Text
                    Publication No. AT-146TE-3/S1-1E
01
Aerial Platform for Live Wire Work
AT-146TE-3
Applicable Serial No. 228376 --
Model


Safety 1 WA01-0042E Safety Most accidents that occur during machine operation and maintenance are caused by failure to observe basic safety rules and precautions. Before operating your machine or performing maintenance, read and become familiar with all the safety precautions and recommendations given in this section. Remember that failure to observe even a single precaution could involve you and the people around the machine in a serious accident. Foreseeing potential dangers is vital for preventing accidents. All personnel working with the machine, including the supervisor, machine operator and oiler, should be sensitive to potentially dangerous situations and take the necessary measures to prevent accidents. Safety precautions and recommendations are outlined in this section and are also included in the operation and maintenance instructions given in subsequent sections. Warning labels are also provided on the machine. The cautionary instructions in this manual are identified as "DANGER", "WARNING", "CAUTION" or "NOTICE". These terms are defined as follows: [NOTICE] NOTICE indicates an important measure or condition for handling, and indicates that, if not observed, there is a risk of damaging the equipment or device, or degrading performance and function of the machine. It is virtually impossible to anticipate every situation that might present a hazard. The safety precautions given in this manual and on the machine labels are not exhaustive. It is important, therefore, to strictly follow the instructions in this manual and be sensitive to potential dangers in order to prevent bodily injury and damage to the machine. Remember that your most important duty is to ensure the safety of you, your co-workers and any other people in the area. DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury. DANGER WARNING indicates a hazardous situation which, if not avoided, could result in death or serious injury. WARNING CAUTION indicates a hazardous situation which, if not avoided, could result in minor or moderate injury. CAUTION
Safety 2 WA01-0042E 1. Fundamental cautions Servicemen inexperienced in the units of this machine should be cautious about safety operations. They must acquire sufficient knowledge about the equipment before dismounting and disassembling it. Before dismounting each component, a serviceman should read this service manual thoroughly and find out the weight of the component, then lift it by proper means. The following are cautions to be observed all the time. 1.Before starting repairs, find out the origin of the problem. When it becomes clear that disassembly and maintenance are necessary, first of all read this manual and parts catalog and thoroughly understand the principle of operation and construction. Then carefully check and examine each portion. Don't disassemble portions unrelated to the problem. Unless taking all possible measures before starting disassembly, new troubles or decline in performance may be induced. 2.Before operating the machine, oiling or repairing, read warning labels and instructions on the machine and understand the contents. 3.Wear a safety helmet and safety shoes whenever you carry out maintenance operation around the machine. Be sure to wear safety goggles when you hit the machine or its attachments with a hammer. In welding operation, wear safety gears such as leather gloves, helmet, goggles, apron and proper working clothes, but don't wear loose or torn clothes. Take a ring and so on off your finger when you conduct maintenance or repair. 4.Park the machine on as level and hard ground as possible. Place chocks under wheels to prevent the vehicle from moving when doing maintenance on or below the machine. 5.Before starting maintenance, remove cables to the battery and allow the capacitors to discharge. Pull out the ignition key and hang a tag saying, "Don't start the engine." in the cab. 6.Don't carry out maintenance while lifting the vehicle with only a jack or a hoist. Sustain the vehicle positively with blocks and so on to prevent fatal accidents, as there is a possibility that the vehicle loses its balance and falls down on a worker in a dismounting process of certain units. 7.When the working is done on a team of more than one person, make arrangements about co-operation and communication between workers beforehand. Give a sign without fault and make sure that the sign has been transmitted to other workers before starting the next operation. 8.When it is inevitable to measure oil pressure, rotational speed, and temperature for machine inspection without stopping the engine, be careful not to be caught or pinched in rotating or moving parts such as a fan, fan belt. Make sure that there is no obstruction or no person around the machine before operating it. 2. Cautions in working 2.1 General 1.When hoisting up components weighing more than 20 kg, use hoist or the like to prevent injury to your lumbar or spine. For specific components, their weights are listed on the chapter for "service data" in this manual. 2. When using eyebolts, lift parts vertically so that only tension is applied to them. 3.Protect wire ropes and plastic lifting slings by covering corners with pads so that they are not bent sharply by directly contacting corners. Keep the sling angle of wire ropes within 60°and as vertical as possible. 4.Be careful about hot or heated portions when conducting repair or maintenance just after the vehicle has stopped or the machine operation has been finished or interrupted. 5.When hitting parts, be sure to either hit on a pad placed on the parts or use a plastic hammer. 6.Put units, especially similar parts, in order. Mark them with tags or a marker if necessary.
Safety 3 WA01-0042E 7.Put disassembled parts in order so that parts such as bolts are not left behind in the machine. And check that no parts run short at assembly. 8.Watch your step in the following cases: When stepping up to or stepping down from the upper surface of a boom for replacing wire ropes and applying grease. Be careful not to stumble on protrusions on the upper surface of a boom. When greasing at the root of a elevating cylinder When checking engine oil, radiator coolant, or battery fluid. When replacing a filter of air cleaner. When getting on and off the cab. Be careful not to slip in the above operations in winter as snow and ice may attach to the exterior of boom and it becomes very slippery. 2.2 Dismounting and disassembling 1.Before dismounting and disassembling, make sure of the construction and part sales unit by reading this manual and the separate parts catalog, then understand the procedures of dismounting and remounting and disassembling and reassembling. 2.When dismounting piping or equipment that may contain pressurized oil or air, be extremely cautious and dismount them only after discharging the confined pressure. 3.Before removing, clean the part to be dismounted and the area surround it. Seal the opening with a plug or tape, etc. to prevent foreign material from entering it. 4.Measure and record the data such as shim thickness adjustment and pre-load at disassembly that will be required at reassembly. 5.If required, before disassembling clearly put marks to avoid errors at reassembling. 6.If a part cannot be removed after removing bolts or nuts fixing it, don't apply too much force to it but check the part for the cause. Only after relieving the cause, proceed disassembling. 7.Use lifting slings appropriate for the weight and characteristics of a part. Lift up it in balanced condition. In case that the position of the center of gravity is not clear and there is a possibility of swing of load after removing, use two hoists. 8.If a part cannot be lifted smoothly, make sure that all the fasteners are removed and other parts don't hinder removing. 2.3 Remounting and assembling 1.Before assembling, clean all the parts and repair or replace defective parts. 2.As dirt and soil adversely affect sliding portions and they may decrease the life of the machine, pay special attention to avoid intrusion of dirt and soil. 3.Use special tools for parts when specified to do so. 4.Remove dirt, soil, water, and resin completely from surfaces where liquid gasket will be applied. 5.After remounting, be sure to inspect the machine and verify that there is no error by oversight. If adjustment or air bleeding is required, conduct it according to instructions. Conduct function and performance test to verify its integrity. 3. Cautions in operation 3.1 Brake fluid replenishment 1.When the brake-warning lamp (for fluid level) is lighted, replenish brake fluid and check and make sure of the thickness of disk brake pads. (Refer to Chapter Y for periodical inspection periods.) 2.Check the thickness of disk brake pads whenever brake fluid is replenished. 3.2 Handling of battery 1.Erroneous handling of a battery may cause it to catch fire and explode. Be extremely sure to avoid short circuits, sparks and fire of cigarettes and the like when using a jumper cable. They are very dangerous. Charge up batteries and use them only in well ventilated places.
Safety 4 WA01-0042E 2.Battery fluid (dilute sulfuric acid) may cause loss of sight or burn injury. If battery fluid stains an eye, skin, or clothes, immediately wash down them with a great deal of water. If battery fluid enters into an eye, immediately wash it down with water and see a doctor for medical aid. 3.When removing terminals, remove the minus (--) terminal first. When connecting terminals, connect minus (--) terminal last. 3.3 Handling of radiator 1.Don't open the radiator cap while the coolant is still hot. 2.Check the coolant at the reservoir tank. 3.If high-pressure water is used for radiator cleaning, fins may be damaged. 3.4 Cooling fan 1.Stop the engine completely before checking the tension of the engine fan belt. 2.The oil cooler fan may rotate the moment the engine is started. Be sure to pull out the ignition key before accessing the cooling fan. 4. About waste disposal 1.Waste oils, used filters, and other such petrochemical-related products, if disposed of thoughtlessly, will cause environmental contamination. 2.Obtain a proper-sized vessel before releasing waste oils from the machine. Never discharge waste oils on the ground or into rivers, lakes or marshes. 3.Follow all governing environmental rules and regulations when disposing of oils, fuels, cooling water, brake fluid, solvents, filters, batteries or any other damaging substances. 4.1 Gasoline 1.Spill or leak: Review fire and explosion hazards before proceeding with clean up. Use appropriate personal protective equipment during clean up. Dike spill. Prevent liquid from entering sewers, waterways, or low areas. Soak up with sawdust, sand, oil dry or other absorbent material. Shovel or sweep up. 2.Remove source of heat, sparks, flame, impact, friction or electricity including internal combustion engines and power tools. If equipment is used for spill cleanup, it must be explosion proof and suitable for flammable liquid and vapor. Note: Vapors released from the spill may create an explosive atmosphere. 3.Waste disposal method: Treatment, storage, transportation and disposal must be in accordance with applicable federal, state, provincial, and local regulations. Do not flush to surface water or sanitary sewer system. 4.By itself, the liquid is expected to be a RCRA ignitable hazardous waste. 4.2 Hydraulic oil 1.Spill of leak: Contain spill immediately in smallest area possible. Recover as much of the product itself as possible by such methods as vacuuming, followed by soaking up of residual fluids by use of absorbent materials. Remove contaminated items including contaminated soil and place in proper containers for disposal. Avoid washing, draining or directing material to storm or sanitary sewers. 2.Waste disposal method: Recycle as much of the recoverable product as possible. Dispose of nonrecyclable material as a RCRA hazardous waste by such methods as incineration, complying with federal, state, and local regulations. 4.3 Motor oil See HYDRAULIC OIL above.
Foreword 1 WA04-3170E Foreword This service manual describes the composition of the Model AT-146TE-3 aerial platform (AMC3 specification), its repair, checks and adjustment methods and other relevant matters. Note that this service manual does not provide the information in the separate service manuals given below. Read the separate operation and maintenance manual and the parts catalog for repair and maintenance of the aerial platform in conjunction with this manual. If the parts need to be replaced, check the disassemble units and sales units in the parts catalog before replacing them. 1. Applicable Spec. No. This service manual applies to the aerial platform with the specification numbers given below. Check the specification number on the nameplate of your aerial platform. SPEC. NO. SE RIAL. KAGAWA, JAPAN NO. MFG.DATE. ISA04-001601 Spec. No. Applicable serial No. AT-146-3-xxx98 228376--- Compare the lower 2 places of the 5 digits stamped on the nameplate which represent the specification with the No. in the above table. Spec No. on the nameplate The specification No. stamped on the nameplate consists of the model, lower Spec. No. (upper 3 places of the 5 digits and representing the specification of the carrier) and upper Spec. No. (lower 2 places of the 5 digits and representing the specification of the aerial platform device). Example AT-146-3 - 431 98 RepresentingupperSpec. Representing lower Spec. Representing model 2. Separate service manual Separate Service Manual Publication No. 1 General Cautions SA01-01-2E 2 Service Manual (Circuit Diagrams and Data) AT-146TE-3/C3-1E 3 AMC3 (Automatic Motion Controller) W319-0013E Please note that, for product improvement, some changes may have been incorporated in the machine that are not covered in this manual.
Foreword 2 WA04-3170E 3. Outline of specifications Spec. No. No. Item AT-146-3-xxx98 1 Boom 3-section boom Top boom section made of insulative F.R.P. (fiber-reinforced plastics) 2 Jib Jib made of insulative F.R.P. 3 Bucket Bucket made of insulative F.R.P. Bucket inner case made of insulative polyethylene Automatic leveling system Swing system driven by hydraulic motor 4 Winch Hydraulic motor driven Synthetic fiber rope 5 AMC3 Fitted 6 Boom interference prevention function Fitted 7 Boom automatic stowing function Fitted 8 Bucket vertical/horizontal movement control device Fitted 9 Automatic speed control device on boom elevation and swing Fitted 10 Jack interlock Fitted 11 Boom interlock Fitted 12 Hydraulic pressure takeout unit (upper) Fitted 13 Automatic charger for the buttery on bucket Fitted 14 Hydraulic booster (upper) Fitted 15 Shift lever interlock Fitted 16 Parking brake warning device Fitted 17 PTO switch-off reminder alarm Fitted 18 Level gauge Fitted
Foreword 3 WA04-3170E 4. Conversion table Length millimeter, mm centimeter, cm meter, m inch, in, " foot, ft, ' mile, mi kilometer, km 1 1×10 -1 1×10 -3 3.93701×10 -2 3.28084×10 -3 1 1.60934 1×10 1 1×10 -2 3.93701×10 -1 3.28084×10 -2 6.21373×10 -1 1 1×10 3 1×10 2 1 3.93701×10 3.28084 2.54×10 2.54 2.54×10 -2 1 8.33333×10 -2 3.048×10 2 3.048×10 3.048×10 -1 1.2×10 1 Speed km/h mile/h 1 6.21373×10 -1 1.60934 1 Area square millimeter, mm 2 square centimeter, cm 2 square meter, m 2 square inch, in 2 square foot, ft 2 1 1×10 -2 1×10 -6 1.55×10 -3 1.07639×10 -5 1×10 2 1 1×10 -4 1.55×10 -1 1.07639×10 -3 1×10 6 1×10 4 1 1.55×10 3 1.07639×10 6.4516×10 2 6.4516 6.4516×10 -4 1 6.94444×10 -3 9.2903×10 4 9.2903×10 2 9.2903×10 -2 1.44×10 2 1 Volume cubic centimeter, cm 3 ,cc cubic meter, m 3 cubic inch, in 3 cubic foot, ft 3 gallon, gal cubic inch, in 3 liter, lit, L 1 1×10 -6 6.10237×10 -2 3.53147×10 -5 1 2.31×10 2 3.78541 1×10 6 1 6.10237×10 4 3.53147×10 4.329×10 -3 1 1.63871×10 -2 1.63871×10 1.63871×10 -5 1 5.78704×10 -4 2.64172×10 -1 6.10237×10 1 2.83168×10 4 2.83168×10 -2 1.728×10 3 1 Force N kgf lbf 1 1.01972×10 -1 2.24809×10 -1 9.80665 1 2.20462 4.44822 4.53592×10 -1 1 Mass gram, g kilogram, kg ounce, oz pound, lb metric ton, ton, t short ton, s. t 1 1×10 -3 3.5274×10 -2 2.20462×10 -3 1×10 -6 1.10231×10 -6 1×10 3 1 3.5274×10 2.20462 1×10 -3 1.10231×10 -3 2.83495×10 2.8349×10 -2 1 6.25×10 -2 2.83495×10 -5 3.12494×10 -5 4.53592×10 2 4.53592×10 -1 1.6×10 1 4.53592×10 -4 5×10 -4 1×10 6 1×10 3 3.5274×10 4 2.20462×10 3 1 1.10231 9.07185×10 5 9.07185×10 2 3.2×10 4 2×10 3 9.07185×10 -1 1
Foreword 4 WA04-3170E Pressure Pa kPa MPa kgf/cm 2 lbf/in 2 , psi 1 1×10 -3 1×10 -6 1.01972×10 -5 1.45038×10 -4 1×10 3 1 1×10 -3 1.01972×10 -2 1.45038×10 -1 1×10 6 1×10 3 1 1.01972×10 1.45038×10 2 9.80665×10 4 9.80665×10 9.80665×10 -2 1 1.42233×10 6.89476×10 3 6.89476 6.89476×10 -3 7.03072×10 -2 1 bar MPa kgf/cm 2 1 1×10 -1 1.01972 1×10 1 1.0972×10 9.80665×10 -1 9.80655×10 -2 1 Torque N-cm N-m kgf-cm kgf-m foot-pound, ft-lbf inch-pound, in-lbf 1 1×10 -2 1.01972×10 -1 1.01972×10 -3 7.37562×10 -3 8.85074×10 -2 1×10 2 1 1.01972×10 1.01972×10 -1 7.37562×10 -1 8.85074 9.80665 9.80665×10 -2 1 1×10 -2 7.23301×10 -2 8.67961×10 -1 9.80665×10 2 9.80665 1×10 2 1 7.23301 8.67961×10 1.35582×10 2 1.35582 1.38255×10 1.38255×10 -1 1 1.2×10 1.12985×10 1.12985×10 -1 1.152513 1.15213×10 -2 8.33333×10 -2 1 N-m kgf-m ft-lbf 1 1.01972×10 -1 7.37562×10 -1 9.80665 1 7.23301 1.35582 1.38255×10 -1 1 Centigrade-Fahrenheit °F °C °F °C °F °C °F °C °F °C °F °C -90 -67.78 -40 -40 10 -12.22 60 15.56 110 43.33 160 71.11 -80 -62.22 -30 -34.44 20 -6.67 70 21.11 120 48.89 170 76.67 -70 -56.67 -20 -28.89 30 -1.11 80 26.67 130 54.44 180 82.22 -60 -51.11 -10 -23.33 40 4.44 90 32.22 140 60 190 87.78 -50 -45.56 0 -17.78 50 10 100 37.78 150 65.56 200 93.33 Conversion equation: t°C=5(T o F-32)/9, T°F=(9×t°C+160)/5
5 WA04-3170E 5. Group index Outrigger System Swing System Boom Elevating System Winch System Boom Telescoping System Safety System Platform Electric System Option System Diagrams Data, Adjustment and Checks B C D E F G H J N W Y Z Hydraulic Power Generating System
6 WA04-3170E Foreword 6. Contents Spec. No. Chapter Section AT-146-3-xxx98 General A General Cautions Refer to separate service manual Hydraulic Power Generating System Hydraulic Pump (for PTO) B-1 Manual Control Valve (for Bucket) B-2 Proportional Solenoid Valve B-3 Manual Control Valve (for Outriggers) B-4 B Center Joint B-5 Outrigger System C Pilot Check Valve (for Jack Cylinder) C-1 Swing System Hydraulic Motor (for Boom Swing) D-1 Swing Speed Reducer (Boom Swing) D-2 Swing Assembly D-3 D Pilot Check Valve (for Boom Swing Circuit) D-4 Boom Elevating System Counterbalance Valve (for Leveling Cylinder) E-1 Counterbalance Valve (for Elevating Cylinder) E-2 Select Valve (for Leveling Circuit) E-3 E Relief Valve (for Leveling Circuit) E-4 Winch system Winch F-1 Hydraulic Motor (for Jib Swing) F-2 F Pilot Check Valve (for Jib Elevating Cylinder) F-3
7 WA04-3170E Foreword Spec. No. Chapter Section AT-146-3-xxx98 Boom Telescoping system Boom G-1 Counterbalance Valve (for Telescoping Cylinder) G-2 G Pilot Check Valve (for Telescoping Circuit) G-3 Safety System H Length Detector (for Boom) H-1 Platform (Bucket) Bucket J-1 Hydraulic Motor (for Bucket Swing) J-2 J Pilot Check Valve (for Bucket Elevating Cylinder) J-3 Electric System N Control Unit (Accelerator Controller) N-1 Option Overview of Booster W-1 Hydraulic Booster (with Temporary Hold Function) W-2 Solenoid Valve (for Final Tightening and Release) W-3 W Solenoid Valve (for Temporary Hold) W-4 Data, Adjustment and Checks (Refer to separate service manual) Service Data Y-1 Hydraulic Y-2 Adjusting procedure Electric Y-3 Adjustment and Functional Check Y-4 Y Inspection and Maintenance Y-5
8 WA04-3170E Foreword Spec. No. Chapter Section AT-146-3-xxx98 System Diagrams (Refer to separate service manual) Hydraulic Circuit Diagram Z-1 Bucket Z-2 Swing Table Z-3 Frame Z-4 Electric Circuit Diagram Carrier Z-5 Bucket Z-6 Winch, Booster Z-7 Boom Z-8 Swing Table Z-9 Center Joint Z-10 Frame Z-11 Location of Hydraulic Parts Pump, Hydraulic Oil Tank Z-12 Bucket Z-13 Booster Z-14 Optical Fiber Cable Z-15 Boom Z-16 Swing Table Z-17 Frame Z-18 Z Location of Electric Parts Carrier Z-19
i B Hydraulic Power Generating System Contents B-1 Hydraulic Pump (for PTO) ............... 1 1. Structure .................................................... 1 2. Removal and installation............................ 2 3. Disassembly and assembly ....................... 2 3.1 Replacing the oil seal ................................. 2 3.2 Replacing the gaskets and backup strip .... 2 4. Precautions after replacing the pump ........ 2 B-2 Manual Control Valve (for Bucket) . 3 1. Structure .................................................... 3 2. Function ..................................................... 5 2.1 Port relief valve ........................................... 5 2.2 Check valve ................................................ 5 3. Reed switch ............................................... 6 3.1 Removing the reed switch .......................... 6 3.2 Installing the reed switch ............................ 6 3.3 Operational check of reed switch ............... 7 3.4 Adjusting switch shifting points (for a-contact type) ............................. 9 3.5 Adjusting switch shifting points (for b-contact type) ............................. 10 B-3 Proportional Solenoid Valve ......... 11 1. Structure .................................................. 11 2. Function ................................................... 15 2.1 Bleed-off compensator valve (PC1)..........15 2.2 Meter-in compensator valve (PC2) ...........15 2.3 Shuttle valve .............................................15 2.4 Reducing valve (RDV1) ............................15 2.5 Solenoid proportional reducing valve........15 2.6 Unloading valve ........................................15 3. Disassembly ............................................ 16 3.1 Disassembling the end section [101] ........16 3.2 Removing the end covers [201, 202] ........17 3.3 Disassembling the valve section...............18 3.4 Separating the end blocks from the casing ...................................19 3.5 Disassembling the lever pin ......................19 4. Assembly ................................................. 20 4.1 Assembling the end sections and casing...........................................20 4.2 Assembling the end section [101].............21 4.3 Assembling the valve section ...................22 4.4 Installing the end cover [201, 202]............23 B-4 Manual Control Valve (for Outriggers) ......................24 1. Structure and function.............................. 24 2. If the solenoid inside the unloading valve burns out ...... 28 3. Replacing and adjusting the reed switch............................. 29 3.1 Removing the reed switch.........................29
ii 3.2 Installing the reed switch .......................... 29 3.3 Operational check after switch replacement .................... 30 3.4 Adjusting switch shifting points (by shim adjustment).......................... 31 B-5 Center Joint .................................... 32 1. Structure .................................................. 32 1.1 General view............................................. 32 1.2 Brush Assy................................................ 34 2. Replacing the potentiometer .................... 37 3. Replacing a brush .................................... 41 4. Operation check after assembly .............. 44 5. Potentiometer specification...................... 44
B-1 B-1 Hydraulic Pump (for PTO) 1 W101-0191E B-1 Hydraulic Pump (for PTO) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1. Retaining ring 2. Oil seal 3. Gasket 4. Side plate 5. Body 6. Washer 7. Hexagon socket head bolt 8. Drive gear 9. Front cover 10. Bush 11. Driven gear 12. Gasket 13. Backup strip 14. Rear cover Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m Suction port G1 97--119 9.9--12.1 Discharge port G1/2 29.4--35.4 3.0--3.6 Hexagon socket head bolt [7] M12 98--108 10--11 Fixing bolt M10 33--37 3.35--3.75
2 W101-0191E B-1. B-1. Hydraulic Pump (for PTO) 2. Removal and installation [NOTICE] ◆When replacing the pump, make sure that the revolving direction of the new pump is same as the old ones. (The revolving direction stamped on the rear cover of the pump assumes the view from the end of the revolution axis.) IW101-005501 3. Disassembly and assembly 3.1 Replacing the oil seal 1. Remove the hexagon socket head bolt [7], and take away the front cover [9]. 2. Detach the retaining ring [1] from the front cover [9], and remove the oil seal [2]. 3. Install a new oil seal in the front cover [9] and fix it using a retaining ring [1]. 4. Pack grease (COSMOGREASE DYNAMAX No.3 or equivalent), between the lips of oil seal [2]. 5. Wind a tape around the splines of the drive gear [8] to prevent damage to the lip of the oil seal [2]. Then attach the front cover [9] and fix it using a hexagon socket head bolt [7]. 3.2 Replacing the gaskets and backup strip 1. Remove the hexagon socket head bolt [7], and take away the front cover [9]. 2. Detach the gaskets [3, 12] from and backup strip [13] from the front cover [9] and the side plate [4]. 3. Install new gaskets [3, 12] and a backup strip. Then attach the front cover and fix it using a hexagon socket head bolt [7]. 4. Replace the gaskets and backup strip on the rear cover according to the above 1.--3. 4. Precautions after replacing the pump 1. Before starting the pump, check the revolution direction and pipings again. If the revolution direction is contrary, the inlet and outlet become reversed. This may cause the oil seal to run out and lead to a failure. 2. Fill the piping on the suction side sufficiently with oil beforehand. When starting the pump, operate it slowly. Do not operate it at a high speed or high pressure. When the pump starts, air bubbles exist in the pipings. Bleed the pipings completely. Before bleeding is complete, operate the pump at a low pressure (if possible, with no load) to run in the pump. 3. After the run-in is completed, increase the load gradually up to the one for actual operation. Before starting actual operation, check for any abnormalities such as oil temperature. △ 1 366-533-90000 △ 0 366-533-30000 △ 0 366-531-10000 △ 1 366-522-90000 Do not touch the areas other than specified in this section. Never move the gears inserted in the body. If the gear is pulled out of the body, the mesh position of the teeth will change and the pump may fail to work sufficiently. The cover and the body are made of aluminium alloy and easy to be scratched. Handle them with care. Do not leave any oil or grease on the mating faces of the cover and body.
