and work Rows 1 and 2 as left. row 3: Ch 3, sk sp between turning ch and next 3-dc group, 3 de into each of next 3 sps, [3 de, ch 3. 3 del into next ch-3 sp, * 3 de into each of next 2 sps, cl into next sp, sk sp between cis, cl into next sp, 3 de into each of next 2 sps, |3 de, ch 3, 3 dc| into next ch-3 sp; rep from * to last 4 sps, 3 de into each of next 3 sps, 1 de into sp between last 3-dc group and turning ch, turn. Rep Row 3, changing yarns in lhe following color sequence: 2 rows in yarn A, * 1 row in yarn B. I row in yam C. 1 row in yarn A. Repeat from * for length required. Fasten off yarn. Rep Row 3, changing yarns in lhe following color sequence: 5 rows in yarn A. * 2 rows in yarn В 2 rows in yarn C, 2 rows in yarn B, 4 rows in yarn A. Repeat from * for length required. Fasten off yam. I SPECIAL YARN KEY C green mohair yarn 115
STITCH COLLECTION EES Frangipani Hot, zinging colors of yam show this chevron pattern off to good effect. An eyelash yarn is used together with a smooth yam to give the same thickness as the space-dyed chunky cotton yarn. This stitch also looks good worked in two smooth wool yarns. Using yarn A. CO a multiple of 18 sts plus 1. ROW 1: (RS) * KI. YO, K5. K2tog, КЗ, sl 1, KI, psso, K5, YO; rep from * to last st, KI. ROW 2: K1, P to last St, KI. Rep Rows 1 and 2, changing yarns in the following color sequence and ending with a Row 2: 4 rows in yarn A, 4 rows in yarns В and C worked together. •о* Repeal for length required. BO. NOTES: Use yams В and C together throughout. Al color changes, don't break main yam, instead carry it loosely up side of work. SPECIAL YARN KEY A multicolored chunky yam C variegated eyelash yarn rnvt Hot Stripes Using yarn A. CO as left. Rep Rows 1 and 2. changing yarns in the following color sequence and ending with a Row 2: 6 rows in yarn A. 2 rows in yam B. Repeat for length required. BO. NOTE: Al color changes, don't break main yarn, instead carry it loosely up side of work.
FOUNDATION CHAIN: multiple of 34 chains plus 2. Special abbreviation sh = shell ton Row I, make shell by working 11 sc, ch 2, I scl into next chain. On subsequent rows, make shell by working 11 sc, ch 2, 1 scl into next ch-2 space). Using yam A, make the required length of foundation chain. row i: (RS) 1 sc into 2nd ch from hook, sk nexl ch, sh in next ch, |sk next 2 chs, sh in next ch| four times, * sk next 2 chs, |sh, ch 3, sh| into next ch, Isk next 2 chs, sh in nexl ch| four times, sk next 2 chs, 1 sc into next ch, sk next 3 chs, 1 sc into next ch, Isk next 2 chs, sh into next ch| four limes; rep from * to last 20 chs, sk nexl 2 chs, |sh, ch 3, sh| into next ch, Isk next 2 chs, sh in next ch| five times, sk nexl ch, 1 de into last ch, turn. EES Party Time Th is deep chevron pattern is worked in hot, strong colors and the pattern is highlighted with narrow stripes worked in a multicolored metallic yarn. The stitch looks equally effective worked in four colors highlighted with white. row 2: Ch 1, 1 sc into first de and into ch-2 sp of first sh, Ish into ch-2 sp of next sh) five times, * Ish, ch 3, sh| into next ch-3 sp, |sh into ch-2 sp of next sh) four times, 1 sc into each of next 2 ch-2 sps, Ish into ch-2 sp of * to last ch-3 sp, Ish, ch 3, shl into last ch-3 sp, Ish into ch-2 sp of next shl five times, 1 sc into next ch-2 sp, 1 de into last sc, turn. Rep Row 2, changing yarns in the following color sequence: 2 rows in yarn A, * 1 row in yarn B. 5 rows in yarn C, 1 row in yarn В 3 rows in yarn A. Repeat from * for length required. Fasten off yarn. Pink Fizz Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B. 2 rows in yarn C, 2 rows in yarn D 2 rows in yarn E. Repeat for length required. Fasten off yam. «I SPECIAL YARN KEY В multicolored metallic yarn »oo> 117