B-2 B-2 Manual Control Valve (for Bucket) 3 W113-0490E B-2 Manual Control Valve (for Bucket) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. ◆A sextuple valve is mentioned here as an example in this section. For triple, quadruple and quintuple valves, skip the description of unnecessary blocks. 1. Structure External view
B-2 B-2 Manual Control Valve (for Bucket) 4 W113-0490E 1. Cover Assy 2. Plug Assy 3. Stud bolt 4. Valve Assy 5. Valve Assy 6. Valve Assy 7. Valve Assy 8. Valve Assy 9. Valve Assy 10. Relief valve
B-2 B-2 Manual Control Valve (for Bucket) 5 W113-0490E 2. Function 1. This valve is a directional control valve, which shifts the pressurized oil from the hydraulic pump by the spool and sends it to the actuators concerning the following operation: ・Bucket swing ・Bucket elevation ・Winch ・Jib elevation ・Jib swing ・Attachment (booster, hydraulic power takeout) 2. The valve incorporates a port relief valve, check valves and reed switches. 2.1 Port relief valve The valve is in the block for attachment control. It restricts the maximum pressure of the oil sent to the attachment (booster or hydraulic power takeout) to prevent damage to the hydraulic components. ・Valve set pressure: 13.7 MPa [140 kgf/cm 2 ] 2.2 Check valve This valve is in each block except the block for winch control. It prevents malfunction of the actuator caused by the backward flow of oil due to internal pressure of the actuator. Hydraulic symbol
B-2 B-2 Manual Control Valve (for Bucket) 6 W113-0490E 3. Reed switch 3.1 Removing the reed switch 1. Detach the connector, and cut off the cable tie which binds the cables. 2. Loosen the hexagon socket head bolts (M4×15, 2 pcs.), and remove the shim and reed switch. 3. Remove the coating on the switch mounting surface or shim surface which sticks out of the surface. ・Switch mounting surface ・Shim surface [NOTICE] Do not discard the shim because you must use it again. 3.2 Installing the reed switch 1. Measure the thickness of the removed shim piece to prepare the adjustment described in the "Adjusting switch shifting points" section. One of the following shims is installed. ・0.3-mm thick (Part No.: 366-364-35090) ・0.5-mm thick (Part No.: 366-364-35100) ・0.7-mm thick (Part No.: 366-364-35110) 2. Prepare a new reed switch. [NOTICE] ◆Reed switches of a-contact type and b-contact type are available. To avoid using a wrong switch, check the color of the lead wire cover. A b-contact type reed switch has a lead wire covered in black. 3. Attach the shim and a new reed to the valve using hexagon socket head bolts (M4×15, 2 pcs.) Tightening torque: 2.94 N-m {0.3 kgf-m}
B-2 B-2 Manual Control Valve (for Bucket) 7 W113-0490E 3.3 Operational check of reed switch Make sure that the reed switch shifts as listed below when the corresponding spool of the upper control valve is moved. If it does not move as listed below, adjust the switch according to the "Adjusting switch shifting points" section later. [NOTICE] ◆Reed switches of a-contact type and b-contact type are available. To avoid using a wrong switch, check the color of the lead wire cover. A b-contact type reed switch has a lead wire covered in black. ◆"White", "black" and "red" in the list below represent the color of the cable cover from the switch. (See the wiring diagram below.) Type Color When spool is pulled out (Amount: 0.6--2.1 mm) When spool is in neutral When spool is pushed in (Amount: 0.6--2.1 mm) White--Black Turns from ON into OFF. OFF OFF a-contact type Red--Black OFF OFF Turns from OFF into ON. White--Black Turns from OFF into ON. ON ON b-contact type Red--Black ON ON Turns from ON into OFF. Note: "ON" in the list means the closed circuit; "OFF" means the open circuit. ・Connector No. and type of the reed switch for each valve block Valve block Bucket swing Bucket elevation Winch Jib elevation Jib swing Attachment Type of reed switches a-contact a-contact b-contact a-contact b-contact a-contact Connector No. 70 71 72 73 74 75 Detail of connectors Wiring diagram of the detector switches ・a-contact type ・b-contact type
B-2 B-2 Manual Control Valve (for Bucket) 8 W113-0490E Spool position Closed/open condition between contacts (Unit: mm) ・a-contact type ・b-contact type
B-2 B-2 Manual Control Valve (for Bucket) 9 W113-0490E 3.4 Adjusting switch shifting points (for a-contact type) If the shifting points of the detector switch (reed switch) are improper, adjust and correct them. You can adjust the shifting position by changing the thickness of the shims inserted between the switch and the valve. Change the shim thickness and adjust the shifting position of the switch in the following procedures. Shims of 3 types are available. ・0.3-mm thick (Part No.: 366-364-35090) ・0.5-mm thick (Part No.: 366-364-35100) ・0.7-mm thick (Part No.: 366-364-35110) Usually replacing 1 piece of shim is enough for adjustment. Adjustment using shim Case 1. The neutral position of the reed switch is deviated toward the pushed-in position of the spool. ・Wiring between white and black is closed while the pulled-out amount of the spool exceeds 2.1 mm or ・Wiring between red and black is open while the pushed-in amount of the spool is less than 0.6 mm. Procedure: Replace the shim with a thicker one. (If a shim 0.5 mm thick is used, replace it with the one 0.7 mm thick.) Case 2. The neutral position of the reed switch is deviated toward the pulled-out position of the spool. ・Wiring between white and black is open while the pulled-out amount of the spool is less than 0.6 mm or ・Wiring between red and black is closed while the pushed-in amount of the spool is exceeds 2.1 mm. Procedure: Replace the shim with a thinner one. (If a shim 0.5 mm thick is used, replace it with the one 0.3 mm thick.) Ex.: The wiring between white and black becomes open when the pulled-out amount of the spool is 0.5 mm, and the wiring between red and black becomes closed when the pushed-in amount of the spool is 2.2 mm.
10 W113-0490E B-2. B-2. Manual Control Valve (for Bucket) 3.5 Adjusting switch shifting points (for b-contact type) If the shifting points of the detector switch (reed switch) are improper, adjust and correct them. You can adjust the shifting position by changing the thickness of the shims inserted between the switch and the valve. Change the shim thickness and adjust the shifting position of the switch in the following procedures. Shims of 3 types are available. ・0.3-mm thick (Part No.: 366-364-35090) ・0.5-mm thick (Part No.: 366-364-35100) ・0.7-mm thick (Part No.: 366-364-35110) Usually replacing 1 piece of shim is enough for adjustment. Adjustment using shim Case 1. The neutral position of the reed switch is deviated toward the pushed-in position of the spool. ・Wiring between white and black is open while the pulled-out amount of the spool exceeds 2.1 mm or ・Wiring between red and black is open while the pushed-in amount of the spool is less than 0.6 mm. Procedure: Replace the shim with a thicker one. (If a shim 0.5 mm thick is used, replace it with the one 0.7 mm thick.) Case 2. The neutral position of the reed switch is deviated toward the pulled-out position of the spool. ・Wiring between white and black is open while the pulled-out amount of the spool is less than 0.6 mm or ・Wiring between red and black is closed while the pushed-in amount of the spool is exceeds 2.1 mm. Procedure: Replace the shim with a thinner one. (If a shim 0.5 mm thick is used, replace it with the one 0.3 mm thick.) △ 0 366-385-00000 △ 0 366-384-70000 △ 0 366-384-80000 △ 0 366-384-90000
B-3 B-3 Proportional Solenoid Valve 11 W136-0350E B-3 Proportional Solenoid Valve [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure Hydraulic symbol External view Detail of solenoid for unloading valve
B-3 B-3 Proportional Solenoid Valve 12 W136-0350E NOTICE] Do not take away the parts whose Nos. are marked with *. B-B section
B-3 B-3 Proportional Solenoid Valve 13 W136-0350E NOTICE] Do not take away the parts whose Nos. are marked with *. 101. End section (1) 102. End section (2) 122. Casing 151. Plug* (Do not take it away.) 152. Plug 153. Plug* (Do not take it away.) 154. Plug* (Do not take it away.) 155. Plug 156. Plug 158. Plug 161. O-ring 162. O-ring 163. O-ring 166. O-ring 181. Filter 182. Filter holder 201. End cover (1) 202. End cover (2) 203. Cover 204. Solenoid protective cover 251. Plug 254. Plug 255. Bleeder valve 258. Cap 257. Plug* (Do not take it away.) 261. O-ring 262. O-ring 263. O-ring 267. O-ring 268. O-ring 271. Hexagon socket head bolt 273. Hexagon socket head bolt 274. Hexagon socket head bolt 275. Setscrew with orifice 306. Spool 311. Spool 312. Spool 321. Spring 322. Spring 331. Spring seat 401. Spacer bolt 403. Spool pin 404. Lever pin 405. Control pin 406. Lever 407. Knob 408. Cap 410. Spring pin 411. Needle 461. O-ring 511. Seat (1) 512. Seat (1) 513. Steel ball 551. Plug 561. O-ring 562. O-ring 563. O-ring 611. Bleed-off compensator valve 612. Reducing valve 613. Meter-in compensator valve 614. Unloading valve 621. Spring 622. Spring 623. Spring 624. Spring 651. Plug 661. O-ring 872. Tie bolt 879. Nut 880. Spring washer 901. Solenoid proportional reducing valve 902. Solenoid 903. Harness A-A section
B-3 B-3 Proportional Solenoid Valve 14 W136-0350E Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-cm Remarks 152 G1/4 34--39 350--400 155, 158 R1/4 20--24 200--240 Apply a sealing tape. 251 G1/4 34--39 350--400 255 M7×1 2.5--3.4 25--35 Bleeder valve 271, 274 M5 5.9--7.8 60--80 273 M6 11--13 110--130 275 M4 1--1.4 10--14 Apply Loctite 241. 401 M8 15--20 150--200 Apply Loctite 241. 403 M8 15--20 150--200 Apply Loctite 241. 407 M6 2.5--3.4 25--35 Apply Loctite 241. 551 G3/8 69--78 700--800 651 G3/8 69--78 700--800 879 M10 39--44 400--450 901 (solenoid) M22×1 39--49 400--500 Solenoid proportional reducing valve 901 (nut) M6 6.9--7.8 70--80 Lock nut for adjuster screw 902 (solenoid) M20×1 39--49 400--500 Unloading solenoid 902 (nut) M16×1.5 6.9--8.8 70--90 Cap
B-3 B-3 Proportional Solenoid Valve 15 W136-0350E 2. Function This valve is a multi-control valve with pressure compensation function. It controls the solenoids in the solenoid proportional reducing valves, and thus controls the operational directions and speeds of the actuators. The function of each component is described below. Also see the "Hydraulic symbol" and "External view". 2.1 Bleed-off compensator valve (PC1) 1. Sends surplus oil to the PB port or T port. 2. During operation, it changes its relief pressure of the valves according to the pressure in the valve block whose load is highest among the valve blocks. 2.2 Meter-in compensator valve (PC2) Each valve changes its relief pressure according to the pressure in the corresponding valve block. 2.3 Shuttle valve Each valve selects the port whose pressure is higher. Finally the pressure from the highest port pressure is led to the bleed-off compensator valve (PC1). 2.4 Reducing valve (RDV1) This valve keeps the primary pressure of the solenoid proportional reducing valve at the constant pressure. 2.5 Solenoid proportional reducing valve This valve generates secondary pilot pressure according to the electronic input, and controls the stroke of the main control spool by the secondary pilot pressure. 2.6 Unloading valve 1. While the solenoid is not energized, this valve sends the oil from the P port or PB port to the T port. 2. While the solenoid is energized, the valve blocks the path to the T port to make the oil from the P port go to the PB port.
B-3 B-3 Proportional Solenoid Valve 16 W136-0350E 3. Disassembly 3.1 Disassembling the end section [101] 1. Remove the plugs [651] (3 pcs.) on the bottom of the end section, and remove the springs [621, 622, 624]. [NOTICE] ◆Do not open the plug [651] on the top of the block first. Otherwise the springs will extend and may damage the land. 2. Remove the plugs [651] (2 pcs.) on the top of the end section [101], and pull out the spools of the bleed-off compensator valve [611] and reducing valve [612] carefully. [NOTICE] ◆If a spool is inserted inversely during assembly, a failure may occur. Put marks on the spools to facilitate installation in correct orientation. 3. Remove the solenoids [101] on the top of the end section [101], and pull out the spool of the unloading valve [614] carefully. [NOTICE] ◆If a spool is inserted inversely during assembly, a failure may occur. Put marks on the spool to facilitate installation in correct orientation. 4. Remove the plug [152], and pull out the filter holder [182] using a pulling screw.
B-3 B-3 Proportional Solenoid Valve 17 W136-0350E 3.2 Removing the end covers [201, 202] 1. Loosen the hexagon socket head bolts [271] which fix the head covers [201, 202]. 2. Remove the end cover [202]. 3. While tilting the lever [406] toward the center of the casing [122], remove the end cover [201].
B-3 B-3 Proportional Solenoid Valve 18 W136-0350E 3.3 Disassembling the valve section 1. Pull the spool [306] carefully out of the casing [122]. Pull out other spools [311, 312] in the same way. [NOTICE] ◆If a spool is inserted inversely during assembly, a failure may occur. Put marks on the spools to facilitate installation in correct orientation. IW136-027012 101 879 872 102 306 122 312 311 2. Loosen and remove the bleeder valve [255], and take out the steel ball. 3. Loosen the hexagon socket head bolt [273], and take away the cover [203]. 4. Pull out the spring [623] and meter-in compensator valve [613] carefully. 5. Loosen the hexagon socket head bolts [274], and take away the solenoid protective cover [204]. 6. Turn the hexagonal section of the solenoid at which the width across the parallel side is 32 mm to remove the solenoid proportional reducing valve [901]. [NOTICE] ◆Do not disassemble the solenoid proportional reducing valve [901] further. Do not tamper with the adjuster screw to keep the correct setting.
B-3 B-3 Proportional Solenoid Valve 19 W136-0350E 3.4 Separating the end blocks from the casing Loosen the nuts [879] and pull out the tie bolts [872]. The end blocks [101, 102] will be separated from the casing [122]. IW136-027012 101 879 872 102 306 122 312 311 3.5 Disassembling the lever pin When you must disassemble the lever pin due to replacement of O-rings, prepare a suitable tool such as shown in the figure below.
B-3 B-3 Proportional Solenoid Valve 20 W136-0350E 4. Assembly [NOTICE] For the tightening torque for the bolts, see the "Thread size and tightening torque" in the "1. Structure" section. 4.1 Assembling the end sections and casing 1. Attach O-rings [161, 162] to the end section [101], and install the tie bolts [872]. [NOTICE] ◆Orient the face of the end section with the O-rings upward. IW136-027013 161 122 161 162 162 101 872 2. Attach O-rings [161, 162] to the casing [122]. 3. Pile the casing [122] and end section [102] on the end section [101]. Pay attention to their orientation. [NOTICE] ◆Orient the face of the end section with the O-rings upward. 4. After attaching a spring washer [880] to each tie bolt, attach a nut [879] to each tie bolt and tighten the nuts. Then change the orientation of the end sections and casing to make the A and B ports face upward. IW136-027014 122 101 102 879 880 5. While checking alignment of the end sections and casing, tighten the nuts [879].