25 + 2 A classic lace stitch is worked in bold stripes to create a lovely ripple pattern, shown here in two different stripe combinations. This stitch has a good drape and is perfect for making a small afghan to throw over a favorite chair. 197 Blue Moon Using yarn A. CO a multiple of 25 sts plus 2. ROW 1 and every all row: (WS) K2, * P23, K2; rep from * to end. ROW 2: P2, * sl I, КI, psso, K6, |YO, KI | twice, sl 1, К 2 tog, psso, |КI, YO| twice, Kb, К2log, P2; rep from * lo end. ROW 4: P2, * sl 1, KI, psso, K5, YO, КI, YO, K2, sl 1, K2tog, psso, K2, YO, KI, YO, K5, K2tog, P2; rep from ❖ lo end. ROW 6: P2, * sl I, KI, psso, K4, YO, K1, YO, КЗ, sl 1, K2log, psso, КЗ, YO, KI, YO, K4, K2log, P2; rep from * to end. ROW 8: P2, * sl I, KI, psso. КЗ, YO, KI, YO, K4, sl 1, K2tog, psso, K4, YO, KI, YO, КЗ, K2tog, P2; rep from ♦ lo end. ROW 10: P2, * sl 1, KI, psso, K2, YO, KI, YO, K5, sl I, K2tog, psso, K5, YO, K1, YO, K2, K2tog, P2; rep from * lo end. ROW12:P2, *sl I. KI, psso, |K1, YO| : twice, K6, sl I, K2tog, psso, K6. |YO, : KI | twice, K2tog, P2; rep from * to end. ROW 14: P2, * sl 1, KI, psso, YO, KI, : YO, K7, sl I, K2tog, psso, K7, YO, KI, i YO, K2log, P2; rep from * to end. Rep Rows 1-14, changing yarns in the following color sequence and ending with a Row 14: 1 row in yarn A, 2 rows in yarn B, 12 rows in yarn A, 2 rows in yarn C, j 12 rows in yarn A, 2 rows in yarn D. : 11 rows in yarn A. Repeat for length required. BO. NOTE: At color changes, don't break yarn, instead carry yarn not in use loosely up side of work. ♦ Using yarn A, CO as left. Rep Rows 1-14, changing yarns in the following color sequence: 14 rows in yarn A, 14 rows in yarn B, 14 rows in yarn C, 14 rows in yarn B. Repeal for length required. BO. 118
STITCH COLLECTION 0 0 о О © EES Provence This pattern makes a vibrant, colorful impression. Choose a selection of six contrasting yarn colors or use up oddments from your yarn stash to make a uniquely personal color statement. FOUNDATION CHAIN: multiple of 11 chains plus 2. Using yarn A, make the required length of foundation chain. ROW 1: (RS) 2 sc into 2nd ch from hook, * 1 sc into each of next 4 chs, sk next 2 chs, 1 sc into each Of next 4 chs, 3 sc into next ch; rep from * to end, ending last rep with 2 sc into last ch, turn. ROW 2: Ch 1, 2 sc into first sc, * I sc into each of next 4 sc, sk next 2 sc, 1 sc into each of next 4 sc, 3 sc into next sc; rep from * to end, ending last rep with 2 sc into last sc, turn. №BI Aquarius Using yarn A, make the foundation chain and work Row 1 as left. Rep Row 2, changing yams in the following color sequence: 2 rows in yarn A. 2 rows in yarn B. Repeat for length required. Fasten off yam. Rep Row 2, changing yarns in the following color sequence: 2 rows in yarn A, 2 rows in yarn B, 2 rows in yarn C, 2 rows in yarn D, 2 rows in yarn E, 2 rows in yarn F. Repeat for length required. Fasten off yarn. K«»l Sea and Sand Using yarn A, make lhe foundation chain and work Row 1 as above. Rep Row 2, changing yarns in the following color sequence: 6 rows in yarn A, 1 row in yarn B, 1 row in yam C, 1 row in yarn A, I row in yarn D. Repeat for length required. Fasten off yarn. 119