B-3 B-3 Proportional Solenoid Valve 21 W136-0350E 4.2 Assembling the end section [101] 1. Attach an O-ring [661] to each plug [651]. 2. Screw the plugs [651] (2 pcs.) into the top face of the end section. 3. Screw the solenoid [902] into the end section. 4. Insert the bleed-off compensator valve [611], the spool of the reducing valve [612], the spool of the unloading valve [614] into the bottom face of the end section, paying attention to their orientation. After installing the spools, attach the springs [621, 622, 624] and screw in the plugs [651] (3 pcs.) [NOTICE] ◆Insert the spools in a correct orientation. If a spool is inserted inversely during assembly, a failure may occur. 5. Attach an O-ring [166] to the filter holder [182], and insert the filter holder into the end section. 6. Attach an O-ring [163] to the plug [152]. 7. Screw the plug [152] into the bottom face of the end section.
B-3 B-3 Proportional Solenoid Valve 22 W136-0350E 4.3 Assembling the valve section 1. Screw the plug [158] into the casing. 2. Insert the meter-in compensation valve [613] and spring [623] into the casing. 3. Attach an O-ring [267] to the cover [203], and attach the cover to the casing using a hexagon socket head bolt [273]. 4. Put a steel ball in the cover [203] and attach the bleeder valve [255]. 5. Screw the solenoid proportional reducing valve [901] into the casing. 6. Attach the solenoid protective cover [204] using hexagon socket head bolt [274]. 7. Insert the spools [306, 311, 312], paying attention to their orientation. [NOTICE] ◆Insert the spools in a correct orientation. If a spool is inserted inversely during assembly, a failure may occur. IW136-027012 101 879 872 102 306 122 312 311
23 W136-0350E B-3. B-3. Proportional Solenoid Valve 4.4 Installing the end cover [201, 202] 1. Attach O-rings [261, 262] to the end cover [201]. [NOTICE] ◆Apply grease to the O-rings beforehand. 202 262 268 201 261 271 271 405 262 IW136-027016 A B 2. While gradually raising the lever tilted on the valves, insert the end cover [201]. [NOTICE] ◆Do not let the O-ring drop. 3. Make sure that the control pin [405] is engaged with the spool correctly. Then screw in the hexagon socket head bolt [271]. 4. Attach O-rings [262, 268] to the end cover [202]. Then fix the end cover using a hexagon socket head bolt [271]. △ 1 366-414-30000
B-4 B-4 Manual Control Valve (for Outriggers) 24 W113-0234E B-4 Manual Control Valve (for Outriggers) 1. Structure and function 1. In this integrally assembled directional valve, 4 selector valves (4 valve blocks), a selector valve (cross section B--B), a pilot check valve, a relief valve and an unloading valve are placed and fixed in series. 2. It delivers pressurized oil to the extension cylinders and jack cylinders to extend or retract them. 3. The oil from the pump goes to the P port. While the spools of the selector valve are in the neutral position, all the pressurized oil goes to the hydraulic components on the upper structure through the C port. 4. When the spool of a selector valve is shifted toward the EXT. or RET. side, the pressurized oil is sent to the P port or A1 port of each valve block among S1--S4. 5. The A2 through A5 and B2 through B5 ports are connected to the jack cylinders and extension cylinders. 6. When the spool of a selector valve is shifted toward EXT., the oil is sent to the corresponding cylinder by the shifted spool in the selector valve. When the spool of a selector valve is shifted toward RET., the valve sends the oil returning from each cylinder through the T port to the tank. 7. In this way this valve can extend and retract any cylinders for the outriggers steplessly. This valve also incorporates the relief valve (RV1) which controls the rated operating pressure for each cylinder, unloading valve (SOL1E) which halts operation in case of emergency, and the pilot check valve which prevents spontaneous extension of each cylinder while the machine is in traveling configuration. 8. If an emergency stop signal is output from the AMC3 (working range restriction is activated, emergency stop switch is operated, the foot switch is released, an error occurs in the solenoid control valve, etc.), the unloading valve (SOL1E) opens, because the power is turned off and the solenoid in the valve is deenergized, letting the spring push back the pilot spool. Then the oil from the pump goes through RV1 into the tank directly. This halts the operation of the aerial platform.
B-4 B-4 Manual Control Valve (for Outriggers) 25 W113-0234E
B-4 B-4 Manual Control Valve (for Outriggers) 26 W113-0234E
B-4 B-4 Manual Control Valve (for Outriggers) 27 W113-0234E 1. Relief valve Assy 2. Unloading valve Assy 3. Pilot check valve 4. Valve block Assy 5. End cover 6. Bolt 7. Nut 8. Cap nut 9. Solenoid Assy 10. Margin for adjustment 11. Pilot spool 12. O-ring 13. Spring 14. Check valve 15. O-ring 16. Pilot valve 17. O-ring 18. Plug 19. O-ring 20. Socket Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m Pressure gauge G(PF) 1/4 24.5--29.4 2.5--3.0 A2--A5 B2--B5 G(PF) 3/8 39.2--49.0 4.0--5.0 P,T,C,A1 G(PF) 1/2 58.8--68.6 6.0--7.0 G(PF) 1/8 9.8--14.7 1.0--1.5 M18 39.2--49.0 4.0--5.0 Accessory valve, plug M22 58.8--68.6 6.0--7.0 Assembling bolt M8 18.6--20.5 1.9--2.1 End of valve rod M8 17.6--19.5 1.8--2.0 Margin for adjusting relief valve M14 18.6--20.5 1.9--2.1 Hexagon socket head bolt M6 9.8--10.8 1.0--1.1 Reed switch M4 2.9 0.3 Unloading valve Distance between parallel sides: 19 2.9--3.9 0.3--0.4 Socket [20] 29.4--39.2 3.0--4.0
B-4 B-4 Manual Control Valve (for Outriggers) 28 W113-0234E 2. If the solenoid inside the unloading valve burns out [NOTICE] Perform the procedure described below only in emergency. After the push screw is tightened, the condition of this control valve changes into the on-load state (that is, pressurized oil from the pump is sent to the selector valves), and the automatic stop by various safety system fails to work. When the cause which requires the following procedure is eliminated, immediately loosen the push screw to the original position. If the solenoid inside the unloading valve (SOL1E) burns out, the valve always unloads the circuit (that is, pressurized oil from the tank is returned to the tank directly), making operation of the aerial platform impossible. Change the valve condition to on-load state according to the following procedures: Unloading valve: type A 1. Loosen and remove the cap nut on the top. (Cap nut: M4) 2. Tighten the push screw slightly. (Use a flatblade screwdriver.) 3. When the push screw presses the inside (movable core), the pilot spool is pushed via the movable core and the push pin. Thus the valve condition turns into the on-load state. Unloading valve: type B 1. Loosen and remove the cap nut on the top. (Cap nut: M3) 2. Tighten the push screw slightly. (Use a 1.5-mm Allen wrench.) 3. When the push screw presses the inside (movable core), the pilot spool is pushed via the movable core and the push pin. Thus the valve condition turns into the on-load state. The above procedures turn the solenoid valve into the on-load state, making operation of the aerial platform available.
B-4 B-4 Manual Control Valve (for Outriggers) 29 W113-0234E 3. Replacing and adjusting the reed switch [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 3.1 Removing the reed switch 1. Detach the connector, and cut off the cable tie which binds the cables. 2. Loosen the hexagon socket head bolts (M4×15, 2 pcs.), and remove the shim and reed switch. 3. Remove the coating on the switch mounting surface or shim surface which sticks out of the surface. ・Switch mounting surface ・Shim surface [NOTICE] Do not discard the shim because you must use it again. 3.2 Installing the reed switch 1. Measure the thickness of the removed shim piece to prepare the adjustment described in the "3.4 Adjusting switch shifting points (by shim adjustment)" section. One type of the following shims is provided. ・0.3-mm thick (Part No.: 366-364-35090) ・0.5-mm thick (Part No.: 366-364-35100) ・0.7-mm thick (Part No.: 366-364-35110) 2. Prepare a new reed switch. [NOTICE] ◆Make sure that the cover of the lead wire is black. ・b-contact type (Lead wire is covered in black.) (Part No.: 366-364-35130) 3. Attach the shim and a new reed to the valve using hexagon socket head bolts (M4×15, 2 pcs.) Tightening torque: 2.94 N-m {0.3 kgf-m}
B-4 B-4 Manual Control Valve (for Outriggers) 30 W113-0234E 3.3 Operational check after switch replacement After replacement of a reed switch, make sure that the reed switch shifts as listed below when the pulled-out or pushed-in amount (stroke) of the corresponding spool is 0.6--2.1 mm. ("White", "black" and "red" in the list below represent the color of the cable cover from the switch. See the wiring diagram below.) If it does not move as listed below, the shifting position of the reed switch is deviated. Adjust the switch according to the "Adjusting switch shifting points (by shim adjustment)" section later. Type Color When spool is pulled out (Amount:0.6--2.1 mm) Neutral When spool is pushed in (Amount:0.6--2.1mm) White--Black Turns from ON into OFF. ON ON b-contact type (Lead wire is covered in black.) Red--Black ON ON Turns from ON into OFF. Note: "ON" in the list means the closed circuit; "OFF" means the open circuit. Spool position Wiring diagram of the reed switch (b-contact type) Closed/open condition between contacts (Unit: mm)
31 W113-0234E B-4. B-4. Manual Control Valve (for Outriggers) 3.4 Adjusting switch shifting points (by shim adjustment) If the shifting points of the reed switch are improper, adjust and correct them. You can adjust the shifting position by changing the thickness of the shims inserted between the switch and the valve. Change the shim thickness and adjust the shifting position of the switch in the following procedures. Shims of 3 types are available. ・0.3-mm thick (Part No.: 366-364-35090) ・0.5-mm thick (Part No.: 366-364-35100) ・0.7-mm thick (Part No.: 366-364-35110) Usually replacing 1 piece of shim is enough for adjustment. Adjustment using shim Case 1. The shifting point of the reed switch is deviated toward the pushed-in position of the spool. ・Wiring between white and black is open while the pulled-out amount of the spool exceeds 2.1 mm or ・Wiring between red and black is open while the pushed-in amount of the spool is less than 0.6 mm. Procedure: Replace the shim with a thicker one. (If a shim 0.5 mm thick is used, replace it with the one 0.7 mm thick.) Case 2. The shifting point of the reed switch is deviated toward the pulled-out position of the spool. ・Wiring between white and black is open while the pulled-out amount of the spool is less than 0.6 mm or ・Wiring between red and black is closed while the pushed-in amount of the spool is exceeds 2.1 mm. Procedure: Replace the shim with a thinner one. (If a shim 0.5 mm thick is used, replace it with the one 0.3 mm thick.) △ 3 366-374-90000
B-5 B-5 Center Joint 32 W181-0530E B-5 Center Joint [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1.1 General view [NOTICE] ◆When installing the brush Assy, apply Grease SR2 to the body [1], the top face of the core [9] (hatched area C in the figure) for rust prevention (except for the mounting surface for the brush Assy). ◆Apply ThreeBond 1215 to the D section (surface mating the brush Assy to prevent permeation of water. ◆After assembly, the positional relation among the brush Assy [2], the punch mark on the body [1] and the hydraulic ports shall be as shown in the figure.
B-5 B-5 Center Joint 33 W181-0530E 1. Body 2. Brush Assy 3. Bolt 4. Spring washer 5. Spring pin 6. Spacer 7. Cover 8. Plain bearing 9. Core 10. Packing 11. Ring seal 12. Cap 13. Grease nipple 14. Retaining ring Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m P G3/8 49.0 5.0 G1/4 29.4 3.0 D G3/8 49.0 5.0 G1/4 29.4 3.0 Body T G1/2 98.0 10.0 P G1/2 98.0 10.0 D G3/8 49.0 5.0 Core T G1/2 98.0 10.0 Bolt [3] M8 12--14 1.2--1.4 Grease nipple [13] R1/8 7.8--10.6 0.8--1.08 △ 1 426-308-91000 △ 2 426-308-90000
B-5 B-5 Center Joint 34 W181-0530E 1.2 Brush Assy (with no angle sensor to detect swing blind spot) ・Contact a TADANO distributor or dealer for ordering contact-point activator. Part No.: 999-900-41794 (Quantity: 20 cm 3 ) View A Detail of B (waterproofing of grommet) △ 0 424-418-73001
B-5 B-5 Center Joint 35 W181-0530E 1. Nameplate 2. Housing 3. O-ring 4. Base 5. Spacer 6. Shaft base 7. Holder 8. Bush 11. Coupling Assy 12. Bearing A 13. Bearing B 14. Brush table (bottom) 15. Brush table (filler) 16. Brush table (upper) 17. Washer 18. Machine screw 19. Machine screw 20. Machine screw 21. Bolt 22. Spring washer 23. Plain washer 24. Cover 25. Potentiometer 26. Setscrew 27. Guide plate 28. Arm Assy 29. Latch 30. Machine screw 31. Potentiometer bracket 32. Terminal insulating plate 33. Slip ring 34. Insulating plate 35. Faston terminal 36. Brush Assy 37. Grommet 38. Clamp 39. Machine screw 40. Clamp seat 41. Hexagon socket head bolt 42. Spring washer 45. Pin 46. Stud 48. Bush 50. Spring washer View C
B-5 B-5 Center Joint 36 W181-0530E 11 3 3 10 2 2 9 1 1 8 4 4 7 3 3 6 2 2 5 1 1 4 4 4 3 3 3 2 2 2 1 1 1 CNR2 CNR3 CNR1 CNR13 CNR12 13 2 2 12 1 1 CNR4 CNR14 CNR11 IW181-031004E P1 P2 CNR5 6 2 3 1 2 3 1 5 4 2 3 1 B A C - out + - out + E D F Potentiometer Spacer Spacer (male) (female) (female) (male) (female) (male) (female) (male) (male) No. Color 1 R 2 B 3 L 4 W 5 Y 6 Br 7 G 8 Gy 9 O 10 W/R 11 W/B 12 G/W 13 L/R A R B B C L D W E Y F Br IW181-019002E 23 1 11 10 7 6 3 12 8 4 9 5 12 4 3 2 1 21 3 3 4 1 2 2 1 1 2 P3 male P12 male P4 male P3 female P4 female P2 male P2 female Connection diagram Connector pin arrangement (viewed from the mating end)
B-5 B-5 Center Joint 37 W181-0530E 2. Replacing the potentiometer 1. Remove the sealing compound around the cover with a pointed tool such as a toothpick. [NOTICE] The sealing compound is applied at the depression on the housing where the cover is engaged. 2. Remove the hexagonal bolts M5 (4 pcs.), and detach the cover from the housing. If the sealant hinders the cover to be removed, put a screwdriver in a bolt hole. Then hit it with a hammer to turn and remove the cover. [NOTICE] Do not let the sealant attached to the cover fall in flakes into the housing. If a flake is in the housing, always remove it because it may cause poor contact. Scrape the sealant completely because silicone will be applied during reassembly. Before scraping off the sealant remaining on the cover and housing, put a plastic bag, etc. in the housing to catch falling flakes. 3. Remove the M4 machine screw (1 pc.) to detach the cable clamp. Then cut the potentiometer wiring at the root where epoxy resin is filled up. [NOTICE] As the cable will be reused by soldering, cut the cable as close as possible to the epoxy resin.
B-5 B-5 Center Joint 38 W181-0530E 4. Remove the M4 machine screws (3 pcs.) to detach the potentiometer and potentiometer bracket. [NOTICE] As the arm Assy is installed to the potentiometer shaft, lift the potentiometer bracket upward when removing it. 5. Remove the M3 setscrews (2 pcs.) to detach the arm Assy from the potentiometer. 6. Remove the M3 machine screws (2 pcs.) and latches (2 pcs.) to detach the potentiometer from its bracket. 7. Temporarily install a new potentiometer to the potentiometer bracket using M3 machine screw (2 pcs.) and latches (2 pcs.) [NOTICE] As the potentiometer needs to be adjusted after installation, just temporarily attach it by allowing it to turn slightly. 8. Fix the arm Assy on the potentiometer shaft using M3 setscrews (2 pcs.) Before fixing the arm Assy, turn the shaft so that the resistance between 1--2 in the potentiometer P1 is 758±10 Ω when the arm Assy is directed as shown in the figure below. Then fix the shaft with setscrews. [NOTICE] Before fixing the arm Assy, place the terminals at suitable position to facilitate soldering cables.
B-5 B-5 Center Joint 39 W181-0530E 9. Put a potentiometer bracket on the studs, and fix it using M4 machine screws (3 pcs.) avoiding the position of cable clamp. Place the bracket to fit the pin within the slit of the arm Assy. [NOTICE] If the pin is out of the slit of the arm Assy, correct swing angle will not be output. 10.Solder cables to the potentiometer terminals according to the wiring table below. [NOTICE] When soldering the cables, do not touch a soldering iron to the terminals continuously for 5 seconds or longer. Otherwise the potentiometer may be damaged. Do not short-circuit terminals. ・Wiring table Terminal No. on potentiometer Signal name Color Terminal No. on connector P1-1 - Black 6 P1-2 OUT Red 5 P1-3 + Blue 4 P2-1 - Yellow 2 P2-2 OUT White 3 P2-3 + Brown 1 11. Apply voltage of 5 V to the terminals 4--6 of the connector (CNR5; 12-pin) for the potentiometer. Then turn the potentiometer body to make the voltage between the terminals 5 and 6 within 3.79 ± 0.002 V. [NOTICE] If the supply voltage is other than specified, the result of adjustment becomes incorrect accordingly. This adjustment assumes configuration for index point.
B-5 B-5 Center Joint 40 W181-0530E 12.Coat the potentiometer terminals with epoxy resin, and fully tighten the M3 machine screws. [NOTICE] Cover the terminals fully with the resin. If a terminal is exposed to the ambient air, it may be corroded. 13. Fix the cables with cable clamps. Reassemble the whole assembly in the reverse order of disassembly. Before applying silicone sealant between the cover and housing, fix the cover using bolts first. Then fill the circular gap with silicone sealant by rubbing it into the gap. Use silicone sealant KE4898 (Shin-etsu Chemical) or equivalent. [NOTICE] If a residue of silicone sealant remains at the time of new sealant application, sealing performance may be deteriorated. Before applying new silicone sealant, make sure that the previous sealant has been completely removed. (Do not coat silicone sealant on remaining silicone.)
B-5 B-5 Center Joint 41 W181-0530E 3. Replacing a brush 1. Remove the sealing compound around the cover with a pointed tool such as a toothpick. [NOTICE] The sealing compound is applied at the depression on the housing where the cover is engaged. 2. Remove the hexagonal bolts M5 (4 pcs.), and detach the cover from the housing. If the sealant hinders the cover to be removed, put a screwdriver in a bolt hole. Then hit it with a hammer to turn and remove the cover. [NOTICE] Do not let the sealant attached to the cover fall in flakes into the housing. If a flake is in the housing, always remove it because it may cause poor contact. Scrape the sealant completely because silicone will be applied during reassembly. Before scraping off the sealant remaining on the cover and housing, put a plastic bag, etc. in the housing to catch falling flakes. 3. Remove the M4 machine screw (1 pc.) to detach the cable clamp. 4. Remove the M4 machine screws (3 pcs.) to detach the potentiometer and potentiometer bracket. [NOTICE] Remember that the cables remain connected to the potentiometer. Handle the potentiometer with care. As the arm Assy is installed to the potentiometer shaft, lift the potentiometer bracket upward when removing it.
B-5 B-5 Center Joint 42 W181-0530E 5. Remove the M4 machine screws (4 pcs.) to detach the guide plate. 6. Remove the hexagonal bolts M5 (4 pcs.), and detach the housing. [NOTICE] When removing the housing, pull it up vertically. 7. Pull out the Faston terminal connected to the brush to be replaced. [NOTICE] If you pull the cable to pull out the terminal, the wires in the cable may be broken. Always hold the terminal when you pull it out. 8. Remove the M4 machine screws (2 pcs.) which fix the brush to be replaced. When removing the machine screws, press the brush holders from the top. [NOTICE] If you remove the machine screws without pressing the brush holders from the top, the brush Assys will fall apart, because the brush holders are not connected with one another and are easy to fall. 9. Pull the brush Assy out of the brush holders. [NOTICE] Pull the brush Assy straight.
B-5 B-5 Center Joint 43 W181-0530E 10. Prepare a new brush. [NOTICE] When putting a brush between the brush holders, put it in a correct position and correct orientation. 11.Install a brush Assy in the reverse order of the removal. If the brush touches a wrong ring, pull out the brush Assy and install it again. [NOTICE] When installing a brush Assy, prevent it from interfering with another brush (that is, short circuit with another brush). When eliminating interference with another brush, do put pull or bend the brush. Otherwise the brush will be deformed and become unusable. 12. Fix the brush Assy using M4 machine screws (2 pcs.) (See the steps 7 and 8.) 13. Wipe off contact-point activator remaining on the ring. Then apply new contact-point activator. Apply appropriate amount of contact-point activator according to the figure below. Contact a TADANO distributor or dealer for ordering contact-point activator. [NOTICE] After replacing a brush, always apply new contact-point activator. Wipe off previous contact-point activator as far as possible. Use a clean lint-free rag for wiping. 14. Connect a Faston terminal to the terminal leading to the new brush. [NOTICE] Insert a Faston terminal up to the base of the terminal leading to the brush. 15. Reassemble the whole assembly in the reverse order of disassembly. Before applying silicone sealant between the cover and housing, fix the cover using bolts first. Then fill the circular gap with silicone sealant by rubbing it into the gap. Use silicone sealant KE4898 (Shin-etsu Chemical) or equivalent. [NOTICE] If a residue of silicone sealant remains at the time of new sealant application, sealing performance may be deteriorated. Before applying new silicone sealant, make sure that the previous sealant has been completely removed. (Do not coat silicone sealant on remaining silicone.)
44 W181-0530E B-5. B-5. Center Joint 4. Operation check after assembly After assembling the brush Assy, conduct the operational check described in 1. and 2. below to make sure that the potentiometer has been appropriately installed. 1. Place the base and coupling as shown in the figure below. Then check that the resistance between the output terminal and the ground terminal (5--6 of CNR5) of the potentiometer P1 increases as the potentiometer is turned clockwise. ・The figure below shows the brush Assy from the coupling side (that is, the bottom view of the brush Assy. P1 P2 CNR5 6 2 3 1 2 3 1 5 4 2 3 1 9 8 7 B A C - out + - out + E D F G H I IW181-005009E + Potentiometer (male) 2. Turn the coupling to make its direction relative to the base as shown in the above figure. While applying voltage to between the power supply terminal and ground terminal (4--6 of CNR5) of the potentiometer P1, check that the voltage between the output terminal and the ground terminal (5--6 of CNR5) is within the range listed below. Voltage applied to 4--6 of CNR5 Voltage between 5--6 of CNR5 4.5 V 3.410 ± 0.002 V 5.0 V 3.790 ± 0.002 V 5. Potentiometer specification Effective electrical angle 0--350 +1° -2° Total resistance 1kΩ±15% Linearity ± 0.1% △ 2 426-308-90000
i C Outrigger System Contents C-1 Pilot Check Valve (for Jack Cylinder) ................... 1 1. Structure .................................................... 1
C-1. C-1. Pilot Check Valve (for Jack Cylinder) 1 W115-0660E C-1 Pilot Check Valve (for Jack Cylinder) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1.Valve Body 2.Cap seal 3.Piston 4. --- 5.Sleeve 6.O-ring 7.Backup ring 8.Check valve 9.O-ring 10.Spring 11.Plug 12.O-ring Thread size and tightening torque Tightening torque Sign / port Thread size N-m kgf-m ft-lbf A G1/4 29.4 3 22 B G1/4 29.4 3 22 11 M24×1.5 98-118 10-12 72-87 Mounting bolt M8 23-27 2.4 - 2.8 17.7 - 20 AB C D IW115-003001 △ 0 366-257-40001
i D Swing System Contents D-1 Hydraulic Motor (for Boom Swing)..................... 1 1. Structure .................................................... 1 2. Disassembly .............................................. 2 3. Reassembly ............................................... 2 D-2 Swing Speed Reducer (Boom Swing) .......................... 3 1. Structure .................................................... 3 2. Dismounting ............................................... 4 3. Reassembly ............................................... 4 D-3 Swing Assembly .............................. 5 1. Structure .................................................... 5 2. Reassembly ............................................... 6 2.1 Swing bearing............................................. 6 2.2 Swing speed reducer.................................. 6 D-4 Pilot Check Valve (for Boom Swing Circuit) ........ 7 1. Structure .................................................... 7
D-1 D-1 Hydraulic Motor (for Boom Swing) 1 W102-0104E D-1 Hydraulic Motor (for Boom Swing) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure A,B D 9-6 9-1 1 19 3 15 9-5 11 12 13 14 10 9 8 4 7 6 5 2 9-3 9-2 9-4 IW102-010201 1. Shaft 2. Bearing 3. Housing 4. O-ring 5. Oil seal cover 6. Oil seal 7. Retaining ring 8. Thrust plate 9. Cylinder barrel assy 9-1. Cylinder barrel 9-2. Plunger 9-3. Plunger bearing 9-4. Plunger spring 9-5. Retaining ring 9-6. Center spring 10. Valve plate 11. Bottom cover 12. Bearing 13. Pin 14. O-ring 15. Bolt 19. Key
2 W102-0104E D-1. D-1. Hydraulic Motor (for Boom Swing) Thread size and tightening torque Tightening torque Sign / port Thread size N-m kgf-m A G3/8 39.2 - 49.0 4.0 - 5.0 B G3/8 39.2 - 49.0 4.0 - 5.0 D G1/4 19.6 - 29.4 2.0 - 3.0 15 M10×35 29.4 - 34.3 3.0 - 3.5 Mounting bolt M12×35 68.6 - 82.4 7.0 - 8.4 2. Disassembly 1. Loosen the bolts (15) to separate the bottom cover (11) about 10 mm. This is necessary to prevent the shaft (1) from popping out by the force of the center spring (9-6). 2. Remove the retaining ring (7). 3. Insert the flat blade of a screwdriver into the slot of the oil seal cover (5) to remove the oil seal cover (5), together with the oil seal (6). [NOTICE] Do not pull out the shaft (1). As it is difficult to engage the male spline teeth of the shaft (1) with the female ones of the cylinder barrel (9-1), reassembly will be troublesome. 3. Reassembly 1. Make sure that the O-rings (4) and (14) are placed in position. 2. Apply grease to the lip area of the oil seal (6). Install the oil seal (6), together with the oil seal cover (5), into the housing (3). 3. Securely put the retaining ring (7) into the groove of the housing (3). [NOTICE] When putting the retaining ring (7), be sure to place the rounded edge inside (next to the bearing). If the rounded edge is place outside, there is a possibility that the retaining ring may come off because of an internal force such as spring force and hydraulic force. 4. Install the bottom cover (11) as before. △ 1 366-625-90000
D-2 D-2 Swing Speed Reducer (Boom Swing) 3 W511-0124E D-2 Swing Speed Reducer (Boom Swing) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 7654321 8,9 10 11 12 14 13 15 16 17 18 19,20 21 22,23 IW511-0124E01 (Oil drain port) 1. Spur gear 2. Sleeve 3. Oil seal 4. Gear case 5. Ball bearing 6. Key 7. Worm wheel 8. Bolt 9. Spring washer 10. Ball bearing 11. Retaining ring 12. Gear case 13. Tapered roller bearing 14. Worm 15. Tapered roller bearing 16. Shim set 17. Spacer 18. Retaining ring 19. dipstick 20. Seal washer 21. Plug 22. Nameplate 23. Rivet Thread size and tightening torque Tightening torque Sign / port Thread size N-m kgf-m 8 M10 35.3 - 42.2 3.6 - 4.3 21 R1/4 10.6 - 30.9 1.8 - 3.2 Mounting bolt M18 329 - 363 33.5 - 37
4 W511-0124E D-2. D-2. Swing Speed Reducer (Boom Swing) 2. Dismounting 3. Reassembly Application of thread locking agent Part Type of thread locking agent Remarks Sleeve (2) ThreeBond 1215 Applied for shrinkage fit. Oil seal (3) ThreeBond 1215 Applied to the periphery. Apply lithium-based grease to the lip area. Bolt (8) ThreeBond 1104 Applied to the tapped through hole. Gear case (12) ThreeBond 1104 Applied to the mating surface with the gear case (4). 1. As for the tapered roller bearings (13) and (15), adjust the axial play to 0.05 to 0.10 mm with the shim set (16). 2. Replenish fresh gear oil to the specified level through the screw hole of the dipstick (19). Gear oil : Mobil Gear 632 (Mobil) Quantity : 1.1 L Dipstick indication Remove the oil dipstick to check the oil level. When the dipstick is not screwed in, the oil level should be within the limits as shown below. If the level is low, add proper amount of oil through the screw hole for the dipstick. IW511-012102E Swing speed reducer Before removing the swing speed reducer, fasten the swing frame to the lower frame with wire ropes or the like so that the swing frame should not start to rotate freely. CAUTION △ 0 360-815-70000 △ 0 360-815-60000
D-3 D-3 Swing Assembly 5 W514-0400E D-3 Swing Assembly [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1. Swing bearing 2. Swing speed reducer 3. Bolt 4. Plain washer 5. Nut 6. Bolt 7. Set screw 8. Nut 9. Hexagon socket head bolt 10. Spring washer 11. Hydraulic motor 12. O-ring 13. Bolt 14. Plain washer 15. Bolt
6 W514-0400E D-3. D-3. Swing Assembly Thread size and tightening torque Tightening torque Thread Thread size N-m kgf-m Bolt 3 M18 329--363 33.5--37.0 Bolt 6 M12 19.6--23.5 2.0--2.4 Nut 8 M12 34.3--41.2 3.5--4.2 Hexagon socket head bolt 9 M12 69--82 7.0--8.4 Bolt 13 M16 240--265 24.5--27.0 Bolt 15 M16 240--265 24.5--27.0 2. Reassembly [NOTICE] Install the high strength plain washer, orienting its chamfer to the bolt head side as shown below. 2.1 Swing bearing 1. Mount the swing bearing on the lower frame, rotating the "S" mark from the carrier front by 10° clockwise. 2. Apply torque control agent to the threaded sections of the bolts-15 for inner ring and the bolts-13 for outer ring. 3. Install the high strength plain washer (4 and 14) with its chamfer facing the bold head. 2.2 Swing speed reducer 1. Apply thread locker (LOCTITE 262T) to the set screws (7). 2. After once making the backlash between gears 0 mm with the set screws (7), back off the two set screws by 1/16 turn and fix them. This results in the circular backlash 0.08 mm. 3. The bolts (6) are temporarily put before the swing speed reduce is installed. After installation of the swing speed reducer, they are adjusted. 4. The adjustment is made in the following way. First apply thread locker (LOCTITE 262T) to the bolts (6) and turn them until they hit the swing speed reducer. 5. Then with pushing the bolts (6) to the swing speed reducer, tighten the nuts (8) to the specified torque. △ 0 423-011-00000
D-4. D-4. Pilot Check Valve (for Boom Swing Circuit) 7 W115-0214E D-4 Pilot Check Valve (for Boom Swing Circuit) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure AB CD IW115-021001 C D B 987 6 354 1 2 A IW115-0212E01 10 Thread size and tightening torque Tightening torque Thread Thread size N-m kgf-m PortA,B,C,D G1/4 29.4 3.0 Plug 9 M24 74-83 7.5 - 8.5 Mounting bolt M10 23-27 2.35 - 2.65 1. Body 2. Piston 3. Housing 4. Poppet 5. Packing 6. Spring 7. O-ring 8. Stop pin 9. Plug 10. Spacer Hydraulic symbol △ 1 366-250-00000
i E Boom Elevating System Contents E-1 Counterbalance Valve (for Leveling Cylinder) ............ 1 1. Construction............................................... 1 E-2 Counterbalance Valve (for Elevating Cylinder) ........... 3 1. Construction............................................... 3 E-3 Select Valve (for Leveling Circuit) ............... 5 1. Construction............................................... 5 2. Reassembly ............................................... 6 E-4 Relief Valve (for Leveling Circuit) ............... 7 1. Construction............................................... 7
E-1 E-1 Counterbalance Valve (for Leveling Cylinder) 1 W119-0630E E-1 Counterbalance Valve (for Leveling Cylinder) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Construction
2 W119-0630E E-1. E-1. Counterbalance Valve (for Leveling Cylinder) 1. Body 2. Plug 3. O-ring 4. Plug 5. O-ring 6. Sleeve 7. Poppet 8. O-ring 9. Spring 10. Spring 11. Plug 12. Plug 13. O-ring 14. O-ring 15. Sleeve 16. Spool 17. O-ring 18.-- 19. O-ring 20. O-ring Thread size and tightening torque Tightening torque Sign / Port Thread size N-m kgf-m Plug [2] G1/8 19.6 2.0 Plug [4] and [11] G3/8 49.0 5.0 Plug [12] M22×1.5 245.2--274.6 25.0--28.0 PortAandB G1/4 29.4 3.0 Mounting bolt M8 25--29 2.6--3.0
E-2 E-2 Counterbalance Valve (for Elevating Cy linder) 3 W119-0591E E-2 Counterbalance Valve (for Elevating Cylinder) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Construction A C B Hydraulic symbol
4 W119-0591E E-2. E-2. Counterbalance Valve (for Elevating Cy linder) 1. Body 2. Plug 3. O-ring 4. Spool 5. Orifice 6. Check valve 7. Spring 8. Piston 9. O-ring 10. Spring 11. Cap 12. O-ring 13. O-ring 14. Backup ring 15. Cap 16. Plug 17. O-ring 18. O-ring 19. O-ring 20. Backup ring 21. Orifice 22. O-ring 23. Body 24. Plug 25. Check valve assy 26. Plug 27. O-ring 28. Hexagon socket head bolt 29. Orifice Thread size and tightening torque Tightening torque Sign / Port Thread size N-m kgf-m 2 -- 11.8±1 1.2±0.1 11 -- 196±10 20±1 15 -- 186±10 19±1 16 -- 8.8--9.8 0.9--1.0 24 HEX. 30 147±10 15±1 26 HEX. 30 147±10 15±1 28 -- 6--8 0.6--0.8 B G3/8 49.0±5 5.0±0.5 Mounting bolt M8 12.3--14.7 1.25--1.5 △ 0 366-064-50000
E-3 E-3 Select Valve (for Leveling Circuit) 5 W129-0111E E-3 Select Valve (for Leveling Circuit) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Construction 12 13 14 34 56 7 8 9 1,2 10 11 A2 A1B P N A1, B A2 P View N A2 A1 B P Apply sealant for waterproofing. Apply grease to sliding portions during assembly. Apply thread locker super to threads. Apply grease to threads. IW129-0110E01 1. Bolt 2. Spring washer 3. Needle 4. Holder 5. O-ring 6. Backup ring 7. Body 8. Poppet 9. Spring 10. O-ring 11. Plug 12. Knob 13. Plate 14. Machine screw Hydraulic symbol
6 W129-0111E E-3. E-3. Select Valve (for Leveling Circuit) 2. Reassembly During assembly, apply grease to the surface of the needle (3) and the sliding portions (threaded area and hole of 10 mm in diameter) of the holder (4). Thread size and tightening torque Tightening torque Thread Thread size N-m kgf-m Bolt (1) G1/4 29.4 3.0 Holder (4) G1/4 29.4 3.0 Plug (11) G3/8 49.0 5.0 Port A1 G1/4 29.4 3.0 Port A2 G1/4 29.4 3.0 Port B G3/8 49.0 5.0 Port P G3/8 49.0 5.0 △ 1 366-363-40000
7 W111-0342E E-4. E-4. Relief Valve (for Leveling Circuit) E-4 Relief Valve (for Leveling Circuit) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Construction 1. Body 2. Guide 3. Poppet 4. Plug 5. O-ring 6. Spring 7. Spacer 8. Plug Thread size and tightening torque Tightening torque Sign / port Thread size N-m kgf-m Plug (4) M33×1.5 167 17 Plug (8) R1/8 7.8--10.6 0.8--1.08 P1, P2, T G1/4 29.4±3 3.0±0.3 Mounting bolt M8 12.3--14.7 1.25--1.5 △ 1 366-066-70000 △ 1 366-066-50000 Hydraulic symbol IW111-034102 T P1 P2 △ 1 366-066-60000
i F Winch System Contents F-1 Winch ................................................ 1 1. Winch Assy ................................................ 1 1.1 General view............................................... 1 1.2 Main body ................................................... 2 1.3 Replacing oil seal of the winch motor......... 6 1.4 Performance confirmation test after disassembly and assembly of the motor .... 8 2. Support ...................................................... 9 2.1 General view............................................... 9 2.2 Adjusting the jib swing free/lock lever ...... 12 F-2 Hydraulic Motor (for Jib Swing) ....................... 13 1. Structure .................................................. 13 1.1 General view............................................. 13 1.2 Main body ................................................. 14 1.3 Counterbalance valve............................... 16 F-3 Pilot Check Valve (for Jib Elevating Cylinder) ................ 17 1. Structure .................................................. 17
F-1 F-1 Winch 1 W526-0430E F-1 Winch [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Winch Assy 1.1 General view △ 2 423-119-10100
F-1 F-1 Winch 2 W526-0430E 1.2 Main body Hydraulic symbol Main unit △ 1 423-119-17000
F-1 F-1 Winch 3 W526-0430E Drum rotational direction and oil flow direction Rotational direction (viewed from the control valve) Inlet port Outlet port Counterclockwise (hoist-up) B A Clockwise (hoist-down) A B △ 0 360-738-20000
F-1 F-1 Winch 4 W526-0430E △ 0 360-738-20000
F-1 F-1 Winch 5 W526-0430E 1. Drum 2. Spindle (*1) 3. Flange (*1) 4. RV gear (*2) 5. Shaft 6. Input gear 7. Spur gear (*3) 8.------ 9. Crank shaft (*2) 10. Bush 12. Retaining ring 13. Sleeve 14. Distance piece 15. Oil seal 16. Oil seal 17. Pin 18. Parallel pin 19. Hexagon socket head bolt 20. Bearing 21. Bearing 22. Bearing (*2) 23. Bearing (*2) 24. Retaining ring 25. Retaining ring 26. Retaining ring 27. O-ring 30. O-ring 33. Plug 34. Orifice 101. Rear flange (*4) 102. Shaft 103. Thrust plate 104. Cylinder block 105. Piston (*5) 106. Shoe (*5) 107. Retainer plate 108. Thrust ball 109. Timing plate 110. Washer 112. Piston 113. Spring 114. Spring 115. Friction disc 116. Mating disc 118. O-ring 119. O-ring 120. O-ring 121. O-ring 122. Spool (*4) 123. Plug 124. Stopper 125. Stopper 126. Spring 127. Spring 128. Orifice plug 129. Plug 130. Valve 131. Spring 132. Oil seal 133. Bearing 134. Bearing 135. Parallel pin 136. Parallel pin 137. Needle roller 138. Retaining ring 139. Hexagon socket head bolt 143. Retaining ring 199. Nameplate (*4) (*1) Parts comprising the spindle Assy (shown in the Figure B). When replacing the spindle Assy, replace all the parts marked with (*1). (*2) Parts comprising the RV gear Assy (shown in the Figure C). When replacing the RV gear Assy, replace all the parts marked with (*2). (*3) For replacement, replace the 2 pieces at the same time. (*4) Parts comprising the rear flange Assy (shown in the Figure D). When replacing the rear flange Assy, replace all the parts marked with (*4). (*5) Parts comprising the piston Assy (shown in the Figure E). When replacing the piston Assy, replace all the parts marked with (*5). Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m 19 M12 102±16 10.4 ± 1.6 33 R3/8 39±15 4.0 ±1.5 123 ― 196±25 20.0 ± 2.5 129 ― 78±5 8.0 ± 0.5 139 M8 29±5 3.0 ± 0.5
F-1 F-1 Winch 6 W526-0430E 1.3 Replacing oil seal of the winch motor [NOTICE] ◆Once disassembled, oil seals should be replaced with new ones. ◆When disassembling, matchmark every mating face of component to facilitate reassembly. 1. Remove the plug [33] and drain the gear oil. Then remove the flange [101]. 2. Send pressurized air into the duct hole for the mechanical brake of the spindle [2] until the piston [112] is protruded slightly out of the spindle [2]. [NOTICE] ◆Do not send pressurized air abruptly. Otherwise the piston may pop out of the spindle and create hazard. Reference Pressure of the air: 0.29--0.49 MPa {3--5 kgf/cm 2 } 3. Remove the cylinder block [104]. 4. Remove the drum [1]. [NOTICE] ◆Prevent the retaining ring [26] from being lost because it is necessary for adjusting clearance. ◆Pull the drum vertically upward. If it is pulled up obliquely, it cannot be pulled out because it will interfere with the component inside the winch. ◆While the drum is being pulled out, a pin [17] may drop off onto the surrounding area. When picking up the pin, do not use a sharp tool.
F-1 F-1 Winch 7 W526-0430E 5. Remove the oil seal [16]. 5-1.Apply a punch on the inner ring surface of the bearing [21] and hit the punch with a hammer. Hit all around the inner ring evenly and remove the bearing from the drum. 5-2.Apply a punch on the oil seal [16] and hit the punch with a hammer. Hit all around the oil seal evenly and remove the oil seal from the bearing. 6. Remove the oil seal [15]. 6-1.Apply a punch on the inner ring surface of the bearing [20] and hit the punch with a hammer. Hit all around the inner ring evenly and remove the bearing from the drum. 6-2.Thrust tools (2 pcs.) with flat and thin ends such as flathead screwdrivers between the oil seal [15] and the drum. Then pry the tools to remove the oil seal [15] from the drum.
F-1 F-1 Winch 8 W526-0430E 1.4 Performance confirmation test after disassembly and assembly of the motor 1 Warmup before test: Warm up the machine until the following conditions are obtained. ・Hydraulic oil temperature: 45--55°C ・Temperature at outer surface of speed reducer hub: 40--80°C 2 Confirmation test: Check the following points and qualify/disqualify the result. (The criteria are described below.) ・Driving pressure by motor: 1.96 MPa {20 kgf/cm 2 }orbelowat40min -1 with the hoist-up rotational direction ・Drain amount from the hydraulic motor: 0.1 L/min or below at 40 min -1 Qualified Disqualified Install a wire rope. Disassemble and adjust again. Installing the motor and arranging piping ・Arrange piping after the motor is installed. ・Do not install a wire rope because the test is performed with no load. ・Arrange piping so that attaching a pressure gauge and measuring the drain amount from the hydraulic motor are possible. Running in the motor Performance test of motor Motor revolution Loaded condition Rotational direction Running duration 40 min -1 No load Hoist-up 1 min. or longer
F-1 F-1 Winch 9 W526-0430E 2. Support 2.1 General view
F-1 F-1 Winch 10 W526-0430E △ 9 423-119-11000
F-1 F-1 Winch 11 W526-0430E 1. Pin 2. Retaining ring 3. Castle nut 4. Split pin 5. Pin 6. Plain washer 7. Pin 8. Split pin 9. Plate 10. Guide 11. Machine screw 12. Guide 13. Slewing table 14. Frame Assy 15. Catch 16. Wire rope 17. Sleeve 18. Pin 19. Hydraulic motor Assy 20. Hexagon socket head bolt 21. Plain washer 22. Cap 23. Cylinder Assy 24. Grease nipple 25. Nut 26. Spring washer 27. Retaining ring 28. Support 29. Ball bearing 30. Ball bearing 31. Pinion gear 32. Spring 33. Bolt 34. Nut 35. Spring 36. Hexagon socket head bolt 37. Check valve Assy 38. Lever 39. Support 40. Support 41. Steel ball 42. Key 43. ――――――― 44. Pin 45. Bolt 46. Spacer 47. Retaining ring 48. Ball bearing 49. Coupling 50. Bolt 51. Nut 52. Bolt 53. Grip 54. Pin 55. Split pin 56. Plain washer 57. Support 58. Support 59. Bolt 60. Plain washer 61. Machine screw 62. Plain washer 63. Split pin 64. Plain bearing 65. Guide 66. Button bolt 67. Plate 68. Gear Assy Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-cm Treatment 20 M12 122 1250 Apply torque control agent. 36 M10 21.6--24.5 220--250 52 M12 74.0--82.0 760--840 Apply Loctite 2701. [NOTICE] ◆To avoid the plain washers [21] going off center because of the contact between their edge and the motor, orient the cut-off side of each washer toward the motor. Before installing the steel balls [41], apply sufficient grease to their surfaces. Install the pins [44] in correct orientation. ◆Deterioration of paint on the hydraulic motor flange or the mounting surface for the hydraulic motor decreases the tightening force of the bolts [20] and will make the bolts loosened. Before installing the bolts [20], make sure that neither the motor flange surface nor the mounting surfaces for the motor are painted.
12 W526-0430E F-1. F-1. Winch 2.2 Adjusting the jib swing free/lock lever 1. Detach the spring [35] from the pin [39]. (See the figure below.) 2. Tighten the bolt [34] slightly to make the dimension X 15mm. 3.Move the jib swing free/lock lever toward the Y side shown in the figure below. Adjust the bolt [34] to make the force required to shift the lever end when making the steel ball disengaged from the groove on the pin. (See the figure below.) ・ Force required to operate the lever: 24.5 N (2.5 kgf) on the end ・ When the bolt [34] is tightened, the required force increases. ・ When the bolt [34] is loosened, the required force decreases. 4. After the adjustment, lock the bolt [34] with the nut [33]. 5. Attach the spring [35] to the pin [39]. 6. Move the jib swing free/lock lever toward the Z side shown in the figure below. Adjust the bolt [50] to make the force required to shift the lever end when making the steel ball disengaged from the groove on the pin. (See the figure below.) ・ Force required to operate the lever: 24.5 N (2.5 kgf) on the end ・ When the bolt [50] is tightened, the required force decreases. ・ When the bolt [50] is loosened, the required force increases. [NOTICE] ◆Adjust so that the forces required to shift the lever toward the Y side and Z side are equal. 7. After the adjustment, lock the bolt [50] with the nut [51]. 8. Check the following: ・ When the frame is shaken horizontally while the steel ball is engaged in the groove on the pin, the steel ball does not go off the groove. If the steel ball goes off the groove, tighten the bolt [34] for 1/8 turn. △ 2 423-119-10100 △ 9 423-119-11000
F-2 F-2 Hydraulic Motor (for Jib Swing) 13 W102-0670E F-2 Hydraulic Motor (for Jib Swing) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1.1 General view Hydraulic symbol
F-2 F-2 Hydraulic Motor (for Jib Swing) 14 W102-0670E 1.2 Main body 1. Screw 2. Geroler set 3. Drive 4.-- 5. Backup washer 6. End cap 7. Spacer plate 8. Flange 9. Poppet 10. Housing 11. Output shaft 12. -- 13. Thrust bearing race 14. Thrust needle bearing 15. Screw 16. Oil seal 17. Dust seal 18. O-ring 19. O-ring 20. -- 21. Nameplate 22. Rivet 23. Spring pin 24. Plug end cap 25. O-ring 26. -- 27. -- 28. -- 29. Retaining ring 30. Wheel gear 31. Needle bearing 32. O-ring 33. Spring pin 34. Bush plate 35. Bush 36. Mating disc 37. Piston 38. Spring 39. Friction disc 40. Bearing housing
F-2 F-2 Hydraulic Motor (for Jib Swing) 15 W102-0670E Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m Remarks Screw [1] - 31--34 3.1--3.4 Screw [15] - 26--31 2.6--3.2 Apply Loctite 277. Plug end cap [24] - 10--15 1.0--1.5 Port Av G 3/8 49.0 5.0 Port Bv G 3/8 49.0 5.0 Drain port G 1/4 29.4 3.0
16 W102-0670E F-2. F-2. Hydraulic Motor (for Jib Swing) 1.3 Counterbalance valve 1. Valve body 2. Spool 3. Poppet 4. Spring 5. Spring 6. Plug 7. Plug 8. Washer 9. O-ring 10. O-ring 11. O-ring 12. Plug 13. Seat 14. Ball screw 15. -- 16. -- 17. -- 18. Plug 19. Pipe kit Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m Remarks Plug [6] - 31--34 3.1--3.4 Plug [7] - 26--31 2.6--3.2 Apply Loctite 242. Plug [18] - 10--15 1.0--1.5 Wrap a sealing tape. Valve mounting bolt - 29.5--34.0 3.0--3.5 △ 0 366-639-60000
F-3. F-3. Pilot Check Valve (for Jib Elevating Cylinder) 17 W115-0650E F-3 Pilot Check Valve (for Jib Elevating Cylinder) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1. Body 2. Plug 3. Seat 4. Spring 5. Plunger 6. Piston 7. O-ring 8. O-ring 9. --- 10. Packing Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m Remarks Plug [2] 38.2--45.1 3.9--4.6 Apply thread locker. A port G1/4 29.4±3 3.0 ± 0.3 B port G1/4 29.4±3 3.0 ± 0.3 Mounting bolt M10 21.6--24.5 2.2--2.5 Hydraulic △ 1 366-246-30000
i G Boom Telescoping System Contents G-1 Boom................................................. 1 1. Structure .................................................... 1 1.1 Boom .......................................................... 1 1.2 Piping for the boom .................................... 3 1.3 Wiring for automatic charging system ........ 4 1.4 Optical fiber cable....................................... 5 1.5 Wiring for the boom length detector and boom angle detector ............................ 6 2. Disassembly .............................................. 7 2.1 Removing the bucket.................................. 7 2.2 Removing the 2nd boom section ................ 8 2.3 Removing the top boom section............... 11 3. Inspection ................................................ 14 3.1 Boom ........................................................ 14 3.2 Slide plate................................................. 14 3.3 Sheave ..................................................... 14 3.4 Boom telescoping wire rope ..................... 14 4. Adjusting the clearance around the FRP boom .................. 15 4.1 Adjusting the clearance between the frame and the FRP boom ............. 15 4.2 Adjusting clearance in the frame outer support ...................................... 17 4.3 Adjusting clearance between the saddle and the FRP boom ........... 19 5. Assembly ................................................. 20 5.1 Assembling the top boom section ............ 20 5.2 Assembling the 2nd boom section ........... 24 5.3 Assembling the base boom section ......... 30 5.4 Installing the bucket ..................................34 6. Adjustment............................................... 35 6.1 Tension adjustment of hoses and optical fibers (during boom assembling) ........35 6.2 Tension adjustment of hoses and optical fibers (during wire rope adjustment) ...36 6.3 Tension adjustment of hoses and optical fibers (after wire rope adjustment) ......36 6.4 Adjusting wire ropes..................................37 G-2 Counterbalance Valve (for Telescoping Cylinder) ....38 1. Structure .................................................. 38 G-3 Pilot Check Valve (for Telescoping Circuit) .......40 1. Structure .................................................. 40
G-1 G-1 Boom G-1 1 W536-1260E 1 G-1 Boom [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1.1 Boom △ 20 422-025-90000
G-1 G-1 Boom 2 W536-1260E 1. ――――― 2. Top boom section (FRP) 3. Saddle 4. 2nd boom section 5. Base boom section 6. Wire rope 7. Wire rope 8. Roller Assy 9. Pin 10. Castle nut 11. Split pin 12. Plain washer 13. ――――― 14. ――――― 15. ――――― 16. Pin 17. Retaining ring 18. Plate (t0.8) 19. Plate (t0.5) 20. Plate (t0.5) 21. Slide plate 22. Slide plate 23. Plate (t0.6) 24. Plate (t0.5) 25. Plate (t0.5) 26. Plate (t0.8) 27. Nut 28. Plain washer 29. Spacer 30. ――――― 31. Spring washer 32. Button bolt 33. Frame (top boom section) 34. ――――― 35. ――――― 36. ――――― 37. Button bolt 38. Pin 39. Plate 40. Sheave Assy 41. Plate (t0.8) 42. Plate 43. Slide plate Assy 44. Plate (t1.0) 45. Slide plate 46. Button bolt 47. Grease nipple 48. Cap 49. ――――― 50. Retaining ring 51. Plate (t0.8) 52. Plate (t0.5) 53. Plate (t0.5) 54. Plate (t1.0) 55. Hexagon socket head bolt 56. Plate Assy 57. Slide plate 58. Slide plate 59. Plate (t1.0) 60. Plate (t1.0) 61. Plate (t0.6) 62. Pin 63. Plate (t0.8) 64. Slide plate 65. Plate (t0.8) 66. Machine screw 67. Slide plate 68. Slide plate 69. Button bolt 70. Pin 71. Spacer 72. Multi-sheave Assy 73. Retaining ring 74. Cap 75. Sheave Assy 76. Retaining ring 77. Pin 78. Retaining ring 79. Pin 80. Plain bearing 81.――――― 82. Support 83.――――― 84. Bolt 85. Disc spring 86. Bolt 87. Bolt 88. Nut 89. Slide plate 90. Slide plate 91. Plate 92. Nut 93. Spring washer 94. Hose 95. Fastener 96. Nut 97. Bolt 98. Plate 99. Pin 100. Bolt 101. Plate 102. Pin 103. Roller 104. Plate 105. Bolt 106. Plain washer 107. ――――― 108. Button bolt 109. Plain washer 110. Plate 111. Plate 112. Plate (t0.8) 113. Button bolt 114. Support 115. Plate (t0.2)
G-1 G-1 Boom G-1 3 W536-1260E 3 1.2 Piping for the boom △ 10 423-473-40000
G-1 G-1 Boom G-1 4 W536-1260E 4 1.3 Wiring for automatic charging system △ 8 423-563-50000
G-1 G-1 Boom G-1 5 W536-1260E 5 1.4 Optical fiber cable △ 2 424-348-40000
G-1 G-1 Boom G-1 6 W536-1260E 6 1.5 Wiring for the boom length detector and boom angle detector △ 5 423-563-20000
G-1 G-1 Boom 7 W536-1260E 2. Disassembly [NOTICE] The procedure to remove the 2nd--top boom sections is described below. Before removing hoses and cables, put marks on them to facilitate reassembly. Use waste rugs to prevent damage to the rod of the leveling cylinder. 2.1 Removing the bucket 1. Set up the aerial platform level. 2. Swing the boom to the over-side or over-rear. 3. Set a workbench which can support the bucket. Lower the bucket onto the platform, and stop the machine. [NOTICE] Choose a workbench so that the boom becomes parallel to the ground when the bucket is set on the workbench. 4. Operate each manual control levers inside the swing table to its stroke end to release residual pressure in the hydraulic circuits. [NOTICE] When you operate the manual control levers, turn and hold the emergency switch in the "ON" position. 5. Remove the covers from the bucket and top boom section. 6. Disconnect the wiring for the bucket and for the automatic charging system (on the top boom section). 7. Disconnect the optical fiber cable from the signal transmitter on the bucket, and fix it on the head of the top boom section. [NOTICE] If you loop up the optical fiber cable, make the radius of the loops 60 mm or greater to prevent damage to the optical fiber cable.
G-1 G-1 Boom 8 W536-1260E 8. Remove the hose which connects the top boom section and the bucket from the joint on the boom. 9. Disconnect the bucket from the leveling cylinder by removing the pin 1, then remove the pin 2. 10.Separate the bucket from the boom. 2.2 Removing the 2nd boom section 1. Pull the optical fiber cable out of the AMC. Then remove the optical fiber cable from the top face of the boom, and fix it temporarily on the head of the 2nd boom section. [NOTICE] If you loop up the optical fiber cable, make the radius of the loops 60 mm or greater to prevent damage to the optical fiber cable.
G-1 G-1 Boom 9 W536-1260E 2. Remove the nuts (2 pcs.) for the boom extension wire rope. [NOTICE] Before removing the nuts, measure the dimension L shown in the figure below as the reference for reassembly. 3. Remove the high-pressure hoses (2 pcs.) which are connected to the telescoping cylinder. 4. Remove the high-pressure hoses (2 pcs) which are connected to the telescoping cylinder. [NOTICE] When detaching the cord, prevent the cord reel of the boom length detector from pulling the cord all the way. 5. Detach the high-pressure hoses (5 pcs.) from the connecting section. To prevent each hose from overlapping another, fix the hoses on the top face of the 2nd boom section using packaging tapes. [NOTICE] Before removing hoses, put marks on them to facilitate reassembly. 6. Disconnect the wiring for the automatic charging system (on the base boom section) from the wiring for the terminal on the base boom section. (See the figure below.) 7. Detach the wiring for the automatic charging system (on the base boom section) from the base boom section, and attach it to the swing table using a packaging tape, etc.
G-1 G-1 Boom 10 W536-1260E 8. Remove the mounting support and the support on the base boom section from the head of the base boom section. (See the above figure.) Remove the terminal on the base boom section from the base boom section. [NOTICE] The support mounting bolts are very hard to loosen because thread locking agent (Loctite 262T) is applied on them. 9. Remove the multi-sheave block from the top face of the base boom head, and detach the boom retraction wire ropes (2 pcs.) Push the detached boom retraction wire ropes through an elongated hole into the 2nd boom section. Then fix the boom retraction wire ropes on the top face of the 2nd boom section using a packaging tape, etc. [NOTICE] Before removing the wire ropes, measure the dimension L1 shown in the figure below as the reference for reassembly. IW536-065010 L1 10.Remove the slide plates on the top, side and bottom faces of the base boom section head. [NOTICE] The mounting bolts for the upper slide plate Assy and lower slide plate are very hard to loosen because thread locking agent (Loctite 262T) is applied on them. 11. Pull the telescoping cylinder fixing pin out of the base boom section, and remove the anti-buckling bolt. [NOTICE] The anti-buckling bolt is very hard to loosen because thread locking agent (Loctite 262T) is applied on it.
G-1 G-1 Boom 11 W536-1260E 12.Pull the 2nd boom section out of the base boom section. [NOTICE] Prevent the hydraulic hoses, optical fiber cable, and wire ropes on the top face of the 2nd boom section from being crushed between the base boom head and the 2nd boom section. 2.3 Removing the top boom section 1. Remove the connecting pin from the 2nd boom section, and pull out the telescoping cylinder. 2. Remove the rope guide roller Assy from the tail of the 2nd boom section. [NOTICE] The mounting bolts for the rope guide roller Assy are very hard to loosen because thread locking agent (Loctite 262T) is applied on them.
G-1 G-1 Boom 12 W536-1260E 3. Move the hoses and optical fiber cable toward the rear of the boom. Then remove the pin, and pull out the multi-sheave block and sheave Assy on the tail of the 2nd boom section upward. 4. Remove the support 1 (roller Assy) and support 2 (support Assy) inside the 2nd boom section. 5. Remove the covers from the upper face of the 2nd boom section. Remove the slide plates on the top and side faces of the boom and the roller Assy on the bottom face of the boom. The figure below omits a lower-side slide plate. [NOTICE] The mounting bolts for the upper slide plates are very hard to loosen because thread locking agent (Loctite 262T) is applied on them. 6. Pull out the top boom section by approx. 0.5 m. Remove the sheave Assy and button bolt (4 pcs.) for wire rope guide. [NOTICE] The button bolts are very hard to loosen because thread locking agent (Loctite 262T) is applied on them.
G-1 G-1 Boom 13 W536-1260E 7. Pull out the boom extension wire rope slightly forward. Then fix it to the top boom section head using a cord, etc. 8. Pull the top boom section out of the 2nd boom section. 9. Separate the top boom section into the frame (head of the top boom section), the FRP boom, and the saddle (tail of the top boom section). 10. Remove the terminal for the automatic charging system from the support on the frame. 11. Remove the rubber cover from the end of the frame. Remove the pin from the frame, and pull out the leveling cylinder.
G-1 G-1 Boom 14 W536-1260E 12.Detach the joint from the head of the frame. Then separate the joint from the hose. 13.Detach the optical fiber cable from the frame. 3. Inspection 3.1 Boom Check the boom for torsion, deformation, warp or cracks. 3.2 Slide plate Replace cracked or severely worn parts. 3.3 Sheave Replace damaged, deformed or severely worn parts. 3.4 Boom telescoping wire rope [NOTICE] The following wire ropes must not be reused: Deformed or corroded. Kinked. 10% or more wires within one turn of a strand are broken. Decrease in the diameter exceeds 7% of the nominal diameter. Damaged by heat.
G-1 G-1 Boom 15 W536-1260E 4. Adjusting the clearance around the FRP boom [NOTICE] If the shim does not fit or the remaining clearance is too large, decrease or increase the shim pieces. Make the remaining clearance as small as possible. 4.1 Adjusting the clearance between the frame and the FRP boom 1. Measurement of the frame outer dimension (FB) and inner dimension (BBS, BBM, BBL) of the FRP boom Measure the frame outer dimension and the inner dimension of the FRP boom using vernier calipers. The numbers in parentheses shown in the figure represents the standard values. Frame outer dimension: FB (mm) Measure the outer dimension at the center points on the side faces of the frame. (See the figure below.) Inner dimension of the FRP boom: BB1, BB2, BB3 (mm) Measure the inner dimension at the position of the frame mounting bolt holes on the side faces of the FRP boom. (See the figure below.) The measured values of the inner dimension of the FRP boom (BB1--BB3) are represented as below. Minimum of the inner dimension of the FRP boom: BBS Maximum of the inner dimension of the FRP boom: BBL Middle of the inner dimension of the FRP boom: BBM 2. Calculating shim pieces from the minimum of the inner dimension (BBS) of the FRP boom Calculate S1 (difference between the minimum dimension BBS and frame outer dimension FB), and determine the number of the shim pieces. S1=BBS-FB S1/0.8=Na RemainderA(0 A 0.7) 0A0.4: Divide Na pieces of shim (t=0.8mm) in two, and put them in the right and left of the boom. If Na is an odd number, make the shim pieces of either side 1 more than the other. 0.4<A 0.7: Divide Na pieces of shim (t=0.8mm) in two, and put them in the right and left of the boom. Then put 1 piece of the shim (t=0.5mm) in either side. If Na is an odd number, however, make the piece of either side of the shim (t=0.8mm) 1 more than the other. Then put 1 piece of shim (t=0.5mm) in the side of the less pieces of shim. Shim (t=0.8mm): 422-025-90051 Shim (t=0.5mm): 422-025-90061
G-1 G-1 Boom 16 W536-1260E 3. Calculating shim pieces for the medium (BBM) and maximum (BBL) of the inner dimension of the FRP boom Calculate S2 (difference between the medium dimension BBM and minimum dimension BBS) and S3 (difference between the maximum dimension BBL and minimum dimension BBS) and determine the number of the shim pieces. 1) Number of shim piece for S2 S2=BBM--BBS S2 < 0.5: Shim is not necessary. S2 0.5: S2/0.5=Nb RemainderB(0 B<0.5) Divide Nb pieces of shim (t=0.5 mm) in two, and put them in the right and left of the boom. Shim (t=0.5mm): 422-025-90330 2) Number of shim piece for S3 S3=BBL--BBS S3 < 0.5: Shim is not necessary. S2 0.5: S3/0.5=Nc RemainderC(0 C<0.5) Divide Nc pieces of shim (t0.5 mm) in two, and put them in the right and left of the boom. Shim (t0.5mm): 422-025-90330 △ 1 422-025-90900
G-1 G-1 Boom 17 W536-1260E 4.2 Adjusting clearance in the frame outer support [NOTICE] If the shim does not fit or the remaining clearance is too large, decrease or increase the shim pieces. Make the remaining clearance as small as possible. 1. Measurement of the support (A1--A3) and outer dimension (R1--R3) of the FRP boom Measure the frame inner dimension and the outer dimension of the FRP boom using vernier calipers. The numbers in parentheses shown in the figure represents the standard values. Inner dimension of the support: A1, A2, A3 (mm) Measure the inner dimension at the position of the frame mounting bolt holes on the side faces of the FRP boom. (See the figure below.) Outer dimension of the FRP boom: R1, R2, R3 Measure the outer dimension at the position of the frame mounting bolt holes on the side faces of the FRP boom. (See the figure below.) 2. Calculating shim pieces for the maximum clearance Calculate the "maximum clearance between the supports and FRP boom", and determine the number of the shim pieces. Calculate the clearance on the support mounting sections. ClearanceW1=A1--R1 ClearanceW2=A2--R2 ClearanceW3=A3--R3 The maximum value among W1--W3 shall be called WL. WL/0.6=Nd RemainderD When Nd is an odd number: Divide "Nd plus 1" pieces of shim (t=0.6mm) in two, and put them in the right and left of the boom. When Nd is an even number: Divide "Nd plus 2" pieces of shim (t=0.6mm) in two, and put them in the right and left of the boom. Shim (t=0.6mm): 422-027-00111 3. Installing the supports and checking clearance 1. Insert each shim whose piece number is determined as described in the previous sections between the support and FRP boom. Then attach the supports and frame to the FRP boom. 2. Tighten the frame mounting bolts in the following sequence. 1) Tighten the front 2 bolts among the tightening bolts on the top face. 2) Tighten the rear 2 bolts among the tightening bolts on the top face. Then tighten the mounting bolts on side faces in the order of position, uppermost first. Also see the "Assembling the top boom section" described later. Tightening torque of the frame mounting bolts: 186--206 N-m {1900--2100 kgf-cm} Apply torque control agent.
G-1 G-1 Boom 18 W536-1260E 3. After installing the supports, make sure that there is clearance between the bottom face of the frame and the inside of the FRP boom bottom plate. [NOTICE] If there is no clearance between the bottom face of the frame and the inside of the FRP boom bottom plate, attach the frame and the supports all over again. △ 1 422-025-90900
G-1 G-1 Boom 19 W536-1260E 4.3 Adjusting clearance between the saddle and the FRP boom [NOTICE] If the shim does not fit or the remaining clearance is too large, decrease or increase the shim pieces. Make the remaining clearance as small as possible. 1. Measurement of the saddle inner dimension (SB) and outer dimension (BB3) of the FRP boom Measure the saddle outer dimension and the inner dimension of the FRP boom using vernier calipers. The numbers in parentheses shown in the figure represents the standard values. Saddle inner dimension SB (mm): Measure the inner dimension at the position of the mounting bolt holes on the saddle. (See the figure below.) Outer dimension of the FRP boom BB3 (mm): Measure the outer dimension at the position of the saddle mounting bolt holes on the side faces of the FRP boom. (See the figure below.) 2. Calculating shim pieces for the side faces of the boom Calculate the "clearance between the saddle and the side face of the FRP boom", and determine the number of the shim pieces. Clearance on the side face of the boom S5 = SB--BB3 S5/0.8=Ne RemainderE(0 E 0.7) 0E0.4: Divide Ne pieces of shim (t=0.8mm) in two, and put them in the right and left of the boom. If Ne is an odd number, make the shim pieces of either side 1 more than the other. 0.4 <E 0.7: Divide Ne pieces of shim (t=0.8mm) in two, and put them in the right and left of the boom. And add 1 piece of the shim (t=0.5mm) to either side. If Ne is an odd number, however, make the piece of either side of the shim (t=0.8mm) 1 more than the other. Then put 1 piece of shim (t=0.5mm) in the side of the less pieces of shim. Shim (t=0.8mm): 422-025-90220 Shim (t=0.5mm): 422-025-90230 3. Calculating shim pieces for the top face of the boom Calculate the "clearance between the saddle and the top face of the FRP boom", and determine the number of the shim pieces. Attach the saddle on the FRP boom. Check any clearance between the saddle and the top face of the FRP boom at the right and left bolt mounting positions on the top face of the saddle. If there is clearance, insert shims (t=0.5mm and t=1.0mm) between the saddle and the FRP boom to make clearance as small as possible. Shim (t=0.5mm): 422-025-90240 Shim (t=1.0mm): 422-025-90250 △ 1 422-025-90900
G-1 G-1 Boom 20 W536-1260E 5. Assembly 5.1 Assembling the top boom section 1. Attach hoses to the leveling cylinder. 2. Insert the frame, frame outer support and the saddle in the FRP boom. Then adjust the clearance according to the "Adjusting the clearance around the FRP boom" section. After adjustment is completed, remove the frame and frame outer support. 3. Insert the leveling cylinder into the frame, and fix it with pins. Then pass the hose for the leveling cylinder and the optical fiber cable through the frame, out of the tail of the frame. [NOTICE] When installing the leveling cylinder, cover it with corrugated papers to protect the cylinder. Pass the hose and the optical fiber cable through the frame support as shown in the right figure. Before fixing the optical fiber cable, remove the spiral tube at the position to be fixed by a clamp. 4. If the joint to be installed on the frame is already disassembled, reassemble the joint. Connect the hoses P, Dr, T1, and T2 to the assembled joint. Then fix the joint temporarily on the frame. Connect the hoses T1 and T2 to the rear of the T (3/8) shown in the figure below. 5. Check the arrangement of the hoses and optical fiber cable. And bind them in a flat ribbon with a cord so that the arranged order of the hoses and cable is maintained. (For the order, see the figure below.)
G-1 G-1 Boom 21 W536-1260E 6. Measure the inner dimensions at the head and tail of the 2nd boom section. [NOTICE] Record the measured inner dimensions of the 2nd boom section because they are required for the boom clearance adjustment in the step 9. 7. Attach the saddle on the FRP boom. Tightening torque of the mounting bolts: 220--250 N-m {2250--2500 kgf-cm} Apply torque control agent. Give anticorrosive treatment (painting, etc.) to the conical spring washers. 8. Attach slide plates to the top and side faces of the saddle. 9. After installing the slide plates, increase or decrease the shim according to the dimension measured in the step 6 to adjust the clearance. After adjustment, apply thread locking agent (ThreeBond 1401) to the slide plate mounting bolts and lock them. [NOTICE] The vertical clearance around the boom shall be 1--2 mm in total. The horizontal clearance around the boom at its tail shall be 1--2.5 mm in total. The difference of right and left shim piece number shall be 1 or less. Increase or decrease the right and left shim pieces to let the slide plates in even contact with the 2nd boom section bottom. Make sure that the lower slide plates and the head of the FRP boom are free from torsion.
G-1 G-1 Boom 22 W536-1260E 10.If the support has been removed during disassembly, attach it to the bottom face of the frame. Align the end of the support to the section A of the frame. (See the figure below.) Tightening torque of the support mounting bolts: 85--103N-m {870--1050 kgf-cm} B A Frame Bolt (with conical spring washer) Support View B IW536-126007E Bolt (with conical spring washer) 11. Attach the frame and frame outer support to the FRP boom. Tightening torque of the mounting bolts: 186--206 N-m {1900--2100 kgf-cm} Apply torque control agent. After fixing the frame and frame outer support, bend the edges of the plate to prevent the bolts from loosening. Give anticorrosive treatment (painting, etc.) to the conical spring washers.
G-1 G-1 Boom 23 W536-1260E 12.Pass the hoses and optical fiber cable to the tail of the top boom section. [NOTICE] Pass the hoses and optical fiber cables on the support (which is covered by a rubber hose and whose cross section is oval) at the rear end inside the saddle. See the figure below. 13.Fix the optical fiber cable on the frame using clamps. Attach a rubber cover on the frame head. After attaching the rubber cover, fix the joint to the frame. 14.Attach the boom extension wire rope and boom retraction wire rope to the tail of the top boom section. Then fix them with pins and retaining rings. [NOTICE] Attach each pin so that the retaining ring is located inside the boom. Make sure that the retaining rings are inserted and fixed securely. 15.Pass the boom extension wire rope through the hole in the slide plate on the side face at the tail of the tail of the top boom section. Pull its end until the sheathed section of the wire rope comes out of the hole. [NOTICE] Tie up the curved sections of the boom extension wire rope with a cord, and fix the cord to the top boom section.
G-1 G-1 Boom 24 W536-1260E 16.Tie a cord of approx. 5 m long to the threaded section on the end of the boom extension wire rope (in order to facilitate subsequent assembly). 17.Apply boom grease (TADANO genuine) to the surface of the slide plate. 5.2 Assembling the 2nd boom section 1. If the slide plates on the bottom face at the tail of the 2nd boom section have been removed, attach them to the original position. 2. To make the height of the lower slide plates on the 2nd boom section equal, adjust shim based on the top face of the 2nd boom section. [NOTICE] Apply ThreeBond 1401 to the slide plate mounting screws. Tighten each screw and return it for 1/4 turn (so that the attached slide plate can be moved slightly by hand.) Increase or decrease the right and left shim pieces to let the bottom of the base boom section in even contact with the slide plates. The difference of right and left shim piece number shall be 1 or less. 2nd boom section (The lower side is shown upward in this figure.)
G-1 G-1 Boom 25 W536-1260E 3. Bind the boom retraction wire rope, optical fiber cable and hoses in a cluster. Pass them into the 2nd boom section, and out of the top face of the 2nd boom section toward the rear of the boom. [NOTICE] Prevent the optical fiber cable and hoses from being smeared with boom grease. To protect the optical fiber cable and hoses, lay a cardboard over the area between the hole in the top face of the 2nd boom section and the boom tail. 4. While pulling the optical fiber cable, hoses, and wire rope toward the tail of the 2nd boom section, insert the top boom section into the 2nd boom section. 5. Insert the top boom section into the 2nd boom section until the top boom section is exposed approx. 1 m longer than the fully retracted condition. 6. Attach a roller Assy on the bottom of the 2nd boom section. [NOTICE] Do not scratch the FRP boom. 7. Attach the sheave Assy to the head of the 2nd boom section. Reeve the boom extension wire rope on the grooves on the sheaves. Tightening torque of the mounting bolts for the sheave pin: 33--37 N-m {335--375 kgf-cm} [NOTICE] When installing the sheaves, make the retaining rings of the bearing facing toward the outer surface of the boom.
G-1 G-1 Boom 26 W536-1260E 8. Attach a button bolt (upper) to prevent the boom extension wire rope from coming off. Tightening torque for the button bolt: 23--27 N-m {235--275 kgf-cm} Apply thread locking agent (Loctite 262T). 9. Pull the boom extension wire rope until it comes out of the tail of the 2nd boom section. Then remove the cord which has fixed the boom extension wire rope to the top boom section. 10.While pulling the optical fiber cable, hoses, and wire rope toward the tail of the 2nd boom section, insert the top boom section into the 2nd boom section all the way. 11. Visually check that the any of the hoses and optical fiber cable does not overlap another in the boom. [NOTICE] If any of the hoses and optical fiber cable overlaps another, separate them. 12.Attach slide plate on the sides of the 2nd boom section head. And adjust clearance using shims. Then attach a slide plate on the top of the boom section. And adjust clearance in the same way. (See the figure below.) The figure below omits a lower side slide plate. Tightening torque of the upper slide plate mounting bolts: 33--37 N-m {335--375 kgf-cm} Apply thread locking agent (Loctite 262T). [NOTICE] The horizontal clearance around the each slide plate on the side shall be less than 0.2 mm. The vertical clearance around the boom shall be 1--2 mm in total.
G-1 G-1 Boom 27 W536-1260E 13.Install the support 1 (roller Assy) and support 2 (support Assy) in the tail of the 2nd boom section. Tightening torque of the support 1 mounting bolts: 20±1N-m{200±10kgf-cm} [NOTICE] Apply thread locking agent (ThreeBond 1401) to the mounting bolts for the support 1 and support 2. Apply grease to the areas where a hose or optical fiber cable may contact. When placing the plates to adjust horizontal position of the support 1, place the same number of plates on the right and left side. 14.Apply grease to the areas on the hoses and optical fiber cable where the multi-sheave block may contact. 15. Attach the multi-sheave block 2, spacer, and the sheave Assy (for boom retraction) to the 2nd boom section. [NOTICE] When attaching the multi-sheave block, make the R-mark side ("R" is painted in red) face the right side of the boom. Avoid scratching and damaging the hoses. Apply sufficient grease to the rotating section and groove of each sheave. When installing the sheave Assy (for boom retraction), make the retaining ring of the bearing face toward outside of the boom. Make sure that the retaining rings for the pin are inserted and fixed securely.
G-1 G-1 Boom 28 W536-1260E 16.Reeve the optical fiber cable and hoses around the grooves on the multi-sheave block. Reeve the boom retraction wire rope around the groove on the sheave Assy (for boom retraction). [NOTICE] Reeve the optical fiber and hoses around the multi-sheave block so that their layout is as shown in the figure below when viewed from the boom tail. 17.Attach the wire guide roller Assy. Tightening torque of the wire guide roller Assy mounting bolts: 35±2N-m{355±20kgf-cm} Apply locking agent (Loctite 262T). [NOTICE] The clearance between the wire guide roller and the multi-sheave block shall be 1--2 mm. Apply grease to the both ends of each wire guide roller. 18. While pulling the optical fiber cable, hoses, and wire rope for boom retraction toward the boom head, make sure that they are not overlapped one another in the boom, on the boom, or around the multi-sheave block. After the check, remove the cord that holds the optical fiber cable and hoses in a ribbon. 19.Measure the inner dimensions at the head and tail of the base boom section. [NOTICE] Record the measured inner dimensions of the base boom section because they are required for the step 23 and the clearance adjustment in the "Assembling the boom section". Measure these dimensions. Measure these dimensions. Front end of base boom section Rear end of base boom section IW536-065039E 20. Attach the counterbalance valve to the telescoping cylinder. Tightening torque of the mounting bolts: 11.8--13.7 N-m {120--140 kgf-cm}
G-1 G-1 Boom 29 W536-1260E 21. Insert the telescoping cylinder into the 2nd boom section, then fix the cylinder to the boom using a pin. [NOTICE] Make sure that the retaining rings for the pin are inserted and fixed securely. 22. Attach the slide plates on the sides and upper corners at the tail of the 2nd boom sections. 23.After installing the slide plates, increase or decrease the shim pieces according to the inner dimension of the base boom section measured in the step 19 to adjust the clearance based on the bottom face of the 2nd boom section. [NOTICE] In the figure below, the 2nd boom section is installed in the base boom section. Increase or decrease the right and left shim pieces to let the slide plates on the sides and upper corner in even contact with the sides of the base boom section. The vertical clearance around the boom shall be 1--2 mm in total. The horizontal clearance around the boom at its tail shall be 1--2.5 mm in total. The difference of right and left shim piece number shall be 1 or less. Apply thread locking agent (ThreeBond 1401) to the mounting screws for the boom side slide plates. Tighten each screw and return it for 1/4 turn (so that the attached slide plate can be moved slightly by hand.)
G-1 G-1 Boom 30 W536-1260E 24. Apply grease to the areas between the tail of the 2nd boom section and the multi-sheave block on the head of the base boom section (A--B shown in the figure below) on the hoses and optical fiber cable. [When the base boom section has been assembled] A BC Support 1 Multi-sheave Clamp IW536-065038E 25.Apply boom grease (TADANO genuine) to the surface of the slide plate. 26. Insert the 2nd boom section into the base boom section until the 2nd boom section is exposed approx. 1 m longer than the fully retracted condition. 5.3 Assembling the base boom section 1. Pull the boom retraction wire rope to the support on the top face of the base boom section. Then fix the boom retraction wire rope to the support on the top face of the base boom section. Adjust the dimension L1 to the one measured before disassembly. IW536-065010 L1 2. Pass the boom extension wire rope through the hole in the tail of the base boom section, and remove the cord on the end of the wire rope. Then fix the boom extension wire rope to the tail of the base boom section. Adjust the dimension L to the one measured before disassembly. 3. Assemble the slide plate Assys to be attached on the upper area of the base boom section. 4. Attach the slide plates on the top, side and bottom faces of the base boom section head.
G-1 G-1 Boom 31 W536-1260E 5. Increase or decrease the shim according to the dimension measure in the step 23 in the "Assembling the 2nd boom section" section to adjust the clearance on the slide plates. [NOTICE] The vertical clearance around the boom shall be 1--2 mm in total. The horizontal clearance on the each side of the boom shall be less than 1mm difference of right and left shim piece number shall be 1 or less. If you use a shim piece 0.2 mm thick, insert it between thicker shim pieces before installing the shim. Tightening torque of the lower slide plate mounting bolts: 36--40 N-m {370--410 kgf-cm} Apply Loctite 262T or equivalent. Tightening torque of the side slide plate mounting bolts: 19--21 N-m {190--210 kgf-cm} Apply Loctite 1401 or equivalent. Tightening torque of the upper slide plate mounting bolts: 23--27 N-m {235--275 kgf-cm} Apply Loctite 262T or equivalent. Apply thread locking agent (ThreeBond 1401) to the mounting screws for the upper slide plates. Tighten each screw and return it for 1/4 turn. 6. Attach the multi-sheave block on the base boom section head. Connect the hose to the hose connection joint on the top face of the boom. Temporarily fix the optical fibers at tension of approx. 50 N {5 kgf} to the clamps on the base boom section. [NOTICE] When attaching the multi-sheave block, make the R-mark side ("R" is painted in red) face the right side of the boom. 7. Adjust the tension on the hoses and optical fiber hose. See the "Tension adjustment of hoses and optical fibers (during boom assembling)" section later.
G-1 G-1 Boom 32 W536-1260E 8. Attach a button bolt (lower) to prevent the boom extension wire rope from coming off. Tightening torque for the button bolt: 23--27 N-m {235--275 kgf-cm} Apply Loctite 262T or equivalent. After installing the bolt, make sure that each sheave turns in the direction shown in the figure below when the boom extends. 9. Insert the 2nd boom section into the base boom section all the way. Then insert the fixing pin into the telescoping cylinder, and attach the anti-buckling bolt. Apply thread locking agent (Loctite 262T or equivalent) to the anti-buckling bolt. [NOTICE] Tighten the bolt until its head touches the A area. Then lock it using the lock nut. 10.Loosen temporary fixing on the optical fiber. Adjust the tension on the boom retraction wire rope. For details, see the "Adjusting the wire rope" section later. After tension adjustment, attach a vinyl hose to the end of the boom extension wire rope. [NOTICE] Do not pull the hoses beyond the basic dimension (70 mm) as shown below. IW536-065046E ( 70mm ) Multi-sheave Adjusting nut Wire rope for boom retraction Basic dimension
G-1 G-1 Boom 33 W536-1260E 11. After adjustment of the wire rope, attach the optical fiber rope and adjust tension on the hoses and optical fiber ropes. For adjustment procedure, refer to "Tension adjustment of hoses and optical fibers (after wire rope adjustment) 12.Attach the cord for the boom length detector to the 2nd boom section. Apply thread locking agent (ThreeBond 1401) to the threaded section of the rollers and cord fixing bolt. 13.Reeve the wiring for the automatic charging system which has been detached during disassembly. 14.Fix the optical fiber cable and wiring for the automatic charging system on the boom using a clamp. 15.Connect the hose from the swing table to the telescoping cylinder. Connect the optical fiber cable to the AMC on the swing table. 16.Attach the support on the top face of the base boom section, and fix the terminals on the base boom section temporarily. [NOTICE] Attach the support parallel to the top face of the base boom section to facilitate adjustment of terminal position.
G-1 G-1 Boom 34 W536-1260E 17.Fix the terminals for the top boom section on the top face of the base boom section temporarily. 18.Connect the wiring for the terminal with the wiring for the automatic charging. 19.Adjust the position of the terminals for the base boom section and top boom section, and fix the terminals. (For details, see the "Adjusting Procedures (Electric)" in the "Service Manual (circuit diagrams and data)". 5.4 Installing the bucket 1. Attach the bucket to the boom and fix it with the pin 2. Then connect the bucket with the leveling cylinder using the pin 1. 2. Connect the hose from the bucket with the one from the boom. Then fix them using a clamp. 3. Connect the optical fiber cable to the transmitter on the bucket.
G-1 G-1 Boom 35 W536-1260E 4. Connect the wiring for the bucket with the one for the automatic charging system (on the top boom section). Connect the wiring using a clamp. 5. Check the function of the terminal for automatic charging. (For details, see the "Adjusting Procedures (Electric)" in the "Service Manual (circuit diagrams and data)". 6. Attach the covers to the boom and bucket. 6. Adjustment 6.1 Tension adjustment of hoses and optical fibers (during boom assembling) 1. Install the multi-sheave at the head of the base boom section at the minimum-clearance position (so that the pivot of the sheave is 50 mm away from the support on the base boom section). IW536-065045E Multi-sheave Adjusting nut Wire rope for boom retraction Minimum dimension: 50 mm Maximum dimension: 100 mm 2. Install the hydraulic hoses and optical fibers in their place and reeve them on the corresponding grooves in the multi-sheave. [NOTICE] Temporarily fix the optical fibers at tension of approx. 50 N {5 kgf} to the clamps on the base boom section. 3. After installing the optical fibers, visually check from the rear of the boom that they do not touch the boom telescoping cylinder. △ 7 424-006-50100
G-1 G-1 Boom 36 W536-1260E 6.2 Tension adjustment of hoses and optical fibers (during wire rope adjustment) 1. Loosen the temporary fixing for the optical fiber cable. 2. Adjust the tension on and position of the boom retraction wire rope. (See the "Adjusting Wire Ropes" section.) [NOTICE] Do not pull the hoses beyond the basic dimension (70 mm) as shown below. IW536-065046E ( 70mm ) Multi-sheave Adjusting nut Wire rope for boom retraction Basic dimension 6.3 Tension adjustment of hoses and optical fibers (after wire rope adjustment) 1. Loosen the temporary fixing for the optical fiber cable. 2. Move the multi-sheave with the adjusting nuts to the basic dimension (so that the pivot of the sheave is 70 mm away from the support on the base boom section), and then fix it. IW536-065046E (70mm) Multi-sheave Adjusting nut Wire rope for boom retraction Basic dimension 3. Pull the optical fiber cable under the tension of approx. 100 N {10 kgf} and fix it with the clamp at the head of the base boom section or top boom section. [NOTICE] Do not excessively tighten the optical fiber cable, or it will be damaged. Pay attention to the tension value. 3. Make sure that the boom lowered to horizontal or raised to maximum can operate by repeated telescoping through the upper controls without any problem. At this time, check the following: Sag in the hoses or optical fiber cable inside the boom Whether the hoses and optical fiber cable are reeved around the specified grooves △ 7 424-006-50100 △ 7 424-006-50100
G-1. G-1. Boom 37 W536-1260E 6.4 Adjusting wire ropes 1. Retract the boom fully, and set it horizontal. 2. Tighten the adjuster nuts for the boom extension wire rope and boom retraction wire rope so that the following dimensions become as described below: From the center of the top boom pivot pin to the front end of the 2nd boom section: 201 mm From the head of the 2nd boom section to the head of the base boom section (A in the figure below): 264 mm Clearance between saddle and stopper (B in the figure below): 0 mm 3. Tighten the fixing nut on the end of each boom retraction wire ropes by the tightening torque listed below, and lock it. Then tighten and lock the fixing nuts on the end of the boom extension wire ropes in the same way. [NOTICE] ◆There is 1 wire rope at each right and left sides. Tighten the adjusting nuts evenly, alternating from one to the other in order to keep balance between right and left. Thread size and tightening torque Tightening torque Nut Thread size N-m kgf-m For retraction M12 9.8 1.0 For extension M16 15.7 1.6 △ 8 422-016-30000 △ 20 422-025-90000
G-2 G-2 Counterbalance Valve (for Telescoping Cylinder) 38 W119-0171E G-2 Counterbalance Valve (for Telescoping Cylinder) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 0.5 0.8 B A X Y C C D D C B X Y 21 23 22 IW119-0170E01 A B D C D A 0.5 0.8 A 20 15 19 18 17 15 14 16 123456 1 0 71 1 1 3 91 2 8 A D C X-X Y-Y 1. Plug 2. O-ring 3. Body 4. Plug 5. O-ring 6. Spring 7 O-ring 8. Poppet 9. Check valve 10. Spring 11. O-ring 12. Guide 13. Cover 14. Plug 15. O-ring 16. Spring 17. Poppet 18. Piston 19. O-ring 20. Plug 21. O-ring 22. Hexagon socket head bolt 23. Plug
39 W119-0171E G-2. G-2. Counterbalance Valve (for Telescoping Cylinder) Thread size and tightening torque Tightening torque Sign/Port Thread size N-m kgf-m A,B G3/8 49.0 5 1 G1/2 98.0 10 4 G1/8 20.0 2 14 G3/8 49.0 5 20 G3/8 49.0 5 22 M8 25.0--29.0 2.5--2.9 23 R1/8 8.8--11.8 0.9--1.2 Mounting bolt M8 13--15.0 1.3--1.5 △ 1 366-055-10001 △ 0 366-063-30000
G-3. G-3. Pilot Check Valve (for Telescoping Circuit) 40 W115-0640E G-3 Pilot Check Valve (for Telescoping Circuit) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1. Valve body 2. Valve seat 3. Poppet 4. Spring 5. Plug 6. O-ring 7. Piston 8. O-ring 9. Plug Thread size and tightening torque Tightening torque Sign/Port Thread size N-m kgf-m A G3/8 49.0±5 5.0 ± 0.5 B G3/8 49.0±5 5.0 ± 0.5 C,D G1/4 29.4±3 3.0 ± 0.3 Mounting bolt M10 25±2 2.5 ± 0.2 △ 0 366-257-60000 General view Hydraulic symbol
i H Safety System Contents H-1 Length Detector (for Boom) ............ 1 1. Structure and function ................................ 1 2. Disassembly .............................................. 2 3. Reassembly ............................................... 3 4. Replacing the potentiometer ...................... 6
1 W305-0680E H-1 H-1 Length Detector (for Boom) H-1 Length Detector (for Boom) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure and function 1. This detector consists of major parts such as a spiral spring, a cord, and a potentiometer. 2. The cord wound on the drum is unwound or rewound by the spiral spring. The rotational speed of the drum is reduced by a gear train, and the rotation is transmitted to the potentiometer to make the shaft of the potentiometer turn. The electric resistance of the potentiometer varies in proportion to the shaft rotation, and the length can be detected. Connection diagram Potentiometer Total resistance: 2000 ± 100 Ω Mechanical turning angle: 3600° ± 10°
2 W305-0680E H-1 H-1 Length Detector (for Boom) 1. Base plate 2. Case 3. Drum assy 4. Cover 5. Packing 6. Packing 7. Seal connector 8. Bracket 9. Cable assy 10. Potentiometer 11. Nylon clamp 12. Nylon clamp 13. Gear (A) 14. Gear (B) 15. Pin terminal 16. Pin terminal 17. Collar 18. Cord guide 19. Wire assy 2. Disassembly 1. Detach the length detector and the cord end from the positions they are fixed. [NOTICE] When detaching the cord end, prevent the cord reel of the boom length detector from pulling the cord all the way. If the cord is wound up to the point where only approx. 5 cm of the cord remains outside the detector with the potentiometer on its end, the potentiometer may be damaged. 2. While preventing the drum from winding up the cord, wind the portion of the cord remaining outside the detector around the case, and fix the cord using a packaging tape. [NOTICE] Fix the cord firmly to prevent it from slackening during disassembly. 3. Loosen the cord clamp, and open the cover. 4. Disconnect the connection between the cables and potentiometer at terminals, and remove the cover together with the cable from the case. [NOTICE] To facilitate reassembly, put matchmarks on the cover and case. 5. Remove the potentiometer and gear (B) together with the bracket. IW305-0390E04 Gear (A) Potentiometer Gear (B) Bracket 6. Loosen the setscrew and remove the gear (A). 7. Release the cord that is fixed around the case, and let the drum wind up the cord slowly until the spiral spring does not work any more.Then remove the nuts, and separate the case from the base plate. [NOTICE] To facilitate reassembly, put matchmarks under the cord outlet on the cover and case. When releasing the spiral spring tension in the drum Assy, prevent the cord end from hitting the cord outlet.
H-1 H-1 Length Detector (for Boom) 3 W305-0680E 8. Remove the bolt, and separate the drum Assy from the base plate. Drum assy Base plate Bolt IW305-0390E06 9. If it is necessary to replace the cord, remove the entire portion of the old cord from the drum Assy. [NOTICE] If the spiral spring in the drum Assy is broken, replace the whole drum Assy. 3. Reassembly 1. Put a marker for the zero point on a new cord with yellow tape. Then attach an auxiliary cord to the looped cord end. 2. Pass the new cord through the hole of the drum Assy. Then crimp a sleeve-type terminal on the cord end to prevent the cord from coming off. IW305-0390E08 Drum assy Crimp terminal (sleeve type) 3. Wind the new cord around the drum Assy to the zero point indicated by yellow tape, and additionally wind the cord further 4 turns around the drum Assy. Then fix the cord end using a packaging tape to prevent it from loosening. [NOTICE] Wind the cord clockwise as viewed from the side of gear mounting. IW305-0390E09 Gummed tape Wire Shaft to support gear
H-1 H-1 Length Detector (for Boom) 4 W305-0680E 4. Align the yellow tape (zero point) on the drum with the matchmark (indicating the cord outlet position of the drum) which has been put on the base plate during disassembly operation. Then fix the drum Assy to the base plate using a bolt. Drum assy Base plate Bolt IW305-0390E06 5. Apply grease (Moly Speed Grease No. 0) to the gearing portion of the case. 6. Take the end of the cord (auxiliary cord) out of the cord outlet of the case. Then remove the packaging tape that fixes the cord, and place the case over the drum. [NOTICE] When removing a packaging tape, avoid slackening of the cord. After the packaging tape is removed, keep avoiding slackening of the cord. 7. Align the matchmarks that have been put during disassembly on the base plate and case, and fix the case and base plate using nuts. 8. Attach the gear (A) and fix it using a setscrew (1 point). Apply thread locking agent to the setscrew. ・Recommended thread locking agent: Anaerobic high-strength sealant ThreeBond 1324N (made by ThreeBond) 9. Pull the cord all the way out of the cord outlet on the case. Then make the drum slowly rewind the cord. When the yellow tape (zero point) comes to the edge of the cord outlet, stop the drum from further rotating. Wind the cord around the case and fix it with a packaging tape. [NOTICE] Keep the cord tense until the disassembly is completed. To prevent the drum from winding up the cord after the potentiometer is installed, fix the cord firmly. If the cord is wound up to the point where only approx. 5 cm of the cord remains outside the detector with the potentiometer on its end, the potentiometer may be damaged. IW305-0390E11 Yellow tape Gummed tape
H-1 H-1 Length Detector (for Boom) 5 W305-0680E 10.While applying 5-V DC between the black and white terminals (connector terminals 1 and 3) of the potentiometer, adjust the output voltage between the red and black terminals 1 and 2) to the value described below by turning the gear (B) by hand. Output voltage: 0.5 ± 0.05 V ・ If it is not possible to apply 5-V DC, adjust the resistance between the red and black terminals (3 and 2) to the value described below by turning the gear (B) by hand. Resistance: 200 ± 20 Ω 11. After the adjustment of the potentiometer is completed, attach the potentiometer and the gear (B) together with the bracket while engaging the gear (B) with the gear (A). After attaching the bracket, measure either the output voltage or the resistance between the red and black terminals of the potentiometer (connector terminals 1 and 2) again to make sure that the value is within the allowable range. [NOTICE] If the meshing condition of the gears is too strong, the gears may scratch each other. If it is weak, the gears may be disengaged. When attaching the bracket, check the measuring instrument to keep the output voltage within the allowable range. IW305-0390E04 Gear (A) Potentiometer Gear (B) Bracket 12. Pull the cord out of the drum slightly. Make sure that the measured resistance between the red and black potentiometer terminals (connector terminals 3 and 2) increases smoothly when the cord is pulled. 13. Connect the terminals of the potentiometer to the ones of the cable. 14. Attach the cover, aligning the matchmarks that have been put during disassembly. Pay attention to the orientation of the cord clamp. 15.Pull the cable to remove the slack, and tighten the cord clamp. 16.Release the cord fixed around the case, and attach the length detector to the original position. [NOTICE] Install the length detector so that the portion of the yellow tape (zero point) comes to the center of the cord outlet. When attaching the length detector, prevent the drum from winding up the cord. If the cord is wound up to the point where only approx.5 cm of the cord remains outside the detector with the potentiometer on its end, the potentiometer may be damaged.
6 W305-0680E H-1. H-1. Length Detector (for Boom) 4. Replacing the potentiometer 1. Attach a new potentiometer to the bracket, and solder leads to the potentiometer terminals. [NOTICE] Solder the potentiometer and leads as quickly as possible to guard the potentiometer from unnecessary heat. Fix the potentiometer terminals and leads using insulating sealant. The following 2 sealant brands are recommended. ・One-part silicon ThreeBond 1208C or equivalent one-part silicone sealant (ThreeBond) ・ Shin-Etsu Silicone KE45RTV (Shin-Etsu Chemical Co., Ltd.) Orient the terminals of the potentiometer as shown in the figure below. IW305-0390E12 Potentiometer Insulating sealant 2. Attach the gear (B) to the potentiometer shaft, and fix it with a setscrew (1 point). Apply thread locker to the setscrew. ・Recommended thread locking agent: Anaerobic high-strength sealant ThreeBond 1324N (made by ThreeBond) 3. Assemble the length detector according to the steps 10. and after in "3. Reassembly" section. △ 1 361-324-20000
i J Platform (Bucket) Contents J-1 Bucket ............................................... 1 1. Structure .................................................... 1 1.1 Bucket main unit ......................................... 1 1.2 Swing speed reducer.................................. 4 2. Adjusting slide plates for the bucket elevation frame............................... 5 2.1 Adjustment before installing elevating frame...................... 5 2.2 Adjustment during installing the elevating frame ............................. 5 2.3 Operational check of the bucket elevation (after installing the bucket) ................... 5 J-2 Hydraulic Motor (for Bucket Swing)................... 7 1. Structure .................................................... 7 2. Function ..................................................... 9 2.1 Function of the pin brake ............................ 9 2.2 Releasing the pin brake in an emergency................................... 9 3. Geroler set ............................................... 10 3.1 Assembling the Geroler set ......................... 10 3.2 How to insert a roller of the Geroler set (if it comes off the Geroler)................. 10 J-3 Pilot Check Valve (for Bucket Elevating Cylinder) ................11 1. Structure ...................................................11
J-1 J-1 Bucket 1 W546-0290E J-1 Bucket [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1.1 Bucket main unit
J-1 J-1 Bucket 2 W546-0290E 1. Hydraulic motor Assy 2. Hexagon socket head bolt 3. Conical spring washer 4. Swing speed reducer 5. Cam follower 6. ――― 7. Plate 8. Spring washer 9. Bolt 10. Nut 11. Retaining ring 12. Spacer 13. Pin 14. Plate 15. Plate 16. Button bolt 17. Spring washer 18. Spacer 19. Pin 20. Grease nipple 21. Cap 22. Split pin 23. Bolt 24. Plain washer 25. ――― 26. ――― 27. Plate 28. ――― 29. Button bolt 30. Nut 31. Bolt 32. ――― 33. Pin 34. Bolt 35. Spring washer 36. Cylinder Assy 37. Fastener 38. Spacer 39. ――― 40. Guide 41. Slide plate 42. Plate 43. Frame Assy 44. Post Assy 45. Slide plate 46. Frame
J-1 J-1 Bucket 3 W546-0290E Note 1. Apply grease (TADANO Genuine grease TNF) to the sliding surfaces (guide rail, slide plates, cam follower) of the bucket elevation frame. 2. Apply molybdenum grease (Never Seez or equivalent) to the areas of the post Assy which are in contact with the frame Assy or swing speed reducer. Apply grease scrupulously to the splines on the shaft. 3. Strike a grease nipple which is one of the cam follower [5] into the end face of the bolt for the cam follower beforehand. 4. Attach the plate [14] at a correct angle. Thread size and tightening torque Tightening torque Part number Thread size N-m kgf-m 2 M12 55--61 5.6--6.2 5 (Provided nut) ------ 106--118 10.8--12.0 23 M12 74--82 7.6--8.4 31 M12 74--82 7.6--8.4 △ 15 422-671-20000
J-1 J-1 Bucket 4 W546-0290E 1.2 Swing speed reducer 1. Taper roller 2. Worm 3. Taper roller 4. Shim set 5. Spacer 6. Retaining ring 7. Oil seal 8. Gear case 9. Bolt 10. Thrust plate 11. Worm wheel 12. Gear case 13. Ball bearing 14. Oil seal 15. Shaft 16. Plug 17. Dipstick △ 0 366-403-80000
J-1 J-1 Bucket 5 W546-0290E 2. Adjusting slide plates for the bucket elevation frame 2.1 Adjustment before installing elevating frame Before installing the bucket elevating frame onto the bucket swing frame, adjust the slide plate. 1. Refer to the figure in the next page and measure the dimension of the elevating frame (*A) 2. Adjust the shim to make the clearance between the inner faces of the outer slide plates (*B) as described below. See the "Detail of E" in the figure on the next page. *B (clearance between the inner faces of the outer slide plates)... no greater than [*A (dimension of the elevating frame) + 0.5 mm] 2.2 Adjustment during installing the elevating frame Requirement for adjustment ・Bucket elevating unit stowed (with bucket elevating cylinder fully retracted) ・Bucket not installed 1. Make sure that the outer slide plates are at the location described in "Adjustment before installing the elevating frame". 2. Install the bucket elevating frame onto the bucket swing frame while holding the elevating to prevent it from leaning. [NOTICE] ◆If the bucket elevating frame leans due to the mass of the bucket elevating cylinder, remove the cylinder before installing the elevating frame. ◆Before installing the bucket elevating frame, apply grease (TADANO Genuine TNF) to the slide plates, cam floor bearing, and guide rails for the bearing. 3. Turn the adjuster bolts C and D shown in the figure by hand and tighten them until they turn no longer. (The clearance between the slide plate and the elevating frame becomes 0 mm.) [NOTICE] ◆If the turning extent of the adjuster bolts differ, turn both bolt to the smaller extent. 4. Adjust the adjuster bolts A and B in the same manner as the adjuster bolts C and D. 5. Tighten the lock nuts for the adjuster bolts A--D to fix the adjuster bolts. Apply Loctite 262T to the adjuster bolts and lock nuts beforehand. 2.3 Operational check of the bucket elevation (after installing the bucket) 1. After installing the bucket, repeat elevation of the bucket, and make sure that the bucket moves smoothly. 2.If the bucket does not elevate smoothly, remove the upper control panel and the bucket, and adjust the adjuster bolts slightly. If the bucket fails to elevate smoothly even after re-adjustment of the adjuster bolts, start all over again from the adjustment of the shim for the outer slide plates. 3. If re-adjustment is performed, apply thread locking agent (Loctite 262T) to the adjuster bolts and fix them.
6 W546-0290E J-1. J-1. Bucket △ 1 422-671-20010 △ 15 422-671-20000
J-2 J-2 Hydraulic Motor (for Bucket Swing) 7 W102-0112E J-2 Hydraulic Motor (for Bucket Swing) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure Hydraulic symbol General view
J-2 J-2 Hydraulic Motor (for Bucket Swing) 8 W102-0112E 1. Screw 2. Geroler set 3. Drive 4. End cap 5. Seal washer 6. Key 7. Spacer plate 8. Flange 9. Thrust bearing race 10. Output shaft 11. Housing 12. Backup ring 13. Needle bearing 14. Screw 15. Piston pin 16. Oil seal 17. Dust seal 18. O-ring 19. Nameplate 20. Rivet 21. O-ring 22. O-ring 23. Check ball Assy 24. Ball 25. Body 26. Spring 27. Washer 28. Piston cover 29. Screw 30. O-ring 31. Spring Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m Screw [1] -- 20.0--22.6 2.0--2.3 Screw [14] 5/16-2UNF 25.5--31.4 2.6--3.2 Screw [29] M8 20.0--22.6 2.0--2.3 Port A G 1/2 98.0 10.0 Port B G 1/2 98.0 10.0 Pilot port G 1/4 29.4 3.0 Drain port G 1/4
J-2 J-2 Hydraulic Motor (for Bucket Swing) 9 W102-0112E 2. Function 2.1 Function of the pin brake When the pressure on the pilot port increases, the piston moves to the right as the pressure exceeds the spring force. While the motor runs, the drive revolves and rotates. When the pressure on the pilot port decreases, the piston moves to the left due to the spring force and becomes engaged with the pin hole on the end of the drive. The motor is braked as the drive is engaged with the piston and the revolution of the drive is stopped. 2.2 Releasing the pin brake in an emergency (that is, the pressure on the pilot port cannot be increased) Screw a bolt for approx. 10 turns through the drain plug into the threaded hole in the piston to compress the spring and to move the piston pin to the right by 7 mm. The drive will be disengaged from the piston, and its revolution and rotation becomes possible, thus releasing the brake on the motor. [NOTICE] ◆Before releasing the pin brake, make sure that there is no load torque on the motor shaft. Pin brake applied Pin brake released
10 W102-0112E J-2. J-2. Hydraulic Motor (for Bucket Swing) 3. Geroler set 3.1 Assembling the Geroler set [NOTICE] ◆Pay attention to the arrangement of the output shaft, drive and the star of the Geroler set. ◆If the arrangement is incorrect, the motor will turn in the reverse direction. 1. Insert the output shaft in the motor housing with the key groove on the output shaft facing toward you. 2.When the drive is inserted in the output shaft, the valley of a spline will face toward you. 3. Place a spacer plate on the motor housing. 4. Face the side with chamfered splines of star for the Geroler set toward the output shaft. Then engage the star with the splines of the drive with one of its star points 15° counterclockwise away from the center of the key groove. 5. Direction of motor rotation (viewed from the motor output shaft) Pressure port Direction viewed from motor output shaft A Clockwise B Counterclockwise For the position of the ports, see the figure in the "1. Structure" section. 3.2 How to insert a roller of the Geroler set (if it comes off the Geroler) [NOTICE] ÆDuring assembly, do not hit a roller with a hammer, etc. A Geroler has 7 rollers. The rollers may come off during disassembly/assembly of the Geroler set because they are easy to come off. If a roller has come off, pay special attention to reassemble the Geroler set. Reassemble as follows: 1. Install the star with the ring onto the drive. Make sure that arrangement of the star and ring is as shown in the figure in the "3.1 Assembling the Geroler set" section. 2. Insert rollers around the star. 3. If you cannot insert all the 7 rollers, insert 6 rollers first. Then turn the output shaft gradually holding it with pliers in order to make clearance between the star and ring. [NOTICE] ÆBefore holding the shaft with pliers, cover it with a rag to protect the shaft. 4. When sufficient clearance is available between the star and ring, insert the remaining 1 roller. △ 0 366-634-70000 △ 0 366-634-10000
J-3. J-3. Pilot Check Valve (for Bucket Elevating Cylinder) 11 W115-0061E J-3 Pilot Check Valve (for Bucket Elevating Cylinder) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure AB CD IW115-023001 1. Plug 2. O-ring 3. Spring 4. Poppet 5. Piston 6. O-ring 7. Body Thread size and tightening torque Tightening torque Sign/port Thread size N-m kgf-m PortAandB G1/4 26.4--32.4 2.7--3.3 Plug [1] G3/8 44.0--54.0 4.5--5.5 Valve mounting bolt M10 43--49 4.4--5.0 Hydraulic symbol △ 1 366-239-30000
i N Electric System Contents N-1 Control Unit (Accelerator Controller) .......... 1 1. Function ..................................................... 1 2. System configuration ................................. 2 3. Outline of accelerator control ..................... 3 3.1 Operation of accelerator motor................... 3 3.2 Change in engine speed ............................ 3 3.3 Stopping accelerator motor ........................ 3 3.4 Input voltage from potentiometer to detect accelerator motor position .................... 3 4. Adjustment ................................................. 4 5. Conditions of LED indicator on accelerator controller and measures when accelerator cannot work ............................................. 5
N-1 N-1 Control Unit (Accelerator Controller) 1 W316-0121E N-1 Control Unit (Accelerator Controller) 1. Function The accelerator controller has the following controlling functions. - Drives the accelerator motor to make the engine idle when the power is turned on. - Stores the reference voltage for adjustment operations. - Compares the reference voltage with the input voltage from the potentiometer to detect the position of the accelerator motor. - Turns off the output to the accelerator motor once the input voltage reaches the reference voltage.
N-1 N-1 Control Unit (Accelerator Controller) 2 W316-0121E 2. System configuration [NOTICE] This is the case of trucks made by Isuzu utilizing an electronic governor. In some cases the connector numbers do not reflect the actual condition. Refer to the electrical diagram for the actual connector numbers etc.
N-1 N-1 Control Unit (Accelerator Controller) 3 W316-0121E 3. Outline of accelerator control - The accelerator controller controls the engine speed by rotating the accelerator motor in the direction to increase/decrease the engine speed depending on the accelerator 1 and accelerator 2 outputs (Do7 and Do8) from AMC3. - The following explanation is for the case described in the previous section "2. System configuration". (case of trucks utilizing an electronic governor) 3.1 Operation of accelerator motor 1. When increasing the engine speed, the terminal voltages become: ・CN156[6] = 24V ・CN156[3] = 0V This makes the accelerator motor rotate in the direction to increase the speed, and the electronic engine control lever is moved to the "pull" direction. 2. When decreasing the engine speed, the terminal voltages become: - CN156[6] = 0V - CN156[3] = 24V This makes the accelerator motor rotate in the direction to decrease the speed and the electronic engine control lever is moved to the "return" direction. 3.2 Change in engine speed 1.When the electronic engine control lever is moved, the potentiometer for the accelerator that is connected with the lever is rotated. 2. This rotation of the potentiometer causes the input voltage to the electronic governor to change and the engine speed is increased or decreased. 3.3 Stopping accelerator motor In this explanation, the accelerator change from "1st (idling)" or "4th (high)" to "2nd (low)" is used as an example. 1. When the engine speed is increased (decreased), the accelerator motor rotates in the direction of increasing (decreasing) until the input voltage from the potentiometer to detect the accelerator motor position coincides with the reference voltage for the 2nd speed. 2. Once the input voltage from the potentiometer coincides with the reference voltage for the 2nd speed, the accelerator motor stops. At this moment, the accelerator motor mechanism is automatically locked and the motor stop position is retained. 3.4 Input voltage from potentiometer to detect accelerator motor position 1. When the accelerator motor rotates in the direction to increase the engine speed: - The input voltage from the potentiometer to detect the accelerator motor position increases. 2. When the accelerator motor rotates in the direction to decrease the engine speed: - The input voltage from the potentiometer to detect the accelerator motor position decreases. 55 49 4 0 0.73 4.55 4.27 0.31 Cable stroke (mm) Usable range of cable Input voltage from the potentiometer to detect the accelerator motor position IW316-012003E
N-1 N-1 Control Unit (Accelerator Controller) 4 W316-0121E 4. Adjustment [NOTICE] For the adjustment method of the accelerator, refer to Chapter Y "Adjustment of pump revolution speed (accelerator)".
5 W316-0121E N-1. N-1. Control Unit (Accelerator Controller) 5. Conditions of LED indicator on accelerator controller and measures when accelerator cannot work Measure to be taken when the accelerator cannot work Accelerator condition LED condition Condition of accelerator controller Cause (*3) Reset operation Normal After power on, lit on for about 1 second then turned off - - - Always lit on (*1) The potentiometer to detect accelerator motor position is broken. (CN157 1-5 or 2-5) Refer to the following conditions 1 and 2. Condition 1: Wire breakage CN157 1-5 The supply voltage to the potentiometer is not within 4.668 V -- 4.928 V (continuously 50 msec or more) Condition 2: Wire breakage CN157 2-5 The input voltage to the potentiometer is 0.293 V or less. (continuously 50 msec or more) Repeats two blinks (*1) An electric current over 2A flows in the accelerator motor 2 seconds or more. (*4) (Motor rotation is stopped while the motor is being energized.) Repeats three blinks (*2) The accelerator motor operates 10 seconds or more running. Repeats four blinks (*2) Stops the accelerator motor at a place where an error occurs. Wrong positional information for the data written in two places in the memory. (Discrepancy in data) Repeats five blinks (*2) Returns the accelerator motor to the idling (1st) position, then stops the accelerator motor. The input voltage from the potentiometer to detect accelerator motor position is not within: "1st speed reference voltage minus 0.23V" -- "4th speed reference voltage plus 0.23V" (continuous more than 100 msec) (The cable of the accelerator motor moves beyond "4th reference position minus 3mm" -- "1st reference position plus 3mm") When accelerator cannot work (abnormal) Turned off Stops the accelerator motor at a place where an error occurs. Either the output circuit short-circuits or the internal circuit is broken. (Protected by a PolySwitch.) Power off/on the unit When switch box for adjustment is connected After power on, lit on for about 1 second then blinks - - - (*1)Applicable to during normal operation and memory operation (adjustment) (*2)Applicable to only during normal operation (*3)When the accelerator cannot work because the wire between CN157 3 and 6 is broken, the conditions of the LED and the accelerator controller indicate the "normal" condition. (This is because the breaking of the wire between 3 and 6 cannot be detected.) (*4)Maximum output to drive accelerator motor: rating 0.9A △ 0 426-521-31301
i W Option Contents W-1 Overview of Booster ........................ 1 1. Overview and Function .............................. 1 1.1 Booster specification .................................. 1 1.2 Principle of boosting ................................... 1 1.3 Operating cycle .......................................... 2 1.4 Pressure switch on the booster .................. 3 2. Pneumatic control switch and air pressure switch ......................... 4 2.1 Overview..................................................... 4 2.2 Pneumatic control switch operation and booster movement ............................... 4 2.3 Hose on the air pressure switch ................. 4 3. Piping for the booster................................. 5 4. Wiring for the booster ................................ 6 W-2 Hydraulic Booster (with Temporary Hold Function) ......................... 7 1. Structure .................................................... 7 1.1 General view............................................... 7 1.2 Booster main unit ....................................... 8 1.3 Joint assy.................................................... 9 1.4 Pressure detection switch ........................ 10 W-3 Solenoid Valve (for Final Tightening and Release).................................. 11 1. Structure .................................................. 11 W-4 Solenoid Valve (for Temporary Hold) .............12 1. Structure .................................................. 12
W-1 W-1 Overview of Booster 1 WW02-0070E W-1 Overview of Booster 1. Overview and Function Booster increases hydraulic pressure supplied from the hydraulic power takeout circuit on the upper controls to the suitable pressure for operation of a hydraulic compressor and cutter. The hydraulic pressure in the power takeout circuit for the upper controls is 14.2---14.7 MPa {145---150 kgf/cm 2 } Operation of a hydraulic compressor requires pressure of approx. 70 MPa {700 kgf/cm 2 }. Thus a booster is provided to increase the pressure supplied from the power takeout circuit. 1.1 Booster specification Temporary hold function Operating method Control signal Discharge Standard spec. (temporary hold function available) Squeeze frequency method Pulse signal 0.160 L {160 cc} 1.2 Principle of boosting Hydraulic oil discharged from the pump goes through (a) into the primary pressure chamber (ahead of the piston), and compresses the hydraulic oil in the secondary pressure chamber by pushing the boosting piston. (See the figure "Final tightening" below.) The hydraulic pressure in the secondary pressure chamber rises up to approx. 5 times of the one in the primary pressure chamber, due to the difference of the primary pressure chamber's cross sectional area and the secondary chamber's.
W-1 W-1 Overview of Booster 2 WW02-0070E 1.3 Operating cycle Hydraulic circuit of booster 1. Operating cycle of booster The operations of the booster rotate in the order: releasing → temporary hold → final tightening → releasing. 2. Releasing (See the figures in the previous page and above.) When SOL.C of the solenoid valve for final tightening is energized, hydraulic oil goes via P, through the booster port (b), and into the primary pressure chamber (along the rod), and returns the boosting piston. When the boosting piston returns all the way, the steel ball in the boosting piston is pushed by the rod and the check valve opens. Hydraulic oil returning from the HP port goes through the check valve and the port (t), and goes back to the hydraulic oil tank via Dr (drain port). 3. Temporary hold (See the above figure.) When SOL.A of the solenoid valve for temporary hold is energized, hydraulic oil goes via P, through t of the solenoid valve for final tightening and p' of the solenoid valve for temporary hold, and into the port (t). Because the check valve in the booster piston remains open, the hydraulic oil goes through the secondary pressure chamber and HP port, into the compressor. The compressor works with a low pressure because of the relief valve for temporary hold, thus it keeps temporary hold condition. During temporary hold, the relief valve for temporary hold controls the maximum pressure in the booster circuit. As the pressure in the booster circuit is low due to the relief valve for temporary hold, the pressure of the compressor is also low. Opening pressure of the relief valve for temporary hold: 1--2 MPa {10--20 kgf/cm 2 }
W-1 W-1 Overview of Booster 3 WW02-0070E 4. Final tightening (See the figures in the previous page and above.) When SOL.B of the solenoid valve for final tightening is energized, hydraulic oil goes via P, through the booster port (a), and into the primary pressure chamber (ahead of the piston), and pushes the boosting piston. When the boosting piston moves, the oil in the secondary pressure chamber is compressed and supplied through the port HP into the compressor. Due to load resistance of the compressor, the hydraulic pressure in the secondary pressure chamber goes up to the specified level. If the hydraulic oil in the secondary pressure chamber is insufficient, oil is supplied to the secondary pressure chamber through the port (t). 1.4 Pressure switch on the booster The pressure switch installed on the main body of the booster is operated by the oil from the booster, and converts hydraulic pressure into electric signals. It turns ON when the hydraulic pressure in the booster goes up to the specified level, and changes the booster operation from final tightening into releasing. The structure of the switch is shown below. Principle of operation When the hydraulic pressure in the booster reaches the specified level, the oil pushes the rod and the switch turns ON. [NOTICE] For the adjusting procedures of the switch, see the "Adjusting Procedures (Electric)" in the separate "Service Manual (circuit diagrams and data)". △ 1 360-538-41200
W-1 W-1 Overview of Booster 4 WW02-0070E 2. Pneumatic control switch and air pressure switch 2.1 Overview 1. A pneumatic control switch (air balloon switch) is provided with the compressor (or the cutter). To use the switch, connect the air balloon to the connector for the balloon on the upper controls. When the air balloon is squeezed, the air sent to the air pressure switch and the booster works. 2. The air pressure switch is located inside the bucket. The switch is operated by the air sent from the air balloon switch and converts the air balloon operation into electric signals. The operation of the booster changes depending on the electric signal from the air pressure switch. For details, see the next section. For the position of the air pressure switch, see the "Wiring for the booster" later. 2.2 Pneumatic control switch operation and booster movement Relation between the operation frequency on the pneumatic control switch (balloon switch) and the booster operation is listed below. Operation on balloon Booster operation 1st squeeze Temporary hold 2nd squeeze Final tightening 3rd squeeze Release *1 *1: When the hydraulic pressure reaches the specified level during final tightening, the booster operation automatically changes into releasing. 2.3 Hose on the air pressure switch [NOTICE] Do not remove the plug at the end of the hose for the air pressure switch. Do not detach or replace the hose for the air pressure switch. When the ambient temperature rises, the air in the pneumatic control switch (the balloon) will inflate and may cause malfunction of the air pressure switch. To prevent such malfunction, a hose is attached to the air pressure switch. If the air in the balloon inflates, the air in the hose also inflates, thus the air pressure inside the air pressure switch keeps balanced. In this way, the malfunction of the air pressure switch is prevented. △ 0 821-099-03010
W-1 W-1 Overview of Booster 5 WW02-0070E 3. Piping for the booster ・The figure below shows the booster with squeeze frequency method. △ 3 425-027-52000 △ 9 425-027-81000
6 WW02-0070E 6 W-1. W-1. Overview of Booster W-1. 4. Wiring for the booster ・The figure shows the wiring for the booster on AT-146-3-xxx98. △ 2 425-066-41000
W-2 W-2 Hydraulic Booster (with Temporary Hold Function) 7 W185-0150E W-2 Hydraulic Booster (with Temporary Hold Function) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1.1 General view Thread size and tightening torque Tightening torque Mounting bolt Thread size N-m kgf-m SOL (for Temporary hold) M6 122.5 ± 4.9 12.5 ± 0.5 SOL (for final tightening and release) M6 122.5 ± 4.9 12.5 ± 0.5 Sub plate M8 25±2 2.6 ± 0.2
W-2 W-2 Hydraulic Booster (with Temporary Hold Function) 8 W185-0150E 1.2 Booster main unit 1. Side cover A 2. O-ring 3. Backup ring 4. Tube 5. Head 6. Spring 7. Steel ball 8. Packing assy 9. Tube 10. O-ring 11. Backup ring 12. O-ring 13. O-ring 14. Push rod 15. Rod 16. Tube 17. Piston 18. O-ring 19. Backup ring 20. O-ring 21. O-ring 22. Bush 23. O-ring 24. Backup ring 25. Backup ring 26. O-ring 27. O-ring 28. Nut 29. Screw 30. Side cover C 31. Nut 32. Stud bolt 33. Plain washer 34. Nut 35. Hexagon socket head bolt 36. Switch assy Thread size and tightening torque Tightening torque Sign/Port Thread size N-m kgf-m 34 M14 122.5 ± 4.9 12.5 ± 0.5
W-2 W-2 Hydraulic Booster (with Temporary Hold Function) 9 W185-0150E 1.3 Joint assy 1. Sub plate 2. Steel ball 3. Spring seat 4. Spring 5. Plug 6. Poppet 7. Pin 8. Spring 9. Bolt 10. Nut 11. O-ring 12. Plug 13. Orifice
10 W185-0150E W-2. W-2. Hydraulic Booster (with Temporary Hold Function) 1.4 Pressure detection switch 1. Guide 2. Adapter 3. Sleeve 4. Rod 5. Adjuster 6. Lock nut 7. O-ring fixing screw 8. Spring 9. Ram 10. Bracket 11. Switch assy 12. O-ring 13. Backup ring 14. O-ring 15. Backup ring 16. Hexagon socket head bolt 17. Spring washer 18. Grease nipple 19. Plain washer 20. Spring washer 21. Screw 22. Cover 23. Seal 24. Retaining ring Thread size and tightening torque Tightening torque Sign/Port Thread size N-m kgf-m 6 M22×1 25--30 2.55--3.06 △ 0 360-538-41200
W-3. W-3. Solenoid Valve (for Final Tightening and Release) 11 W121-1100E W-3 Solenoid Valve (for Final Tightening and Release) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1. Spring 2. Spring pin 3. O-ring 4. Spool 5. Pin retainer 6. O-ring 7. Armature 8. Kicker spring 9. Kicker pin 10. O-ring 11. Manual override assy 12. Washer 13. Core assy 14. Coil assy 15. Pin 16 Body 17. Spring retainer Thread size and tightening torque Tightening torque Bolt Thread size N-m kgf-m Mounting bolt M6 8--10 0.8--1.0 △ 0 366-403-50000 Hydraulic symbol Electric symbol
W-4. W-4. Solenoid Valve (for Temporary Hold) 12 W121-1110E W-4 Solenoid Valve (for Temporary Hold) [NOTICE] There is a case that the appearance and so on differ from the parts for this machine. Although there is not so much difference in functions and disassembly procedures, make sure of the serial number of this machine and the part sales unit described in the parts catalog before starting disassembling operations. 1. Structure 1. Coil assy 2. Kicker pin 3. Kicker spring 4. Armature 5. O-ring 6. Spool pin 7. Spring pin 8. Spool 9. O-ring 10. Manual override assy 11. Body 12. Spring retainer 13. Spring 14. Pin retainer 15. Core assy 16. O-ring 17. Washer 18. Nut Thread size and tightening torque Tightening torque Thread Thread size N-m kgf-m Mounting bolt M6 8--10 0.8--1.0 △ 0 366-403-60000 Electric symbol Hydraulic symbol
Head Office Ko-34,Sinden-cho, Takamatsu, Japan Overseas Service Group Tadano Ryogoku Bldg. 4-12, Kamezawa 2-chome, Sumida-ku, Tokyo, Japan Tel. 81 (3) 3621-7765 Tel fax 81 (3) 3621-7785 History of revision 1 2 3 4 5